Attachment 2 -Statement of Work RSS.pdf
PDF 650 KB Posted
- Attached to
- Radar Sensor System (RSS) Federal contract opportunity
- Solicitation number
- 70Z03822RE0000001
About this file
This combined synopsis/solicitation requests proposals for a Radar Sensor System to replace aging equipment on MH-60 and MH-65 aircraft operated by the United States Coast Guard. The contract will have a one-year base period and six one-year option periods, with an anticipated award date of November 28, 2022. Offerors must submit proposals by July 19, 2022 and direct any questions by June 22, 2022. The Coast Guard seeks to procure approximately 180 Radar Sensor Systems over the seven-year period, along with required training, publications, engineering support and a warranty program. The contract will have a firm fixed price and follow a requirements-based model. The solicitation includes attachments covering schedules, statements of work, specifications, terms and conditions and past performance evaluation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 6 Responses to Questions 08.04.2022.pdf | ||
| Amendment 5 Responses to Questions 07.25.22.pdf | ||
| Responses to Questions Amendment 4 dated 07.11.2022.pdf | ||
| Responses to Questions Amendment 3 dated 06.29.2022.pdf | ||
| Responses to Questions Amendment 2 dated 06.23.2022.pdf | ||
| Responses to Questions Amendment 1 dated 06.08.2022.pdf | ||
| Attachment 5 - Past Performance Information Sheet.pdf | ||
| Attachment 3 -Performance Specifications Questionnaire.xlsx | XLSX spreadsheet | |
| Attachment 6 - Non-Disclosure Agreement (NDA) DHS Form 11000-6.pdf | ||
| Attachment 4 - Terms and conditions FAC 2022-6 26 May 2022.pdf | ||
| SOW Attachment 1-Performance Specifications RSS.pdf | ||
| Attachment 1- Schedule of Supplies 70Z03822RE0000001.xls | XLS spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
MH-60T & MH-65E Radar Sensor System
Statement of Work (SOW)
70Z03822RE0000001
1.0 General
1.1 Scope. The Contractor shall manufacture and deliver approximately one-hundred and eighty
(180) MH-60 and MH-65 Radar Sensor Systems (RSS) consisting of commercial hardware and the required software to meet the requirements of this contract, including those requirements found in Statement of Work (SOW) Attachment 1-Performance Specifications. The Contractor shall also provide operator and maintenance training, and engineering support services. This contract shall consist of a twelve (12) month base period, which will provide United States Coast
Guard (USCG) six (6) First Delivery units for testing, and six (6) twelve (12) month option periods for a total performance of seven (7) periods, if exercised.
1.2 Background. The USCG currently operates a fleet of ninety-eight (98) MH-65D/E and forty-five (45) MH-60T aircraft. These aircraft currently utilize the Primus 7000 radar, which is approaching its end-of-life (EOL) due to obsolescence of parts and repairs. The Original
Equipment Manufacturer (OEM) will no longer provide spare parts after December 2021. After
2026, the OEM will no longer support repairs on the current Primus 7000 radar. In order to mitigate potential capability gaps in coverage and enhance future capabilities, the USCG is replacing the existing RSS with a modern system, and creating sustainable support for the future fleet.
1.3 Roles and Responsibilities
1.3.1 Contracting Officer’s Representative (COR). The COR is responsible for the technical administration of the contract and is the technical liaison with the Contractor. The COR IS NOT authorized to change the scope of work or specifications as stated in the contract, to make any commitments or otherwise obligate the Government, or authorize any changes that affect the contract price, delivery schedule, period of performance or other terms or conditions.
The Contracting Officer is the only individual who can legally commit or obligate the
Government for the expenditure of public funds. Technical administration of this contract shall not be construed to authorize revision of the terms and conditions of this contract. Any such revision shall be authorized in writing by the Contracting Officer.
An alternate COR may also be appointed to this contract. In the absence of the primary COR, all responsibilities and functions assigned to the COR shall be the responsibility of the alternate
COR.
1.3.2 USCG Aviation Logistics Center (ALC), Elizabeth City NC- The ALC MH-65 Product
Line (PL) and MH-60 PL will serve as the primary airframe/system integrator for the RSS replacement. The ALC Engineering Service Branch (ESB) will support PLs as needed. ALC is the Government airworthiness authority for the MH-65 and MH-60 Avionics System
Development. ALC will receive and install all RSS components. The RSS will be installed by the USCG at the ALC during each airframe’s planned Programmed Depot Maintenance (PDM) cycle.
1.3.3 RSS Contractor - The Contractor shall provide the RSS, interface control, software, and support for the RSS integration with Common Avionics Architecture System (CAAS) and warranty services for the full seven (7) year period of this contract. The CAAS integrates multiple communications, navigation, and mission subsystems.
2.0 Applicable Documents. The following documents are considered key guidance of laws and regulations to assist the Contractor in the execution of this contract:
MH-60T & MH-65E Radar Sensor System Performance Specifications – SOW Attachment 1
RTCA DO-160 Environmental Conditions and Test Procedures for Airborne Equipment
(Commercially available)
RTCA DO-178 Software Considerations in Airborne Systems and Equipment Certification
(Commercially available)
RTCA DO-173 Minimum Operational (Commercially Available)
DOD Acquisition Guidebook (Commercially Available)
2.1 Precedence. In the event of a conflict or ambiguity, the following order of precedence among documents shall govern:
1. USCG specifications and procedures
2. Federal Aviation Administration (FAA) documents
3. OEM specifications and procedures
4. Applicable commercial documents
2.2 Availability of Documents. The documents listed in section 2.0 are available upon request by the Contracting Officer. To obtain documents, the Contractor must first be registered in the Defense Logistics Agency’s Joint Certification Program. More information on this certification can be found at https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/www.dlis.dla.mil/jcp/.
2.2.1 The USCG will only release these documents to United States (U.S.) businesses that have followed the above procedures. The documents will not be released to any foreign entity. If the
U.S. business plans to release these documents to any foreign entity, they shall first provide the
USCG with a copy of a valid Technical Assistance Agreement (TAA) and DSP-5 authorizing release to that entity.
3.0 System Requirements
3.1 Airworthiness Certification. The Contractor shall maintain OEM and FAA certifications for the repair of all components related to the RSS for the Period of Performance (POP) prescribed herein. The Contractor shall immediately notify the Contracting Officer of the loss of either certification. The Contractor shall ensure software versions are noted distinctly on all equipment documents including inventory management documents and any reports required by the SOW.
3.2 Radar Sensor System. The Contractor shall provide RSS components, related equipment, spare systems, software, test support, documentation, and training.
https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/www.dlis.dla.mil/jcp/
3.2.1 The RSSs performance shall meet the requirements as specified in SOW Attachment 1 -
MH-60T & MH-65E Radar Sensor System Performance Specifications.
3.3 Project Management
3.3.1 Project Manager. The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this contract. The Contractor’s Project
Manager shall be a single point of contact for the COR. The Project Manager shall be one of the senior level employees provided by the Contractor for this work effort. The Contractor shall identify by name the Project Manager, and the names(s) of any alternate(s) who will act for the
Contractor in the absence of the Project Manager. The Project Manager and all designated alternates shall be able to read, write, speak, and understand English fluently. The Contractor shall notify the Contracting Officer whenever program risks are identified that affect contractual deliveries, such as a strike, work stoppages, defective material, and potential recalls.
Additionally, the Contractor shall notify the Contracting Officer within five (5) business days of any event that affects contract deliverables.
3.3.2 Data Management. Unless otherwise specified, the Contractor shall prepare and deliver all data deliverable in electronic format compatible with Windows 10 and Microsoft Office 2016 or later. Data not required to be revised may be provided in Adobe Acrobat 2020 or later by
Adobe Systems, Inc. Due to USCG Internet restrictions, electronic mail attachments over 5MB in size cannot be accepted. The Contractor shall provide all deliverables exceeding the 5 MB file size on Compact Disk (CD) or Digital Video Disk (DVD) with read/write capability. As required, deliverables shall be made in accordance with (IAW) the specified deliverables found in SOW section 11 and throughout this SOW.
3.3.3 Post Award Conference (PAC). The PAC shall be conducted by teleconference within thirty (30) calendar days after contract award. The Contractor shall submit the PAC Agenda five
(5) business days prior to the PAC. The Contractor shall submit a milestone schedule, and PAC minutes within ten (10) business days after the PAC.
3.3.4 Technical Interchange Meetings (TIM). The Contractor plans to conduct a minimum of two (2) TIM’s as required by USCG for the duration of this contract. TIM’s shall consist of technical discussions and exchange of information only; no cost discussions or cost/schedule decisions shall take place without the presence the Contracting Officer. TIM’s will be conducted in-person at the USCG ALC, unless otherwise directed by the USCG. Interchange meeting objectives may include the following:
Review evolving designs and products to ensure that they have met their completion criteria; review and demonstrate proposed technical solutions, provide insight and obtain feedback on the technical effort, and identify and resolve technical issues.
Review project status and identify near-term and long-term risks regarding technical, cost, and schedule issues.
Arrive at agreed-upon mitigation strategies for identified risks, within the authority of those present.
Ensure on-going communications between the Contractor and the USCG.
The Contractor shall review the status of action items, cost, schedule, and the overall performance at each meeting.
The Contractor shall be prepared to discuss significant problems and/or discrepancies in detail.
3.3.4.1 TIM Meeting Agenda and Presentation Materials. The Contractor shall prepare a proposed meeting agenda and presentation material at least fifteen (15) calendar days prior to the scheduled TIM. Contractor Format is authorized.
3.3.4.2 TIM Meeting Minutes/Action Items. The Contractor shall prepare and deliver TIM
Meeting Minutes/Action Items. Draft TIM action items and meeting minutes shall be submitted for USCG edits and additions ten (10) business days following the TIM. Final shall be submitted within ten (10) business days following USCG input to draft. Contractor Format is authorized.
3.4.5 Program Security
3.4.5.1 Protection of Information. Contractor access to proprietary information is required under this contract. Contractor employees shall safeguard this information against unauthorized disclosure or dissemination IAW the Department of Homeland Security (DHS) Management
Directive (MD) 11042.1, Safeguarding Sensitive but Unclassified (SBU) Information. SBU includes information categorized by DHS or other government agencies as: For Official Use
Only (FOUO), Official Use only (OUO), Sensitive Homeland Security Information (SHSI), Limited Official Use (LOU), Law Enforcement Sensitive (LES), Safeguarding Information
(SGI), Unclassified Controlled Nuclear Information (UCNI), and any other identifier used by other government agencies to categorize information as sensitive but unclassified. The
Contractor shall ensure that all Contractor personnel having access to business or procurement sensitive information sign a non-disclosure agreement (DHS Form 11000-6). In addition, in accordance with FAR 9.505-4(b), the Contractor shall be required to execute a non-disclosure agreement with other Contractors.
3.4.5.2 Access. The Contractor shall provide USCG personnel access to relevant RSS technical performance information developed by the OEM’s. Technical performance information includes information pertaining to flight safety, equipment reliability and delivery performance. Inquiries by USCG technical personnel shall be answered as soon as possible and not later than twenty-four (24) hours after requested for flight safety issues. Access will be provided to review manufacturer quality assurance and engineering documentation as required to support USCG flight safety investigations.
3.5 Quality Assurance
3.5.1 Inspections and Tests. The Contractor shall establish an inspection system in accordance with Federal Aviation Administration (FAA) and/or Department of Defense (DoD) procedures for all components. The USCG reserves the right to review the Contractor operation and/or facilities at any time during the period of performance.
3.5.2 Testing Components. The Contractor shall make available to the Government all acceptance test results and discrepancy reports with corrective actions taken with any RSS component under this contract.
3.5.3 Final Inspection and Acceptance. Final inspection and acceptance of material under this contract shall be performed at destination ALC by local Receiving personnel. ALC considers parts Ready for Issue (RFI) upon acceptance. Components determined to be non-RFI upon installation may be returned to the Contractor with a Quality Deficiency Report (QDR).
3.5.4 Configuration Management Program. The Contractor shall have an established
Configuration Management Program with control systems in place for the complete RSS including configuration identification of each hardware and software configuration item for the life of the contract. The Contractor shall ensure hardware and software version consistency for all installed, repaired, and spare systems. The Contractor shall not change or modify any RSS software for the operating system to include performance enhancement and/or product improvement etc. without approval from the Government. Changes other than Class II will not be made without approval from the COR. The Contractor shall provide a draft Configuration
Management Plan at the PAC, and a final Configuration Management Plan ninety (90) calendar days following award.
3.5.5 Serialization. Serial numbers shall be assigned and permanently attached IAW
FAA/DoD(MIL-DTL-18307H) approved procedures.
3.5.6 Notification. The Contractor shall immediately notify the COR upon identification of any quality issue, failure, or situation that could possibly affect the reliability of the RSS.
4.0 Warranty Program
4.1 Warranty Program Plan. The Contractor shall maintain a warranty program plan that ensures a warranty period commencing upon aircraft installation.
4.1.1 The Contractor shall provide at minimum a one (1) year standard commercial warranty.
4.1.2 In addition to the one (1) year standard commercial warranty, the Government desires an extended warranty as proposed by the Contractor, commencing upon the expiration of the one
(1) year standard commercial warranty.
5.0 Integrated Logistics Support
5.1 Sustainment. Engineering support services and product improvement efforts will be performed during the duration of the contract. The contractor shall submit, in writing to the
Contracting Officer and the COR, any plans for configuration changes that would impact aircraft interface features NLT thirty (30) calendar days following identification of such configuration changes so that the Master Identification Data (MID) can be updated. The COR shall have thirty
(30) calendar days to respond to the contractor's plans for configuration change. The contractor shall not proceed with changes without COR approval. The contractor shall notify the USCG
Contracting Officer/Contract Specialist, Project Manager and COR, of any proposed software configuration changes to the USCG’s Systems. Changes shall be submitted in writing, thirty (30) calendar days prior to the proposed software change. No new software configuration changes shall be installed on any of the USCG’s systems without USCG approval. The USCG shall respond to the contractor by written notification within ten (10) working days upon receipt of the proposed change with approval or disapproval. The USCG and the contractor will work together to ensure that any software configurations are mutually managed and approved throughout the life of this contract.
5.2 Product Engineering Changes. The USCG will provide written notification to the contractor when there is a need for a Product Engineering Change Proposal. Within thirty (30) business days after receipt of this notification, the contractor shall submit a proposal to the
Contracting Officer for the non-recurring costs (if any) and an incremental charge to be assessed each time the Product Engineering Change Proposal is incorporated into a system or component.
The proposal shall contain a list of required parts and associated prices based on the parts catalog, the number of engineering and technician labor hours required, and any impact on the contract delivery schedule. The labor rate will be as specified in the schedule of services. The contractor shall fully describe all changes to form, fit, and function of the original design. The contractor shall include any request for deviations, request for waivers, and notice of revisions. Upon agreement of the price for incorporation of the Product Engineering Change
Proposal, the Contracting Officer will issue written notification to the contractor reflecting the incorporation of the approved Product Engineering Change Proposal. The contractor shall not incorporate approved Product Engineering Change Proposals prior to written notification from the Contracting Officer.
5.3 Component Repair Record (CRR). The Contractor shall maintain CRR records for the maintenance performed by the Contractor on a serial number tracked component. The original copy of the CRR shall remain with the component until returned to the Coast Guard. The
Contractor shall maintain a copy of the CRR for a period of ninety (90) calendar days after the item is shipped back to the Coast Guard.
5.4 Special Tools. The Contractor shall include any special tools required for field maintenance or testing with each RSS. The ratio of Special Tool sets to RSS components shall be commensurate with their frequency of use. These tools will be owned and maintained by the
USCG.
5.5 RSS Operator Training. The Contractor shall develop and provide one (1) RSS Operator
Training course annually, as required by the Government, for the purpose of training up to twelve (12) USCG personnel. The contractor shall select qualified personnel that will train
USCG personnel on RSS operation. The trained USCG personnel will train remaining USCG personnel as required.
The Contractor shall provide training material to Aviation Training Center (ATC), Mobile AL or to the Aviation Technical Training Center (ATTC) Elizabeth City, NC. Scheduling of training is dependent on the timing of RSS arrival to operational units and shall be determined by the
Government. Contractor shall provide the (DRAFT) Operator Training Materials for approval sixty (60) calendar days prior to beginning of training. The final syllabus and training materials shall be submitted thirty (30) calendar days prior to beginning of training. Electronic Format
IAW SOW is authorized and shall be reproducible for integration into USCG training materials and manuals.
5.6 RSS Maintenance Training. The Contractor shall develop and provide one (1) RSS
Maintenance Training annually, as required by the Government, for the purpose of training up to twelve (12) USCG personnel. The contractor shall select qualified personnel that will train
USCG personnel on RSS maintenance. The trained USCG personnel will train remaining USCG personnel as required.
The Contractor shall provide training material to ATC, Mobile, AL or to the ATTC, Elizabeth
City, NC. The location of the training will be at Mobile, AL or Elizabeth City, NC. Contractor shall provide the DRAFT Maintenance Training Materials to for approval sixty (60) calendar days prior to beginning of training. The final syllabus and training materials shall be submitted thirty (30) calendar days prior to beginning of training. Electronic Format IAW SOW is authorized and shall be reproducible for integration into USCG training materials and manuals.
5.7 Technical Publication. The Contractor shall provide technical publications, publication updates, amendments and related information during the duration of this contract. The Contractor shall provide an updated digital copy of all OEM-approved required publications including but not limited to the following, ninety (90) calendar days after contract award with a distribution statement to be used within the USCG:
Operator Manual
Maintenance Manual
Troubleshooting Guide
Hardware Interface Control Document (ICD)
Software ICD
Installation Manual
*Portions of some manuals may be combined into single publications
5.7.1 Electronic Format. The Contractor shall provide electronic copies of the deliverables specified in this contract IAW the SOW. The electronic copy will include the current copy publications XML file or ArborText Editor file, graphics file, folder structure, Document Type
Definition (DTD), and Formatting Output Specification Instances (FOSI's). When feasible documents and graphics shall be formatted to facilitate translation into USCG standard publications using the USCG, ALC compatible software as described below.
5.7.2 Documents. Document that are primarily text shall be delivered as follows:
a) XML file linked to applicable graphics in Parametric Technology Corporation (PTC) IsoDraw
-derived .cgm files that shall be capable of being accurately viewed, printed, and modified using
Arbortext Editor versions (14.0 or later)
b) Adobe .pdf files that are electronically searchable
c) Graphics associated with these documents shall also be delivered separately per the following paragraphs.
d) The USCG will accept the COTS Tech Manuals (e.g. in Microsoft Word format).
5.7.3 Graphics. Graphics (drawing, wiring diagrams, or illustration) shall be delivered as follow:
Drawings or wiring diagrams shall be capable of being accurately viewed, printed, and modified in:
a) PTC IsoDraw (version 7.3), or
b) PTC Creo Elements/Direct Drafting (version 19) or
c) Dassault SolidWorks (version 2018), or
d) Predetermined, and agreed upon alternate software, that produces compatible, usable formats (typically source file and an identified “universal” file format such as .cgm, .dxf, .svg.
NOTE: Contact ALC-Engineering Services Division (ESD)-Technical Information
Management Branch (TIMB) for direction if alternate graphic software is requested, prior to initiating development or accepting deliverables.
5.7.4 Illustrations. Illustrations other than drawings or wiring diagrams shall be capable of being accurately viewed, printed, and modified using the latest version of PTC IsoDraw (version
7.3).
NOTE: Contact ALC-ESD-TIMB for direction if alternate graphic software is requested, prior to initiating development or accepting deliverables.
6.0 Delivery Schedule
The following delivery schedule is a rough estimate and in no way holds the USCG accountable to accomplish.
CLIN YEAR # OF UNITS
ESTIMATED
NOTES
0001 1 6 6 First Delivery*
1001 2 1 1 production unit
2001 3 37 32 production aircraft + 5 spares
3001 4 36 31 production aircraft + 5 spares
4001 5 35 30 production aircraft + 5 spares
5001 6 34 29 production aircraft + 5 spares
6001 7 31 23 production aircraft +8 spares
(this estimate of delivery schedule may need to be updated at award)
7.0 SPECIAL INSTRUCTIONS
7.1 Aircraft on Ground (AOG) Situations. Upon notification from the USCG that an AOG situation exists (meaning that a fleet aircraft is unable to perform its mission due to a discrepancy with the Contractor’s installed equipment), the Contractor shall expedite the repair/modification and initiate shipment within seven (7) calendar days or less. Material shipping methods will be determined based on severity of situation, using the most cost effective method available. The shipping container shall be marked on the outside in highly visible lettering “A.O.G.” At the time the Contractor is notified of an AOG requirement, the Contractor shall advise the Contracting
Officer if there are additional shipping charges. The Contracting Officer will provide special shipping instruction and authorization for reimbursement in these instances.
7.2 Disposition of RSS involved in Aircraft Accidents or Incidents. The Contractor shall participate in mishap investigation as required by the direction of the National Transportation
Safety Board whose rules and regulations delegate to the USCG such authority as is appropriate.
Contractor participation in these proceedings will be determined by the president of each accident or incident board and directed by the Contracting Officer.
7.3 Service Bulletins. The Contractor shall modify components as necessary as specified in the latest version of current OEM service bulletins. The Contractor shall comply with mandatory and recommended service bulletins throughout the duration of the contract.
7.4 Optional Service Bulletins. The Contractor will be notified via contract modification of the
USCG’s desire to incorporate optional service bulletins. If additional funds will be required to incorporate optional service bulletins, the Contractor shall advise the COR. The COR will forward his/her recommendation to the Contracting Officer. For service bulletins that required additional funds, the Contractor shall submit a detailed proposal within thirty (30) business days following receipt of notice from the Contracting Officer. This proposal shall include a list of required parts and associated prices based on Contractor’s current commercial catalog minus the best commercial discount or best commercial price (whichever results in the lower price to the
Government). This proposal shall also address the turnaround time needed to effect the modification and the total number of labor hours required. The labor rate will be as specified at a line item and corresponding optional line items. Additional labor charges will not apply for incorporation of service bulletins if they do not result in any “over-and-above” Contractor shop labor. The Contractor shall not incorporate optional service bulletins prior to written notification from the Contracting Officer.
8.0 Travel
8.1 Travel Policy
Performance under this contract may require travel by Contractor personnel. If travel, domestic or foreign, is required, the Contractor is responsible for making all necessary arrangements for its personnel. These include but are not limited to: medical examinations, immunizations, passports/visas/etc., and security clearances. The Government will reimburse the Contractor for allowable travel costs incurred by the Contractor in performance of the contract IAW FAR 31.205-46.
8.1.1 The Contractor shall be responsible for obtaining written approval from the COR, PRIOR to the start of any required travel, unless otherwise directed by the Contracting Officer. The COR will inform the Contractor of any requirements pertaining to the trip (i.e., air or rental car, how many rental cars are authorized, travel dates, etc.). Travel completed without prior COR or Contracting Officer approval or travel that differs from what has been authorized by the COR/Contracting Officer will not be reimbursed.
8.1.2 The Contractor agrees, in the performance of necessary travel, to use the lowest cost mode commensurate with the requirements of the mission and IAW good traffic management principles.
8.1.3 The travel reimbursable herein includes only that travel (commercial carrier, or private automobile or auto rental) performed from the Contractor’s plant to the site of work, or specific
Contractor’s primary location between the sites of work, and from the site of work to the Contractor’s plant. Travel performed for personal convenience (including daily travel to and from work) will not be reimbursed.
8.2 Travel Reimbursement
To be reimbursed for travel, the Contractor’s invoices shall include receipts or other evidence substantiating actual costs incurred for authorized travel. The documentation shall include, but is not limited to, legible copies of all receipts on letterhead (such as lodging, car rental, airline tickets, parking, tolls, etc.).
9.0 Contract Information
9.1 Period of Performance
The contract will consist of one (1) twelve-month base period and six (6) twelve-month option periods covering a total continuous period of seven (7) years, if all option periods are exercised.
9.2 Correspondence Address
Unless otherwise specified in individual task/delivery orders, reports and other documentation listed in the SOW that cannot be provided electronically, shall be provided to the Contracting Officer (one (1) copy) at the following address:
USCG ALC
Engineering Services Division (ESD) Procurement
Attention: Contract # (To be determined at contract award).
Elizabeth City, NC 27909-5001
10.0 Deliverables
ITEM SOW
SECTION
DELIVERABLE/
EVENT
DUE BY DISTRIBUTION
1 3.3.3 Post Award Conference
(Teleconference)
Within thirty (30) calendar days after contract award
Contracting
Officer, COR
2 3.3.3 Post Award Conference
Agenda
Five (5) business days prior to Post Award
Conference
Contracting
Officer, COR
3 3.3.3 Post Award Conference
Milestone Schedule and
Minutes
Within ten (10) business days after Post Award
Conference
Contracting
Officer, COR
4 3.3.4 TIM Meeting As Required/ minimum two (2)
COR
5 3.3.4.1 TIM Meeting Agenda and
Presentation Materials
At least fifteen (15) calendar days prior to the scheduled TIM.
COR
6 3.3.4.2 TIM Meeting
Minutes/Action Items
Draft TIM action items and meeting minutes shall be submitted for
USCG edits and additions ten (10) business days following the TIM. Final shall be submitted within ten
(10) business days following USCG input to draft.
COR
7 3.5.4 Configuration
Management Program
Contractor shall provide the DRAFT
Configuration
Management Plan at
Post Award meeting.
Final Configuration
Management Plan ninety (90) calendar days after contract award. Updates as required.
COR
8 5.5 Operator Training DRAFT Operator
Training Materials for approval sixty (60) calendar days prior to beginning training IAW with the Training Plan.
The final syllabus and training materials shall be submitted thirty (30)
COR
calendar days prior to beginning training.
9 5.6 Maintenance Training DRAFT Maintenance
Training Materials for approval sixty (60) calendar days prior to beginning training IAW with the Training Plan.
The final syllabus and training materials shall be submitted thirty (30) calendar days prior to beginning training.
COR
10 5.7 Operator Manual One (1) digital copy of the operator's manual required ninety (90) calendar days after contract award.
COR
11 5.7 Maintenance Manual One (1) digital copy of the maintenance manual required ninety (90) calendar days after contract award.
COR
12 5.7 Hardware ICD One (1) digital copy of the Hardware ICD ninety (90) calendar days after contract award.
COR
13 5.7 Software ICD One (1) digital copy of the Software ICD required ninety (90) calendar days after contract award.
COR
14 5.7 Installation Manual One (1) digital copy of the Installation Manual required ninety (90) calendar days after contract award.
COR
15 5.7 Troubleshooting Guide One (1) digital copy of the troubleshooting guide required ninety
(90) calendar days after contract award.
COR
16 Terms and
Conditions
Invoice After delivery of each shipment.
Contracting
Officer, COR, ALC Fiscal
17 FAR
52.203-17
Written confirmation
(which may include email) that all employees have been informed in writing of their whistleblower rights and protections.
Within sixty (60) days of award
Contracting
Officer
11.0 List of Appendices and Attachments
The following appendix and attachments are applicable to this contract. Adjustments to these attachments are anticipated; however no changes, additions or deletions will be effective until a contract modification is completed. Any change, addition or deletion, to any of the attachments during the duration of this contract (including options, if exercised) may be initiated by either the
Contracting Officer or the Contractor, with the final decision resting with the Contracting
Officer.
Appendix A Listing of Acronyms
Attachment 1 Performance Specifications
12.0 Off Site Contractor Personnel
Off-site Contractor personnel (prime Contractor or subcontractor) shall not be onboard the
USCG ALC complex without approval from the COR and Contract Specialist. Off-site
Contractor personnel who need to obtain visitor approval for purposes directly related to this contract shall submit a request to the COR and Contract Specialist at least one (1) week prior to the proposed visit unless otherwise approved by the Contracting Officer.
The request shall identify the following:
• Date and time of the visit/meeting
• Purpose of the visit/meeting
• The Government officials requested in attendance
The Contract Specialist or COR will provide a written response in regards to approval or denial of the request. The COR and Contract Specialist will ensure a visitors request is completed and if necessary provide an escort. The Contractor shall hold meetings with their employees off-site and outside of business working hours. Any deviations from the aforementioned policy will be reflected negatively in the Contractor’s Contractor Performance Assessment Reporting System
(CPARS) evaluation.
13.0 Contractor Proposed Cyber/IT-Related Solutions
The offeror or contractor shall identify all cyber/IT-related hardware, software and/or services that are included as part of its’ solution to the government’s requirement to store or process
Coast Guard data or connect to Coast Guard networks or other assets. The offeror or contractor shall provide this information in an electronic delimited file format (for example, csv file, docx table, xlsx table, rtf table or HTML file) as follows in its’ government response to the solicitation.
Contractor Proposed Cyber/IT Related Solutions for CG-6 Review
Product
Name or
Service
Manufacturer or Company
Version
(if any)
Release
(if any)
Quantity
(if any)
Brief
Description
Cost (If not FFP.
Contractor is responsible for also ensuring inclusion in the cost proposal)
Recurring or
Non-
Recurring? If recurring, state frequency
*The remainder of this page is intentionally left blank.
Appendix A - Listing of Acronyms
A.1 Acronyms
A.1.1 The table below is a list of acronyms that can be found in the SOW.
Acronym Definition
ALC Aviation Logistics Center
AOG Aircraft on Ground
ARO After Receipt of Order
ATC Aviation Training Center
CAAS Common Avionics Architecture System
CDR Critical Design Review
CLIN Contract Line Item Number
COR Contracting Officer Representative
COTS Commercial off The Shelf
CPAR Contractor Performance Assessment Reporting System
CRR Component Repair Record
DHS Department of Homeland Security
DTD Document Type Definition
EOL End-of-Life
ESB Engineering Service Branch
FAA Federal Aviation Administration
FSE Field Service Engineer
FOSI's Formatting Output Specification Instances
FOUO For Official Use Only
GFP Government Furnished Property
IAW In Accordance With
ICD Interface Control Document
IDD Interface Design Document
LES Law Enforcement Sensitive
LOU Limited Official Use
MID Master Identification Data
OEM Original Equipment Manufacturer
OUO Official Use Only
PAC Post Award Conference
PDM Planned Depot Maintenance
PDR Preliminary Design Review
POP Period of Performance
QDR Quality Deficiency Report
RFI Ready-For-Installation
RSS Radar Sensor System
Acronym Definition
SBU Sensitive but Unclassified
SDR System Design Review
SGI Safeguarding Information
SHSI Sensitive Homeland Security Information
SIL System Integration Laboratory
SRR Systems Requirement Review
TIM Technical Interchange Meeting
UCNI Unclassified Controlled Nuclear Information
USCG United States Coast Guard
OEM Original Equipment Manufacturer
PDM Programmed Depot Maintenance
PMR Program Management Review
POC Point of Contact
POV Privately Owned Vehicle
PPIRS Past Performance Information Retrieval
PTC Parametric Technology Corporation
PWS Performance Work Statement
QA Quality Assurance
QASP Quality Assurance Surveillance Plan
RFI Ready for Issue
RFP Request for Proposal
RTCA Radio Technical Commission for Aeronautics
SCHR Significant Component History Record
SRU Shop Replaceable Unit
TAT Turnaround Time
TCTO Time Compliance Technical Order
TIMB Technical Information Management Branch
TO Technical Order
TSU Turret Sensor Unit
U.S. United States
USCG United States Coast Guard