Attachment 2 Submittal Register.pdf

PDF 1009 KB Posted

Attached to
Replace Chiller and Cooling Tower, Bldg 2028 Federal contract opportunity
Solicitation number
FA301620B0007
Issued by
Department of the Air Force Air Education and Training Command

About this file

This is a submittal register for a federal contract to replace a chiller and cooling tower at Joint Base San Antonio - Lackland in Texas. The contractor must provide all labor, materials, equipment, transportation, and supervision to remove an existing water-cooled chiller and cooling tower and replace them with new efficient models, pumps, valves, actuators and piping. The contractor must also implement quality controls and provide documentation including schedules, plans, reports, certifications, and closeout materials. The solicitation number is FA301620B0007 and has a value between $500,000 and $1,000,000. This opportunity is set aside for women-owned small businesses. The response due date is April 22, 2020.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 23 PAGES

Repair Replace Chiller and Cooling tower

01 11 00.10 SD-01 Preconstruction Submittals Salvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 Glist of Contract Personnel

1.4.1.2Installation Access

01 30 00 SD-01 Preconstruction Submittals

1.3 GView Location Map

1.4 GProgress and Completion

Pictures 01 32 01.00 10 SD-01 Preconstruction Submittals

GProject Schedule CPM 01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

1.2 GBaseline Design Schedule

SD-07 Certificates 1.4Monthly Updates

01 33 16.00 10 SD-01 Preconstruction Submittals

1.4.1 GDesign Quality Control Plan

1.4.2.2Initial Design Conference 1.4.2.3Preconstruction Conference

3.4.1 GDCM Procedures

3.7.4 GSubmittal Register

SD-05 Design Data

1.6.1 CDesign and Code Checklists

2.3 CSustainable Design

3.2.1 RInterim Design Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

FA301620B0007 22 APR 2020 Attachment 2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 23 PAGES

01 33 16.00 10 3.5.6.1.1 GInterior And Exterior Building Finishes Scheme

3.5.6.2.3 GFurniture, Fixtures & Equipment

3.6.3Conference Documentation

3.7 RFinal Design Submittals

3.8 CDesign Complete Documents

SD-11 Closeout Submittals

3.7.5 GDD Form 1354

01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.3.1 GFinal High Performance and

Sustainable Building Checklist

1.5.3.1 GFinal Sustainability eNotebook

1.5.3.1 GAmended Final Sustainability

eNotebook

1.5.3.1 GAmended Final High

Performance and Sustainable Building Checklist

3.2 GThird Party Certification

Certificate, Assessment, or Validation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 23 PAGES

01 35 13.30 00 SD-01 Preconstruction Submittals Digital Photos

SD-02 Shop Drawings Surveys File Geodatabase Maps

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3LHE Inspection Reports

SD-07 Certificates 1.5.1.3Crane Operators/Riggers

1.6.6.2 GStandard Lift Plan

1.6.6.3 GCritical Lift Plan

GNaval Architecture Analysis 1.7Activity Hazard Analysis (AHA) 1.8.1Confined Space Entry Permit 1.8.1Hot Work Permit 1.11.4Certificate of Compliance

License Certificates GRadiography Operation Planning

Work Sheet GPortable Gauge Operations

Planning Worksheet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 23 PAGES

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

3.2.2 GAdditional Requirements for

Design Quality Control (DQC) Plan SD-05 Design Data

3.2.2Discipline-Specific Checklists 3.8.1Design Quality Control

SD-06 Test Reports 3.8.2Verification Statement

01 45 00.00 20 SD-01 Preconstruction Submittals GContractor Quality Control (CQC)

Plan 01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-06 Test Reports 2.4Backflow Preventer Tests

SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers

01 54 23.00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 23 PAGES

01 54 23.00 GFor each type of product indicated

01 57 20 SD-01 Preconstruction Submittals

3.11.1.4 GAsbestos Hazard Abatement Plan

GAsbestos Certifications GAsbestos Transporter License GAsbestos Medical clearances

(may be reviewed on site) GAsbestos Training Certificates GAsbestos TDSHS License as applicable

1.6 GEnvironmental Protection Plan

3.16 GEnvironmental Protection Plan

3.1.7 GFish and Wildlife

1.5.1 GEnvironmental Permits

3.7.2Equipment Inventory

SD-06 Test Reports GAny Asbestos Inspection reports that have not been provided by the area specific Environmental Office.

Any Asbestos Inspection Reports that were not included in the original assessment or a results to a change in the scope of work.

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 23 PAGES

01 57 20 G Unsigned copy of State Renovation, Demolition Notifications 15 days prior; G

GLead Work Plans GLead Occupant Protection Plan.

GTexas Department of State

Health Services Lead Licenses GLead Notifications GLead Training Certificates GLead Based Paint Reports GLead Inspection reports

SD-03 Product Data GAsbestos Air Monitoring reports GLead Air Monitoring reports

SD-04 Samples GLead OSHA Negative Exposure

Assessment or GLead Work Plan.

EPA Lead Training GLead Awareness Training certificates GOSHA Air Monitoring GLead Training Certificates GWaste Disposal Plan, May be included in work plan GLead Inspection reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 23 PAGES

01 57 20 GLead Based Paint Reports SD-06 Test Reports

3.1.4.1 GAnalytical Results

01 62 35 SD-01 Preconstruction Submittals

GBiobased Products 01 78 00 SD-03 Product Data

1.4.1Warranty Management Plan 1.4.3Warranty Tags

Spare Parts Data SD-08 Manufacturer’s Instructions

1.4.1Instructions SD-10 Operation and Maintenance Data

3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

GRecord Drawings 1.4.1As-Built Record of Equipment and Materials Final Approved Shop Drawings Construction Contract Specifications

2.1 GCertification of EPA Designated

Items

02 32 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 23 PAGES

02 32 00 3.12 GDrilling Log SD-03 Product Data

1.5Permits, Certifications, and Licenses

1.3.7.1 GSchedule of Drilling, Sampling, and Testing

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.2.2 GDeconstruction Plan

1.11Existing Conditions

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals 3.3.4Receipts

02 51 13 SD-02 Shop Drawings

2.2 GTanks

2.4 GMixers

2.5 GClarifiers

2.9 GInstrumentation and Control

2.10 GStructural Skids

SD-03 Product Data

2.2 GTanks

2.4 GMixers

2.5 GClarifiers

2.9 GInstrumentation and Control

3.5Spare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 23 PAGES

02 51 13 1.8.1Regulatory Requirements

3.4.3 GPre-startup Testing

3.4 GStartup and Operation

3.4.4 GProof of Performance

1.2 GP/C/F System

1.8.2Qualifications

SD-06 Test Reports 3.3.2Tests 3.3Field Quality Control

SD-07 Certificates 3.4.4Equipment Certificate of

Conformance SD-10 Operation and Maintenance Data

3.4.6Operation and Maintenance Manual Updates

02 53 16 SD-02 Shop Drawings

3.1 GLayout

1.3 GThermal Desorption System

SD-03 Product Data

1.5 GSequencing and Scheduling

1.5Mobilization Plan

3.5.1 GStartup Plan

1.13.3 GProof of Performance

3.6.4.6 GOperating Plan

3.8Demobilization Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 23 PAGES

02 53 16 3.7Utilities

3.1.1 GEquipment

1.6 GInstrumentation and Controls

1.13.1Ambient Air Emissions and Noise

Control 1.6.2Redundancies 3.4Logs 3.5.1Control System

SD-06 Test Reports 3.4Logs 3.5Startup

02 55 00 SD-03 Product Data 1.3.1Work Plan 1.5Qualifications 2.2Equipment 3.4.3Quality Control Tests 1.5.2Key Personnel 3.4.1Batch Proportions

SD-06 Test Reports 1.3.3Post Treatment Testing 3.3Field Demonstration

SD-07 Certificates 2.1.2Reagents

02 61 13 SD-02 Shop Drawings 3.1Surveys

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 23 PAGES

02 61 13 1.3 GWork Plan

3.11 GClosure Report

SD-06 Test Reports 2.2Backfill 3.1Surveys 3.5Confirmation Sampling and

Analysis

3.7.1 GSampling of Stored Material

3.7.2 GSampling Liquid

3.9.2Compaction

02 61 23 SD-03 Product Data 2.2Field Screening Test

SD-07 Certificates

1.5.4 GProtection Plan

1.5.5 GPCB Contaminated Soil Removal

Plan

1.5.6 GPCB Contaminated Water

Handling Plan

1.5.7 GSampling and Testing Plan

3.3.4.2 GConfirmatory Grid Sampling Plan

1.5.8Training certification

1.5.9 GCIH qualifications

1.5.10 GPCB Disposal Plan

3.6.1.2Shipping documentation 1.5.11Vehicle decontamination verification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 23 PAGES

02 61 23 3.9Borrow site testing 3.6.2.1Certificate of Disposal

SD-11 Closeout Submittals

1.5.12 GCloseout Report

02 62 16.13 10 SD-03 Product Data

3.1.1 GSVE System Operation Plan

3.1.2 GProcess Monitoring

3.4.1 GContaminated Material Storage

and Disposal

3.2.1 GCompletion Testing

SD-06 Test Reports 3.2.1.3Laboratory Analysis Reports 3.2.1Completion Testing Report

SD-07 Certificates 1.5.4Operator Qualifications 3.4.4.1Maintenance Schedule

SD-10 Operation and Maintenance Data

3.1.1.6 GOperations Reports

3.1.1.7 GOperations Log

3.4.4.2 GMaintenance Log

3.3.2 GContract Completion Report

02 81 00 SD-03 Product Data 2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 23 PAGES

02 81 00 3.2 GOnsite Hazardous Waste Management

3.3Notices of Non-Compliance and Notices of Violation

SD-06 Test Reports

3.7 GRecordkeeping

3.7 GException Report

3.8Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification 3.3.4Security Plan 3.3.5Certificates of Disposal 3.6Waste Minimization

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.7 GLocal Exhaust Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 23 PAGES

02 82 00 3.1.7 GPressure Differential Automatic Recording Instrument

3.1.8 GVacuums

3.1.10 GGlovebags

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6 GPressure Differential Recordings

for Local Exhaust System

3.2.12.2 GEncapsulation Test Patches

3.2.14.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 23 PAGES

02 82 00 1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits[ and Licenses]

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control Records

1.5.8 GProtective Clothing

Decontamination Facility Notification

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 23 PAGES

02 83 00 1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.4 GLicenses, Permits and

Notifications

1.5.5 GOccupant Protection Plan

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.1.1.6 GLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 GInitial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

1.6.7 GNegative Air Pressure System

2.1 GMaterials and Equipment

2.1.1 GExpendable Supplies

3.1.1.5 GLocal Exhaust Equipment

3.1.1.5 GPressure Differential Automatic

Recording Instrument

3.1.1.6 GPressure Differential Log

SD-06 Test Reports

1.3.3 GSampling and Analysis

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 23 PAGES

02 83 00 1.5.2.3 GOccupational and Environmental Assessment Data Report

1.5.2.3 GSampling Results

1.5.3 GPressure Differential Recordings

For Local Exhaust System SD-07 Certificates

1.5.1.3 GTesting Laboratory

1.5.1.4 GThird Party Consultant

Qualifications

3.1.1.1 GOccupant Notification

3.1.1.1 GNotification of the

Commencement of [LBP] Hazard Abatement

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets 02 84 33 SD-07 Certificates

1.7.1Training certification 1.7.2Qualifications of CIH 1.7.3PCB removal work plan 1.7.4PCB disposal plan 1.7.5Notification 3.8Transporter certification 3.5.4Certification of Decontamination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 23 PAGES

02 84 33 3.5.5Post cleanup sampling 3.8.1Certificate of disposal

02 85 00 SD-01 Preconstruction Submittals

1.2.26 GVentilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3 GRespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH) Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11 GDisinfectants or Biocide

Sanitizing Solutions

1.2.14 GFungicidal Agents, (EPA)

1.2.21 GPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 GSafety Data Sheets (SDS) for All

Materials 3.1.4Dehumidifiers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 23 PAGES

02 85 00 3.1.5Air Filtration Units SD-06 Test Reports

1.4.3 GIH Daily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

23 64 10 SD-03 Product Data

2.5 GWater Chiller

1.6.1Verification of Dimensions 2.9Factory Tests 3.6System Performance Tests 3.7Demonstrations 2.6.1Refrigerant 3.5.1Water Chiller - Field Acceptance

Test Plan SD-06 Test Reports

3.5Field Acceptance Testing 3.5.2Water Chiller - Field Acceptance

Test Report 2.9Factory Tests 3.6System Performance Tests

SD-07 Certificates

3.1.8 GRefrigeration System

1.3.1Ozone Depleting Substances

Technician Certification SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 23 PAGES

23 64 10 3.1 GWater Chiller - Installation Instructions

SD-10 Operation and Maintenance Data

3.7 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.4 SIndoor Air Quality During

Construction 23 64 26 SD-03 Product Data

2.2.2.4 GGrooved Mechanical Connections

For Steel

2.6.3 GGrooved Mechanical Connections

For Copper

2.7.8 GCalibrated Balancing Valves

2.7.9 GAutomatic Flow Control Valves

2.7.10Pump Discharge Valve

2.7.11 GWater Temperature Mixing Valve

2.7.12 GWater Temperature Regulating

Valves 2.7.13Water Pressure Reducing Valve 2.7.14Pressure Relief Valve 2.7.15Combination Pressure and

Temperature Relief Valves

2.8.9 GExpansion Joints

2.9 GPumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 23 PAGES

23 64 26 2.8.3Combination Strainer and Pump Suction Diffuser

2.10Expansion Tanks 2.11Air Separator Tanks

2.12 GWater Treatment Systems

SD-06 Test Reports 3.1.1.3Piping Welds NDE Report

3.5.2 GPressure Tests Reports

3.5.3 GCondenser Water Quality Test

Reports

3.5.3 GCondenser Water Quality Test

Reports

3.7 GOne-Year Inspection Report For

Cooling Water SD-07 Certificates

3.1.1.1Employer's Record Documents (For Welding)

3.1.1.2Welding Procedures and Qualifications

2.4Piping for Steam and Condensate 2.5Piping for High-Pressure

Compressed-Air Systems 2.4Fittings 2.5Fittings 2.4Unions 2.5Unions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 23 PAGES

23 64 26 2.4Flanges 2.5Flanges 2.4Gaskets 2.5Gaskets 2.4Bolting 2.5Bolting

SD-08 Manufacturer’s Instructions

3.6 GLesson plan for the Instruction

Course SD-10 Operation and Maintenance Data

2.12 GWater Treatment Systems

2.7.8 GCalibrated Balancing Valves

2.7.9 GAutomatic Flow Control Valves

2.7.10 GPump Discharge Valve

2.7.11 GWater Temperature Mixing Valve

2.7.12 GWater Temperature Regulating

Valves

2.7.13 GWater Pressure Reducing Valve

2.7.14 GPressure Relief Valve

2.7.15 GCombination Pressure and

Temperature Relief Valves

2.8.9 GExpansion Joints

2.9 GPumps

2.8.3 GCombination Strainer and Pump

Suction Diffuser

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 23 PAGES

23 64 26 2.10 GExpansion Tanks

2.11 GAir Separator Tanks

26 24 16.00 40 SD-03 Product Data

2.1 GPanelboards

2.2.5 GFiltered Panelboards

SD-06 Test Reports

3.2 GAcceptance Tests

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .