Attachment 2 Statement of Work - 1240LU23Q0074 GAOA SZ Toilet Decomm and Install.doc

DOC document 60 KB Posted

Attached to
GAOA SZ Toilet Decomm and Install
Solicitation number
1240LU23Q0074
Issued by

About this file

This statement of work document outlines requirements for a federal contract to decommission and replace two toilet structures located in national forest campgrounds. The contractor will be responsible for pumping, removing, and disposing of two existing toilet structures—a concrete vault at Meadow Creek Campground and a wood frame vault at North Fork Slate Creek Campground. The contractor will then prepare the sites, coordinate delivery of new pre-cast concrete vault toilets provided by the government, and complete installation including backfilling, constructing entrance pads and aprons. The contract requires spill prevention plans, traffic control, fire prevention measures including equipment and a site-specific plan, and environmental protection. A pre-work conference with the Forest Service will be held to finalize plans and schedules. The solicitation was issued by the USDA Forest Service for the SZ Toilet Decommission and Installation project with a price range of $25,000 to $100,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT:

SZ TOILET DECOMMISSION AND INSTALLATION PROJECT

C-1 - PROJECT DESCRIPTION AND LOCATION

DESCRIPTION OF WORK.

A. General

The following work items will be included in the overall project: Decommission and disposal of (2) existing toilet structures, prepare site for new pre-cast single vault concrete toilet, coordinate delivery schedule with manufacturer, and complete installation of two pre-cast concrete vault toilets.

SITE #
SITE NAME
REMOVAL TYPE
REPLACEMENT TYPE
PUMPING REQUIRED
1
Meadow Creek CG
Concrete Vault
Concrete Vault
Yes
2
North FK Slate Creek CG
Wood Vault
Concrete Vault
Yes

Work Description by Site:

1. Meadow Creek Campground - Work includes removal of the existing concrete single vault toilet structure, removal of any concrete materials and removal of any other materials so a new toilet can be delivered and placed in the same location. Work would include pumping the existing toilet unit of any waste materials prior to removing the vault; dismantling and removing the concrete single vault toilet unit; installing erosion control, preparing the excavation area for the new vault toilet including a level subgrade; coordinating the schedule and delivery of the new concrete vault toilet with manufacturer and finally backfilling and finishing site work after the vault toilet is delivered and placed in the site. Final vault installation work shall include any required excavation work to accommodate the new unit, setting the new unit, backfilling after the unit is set, and construction of gravel apron and concrete entrance pad. When all installation work is complete, remove erosion control, and complete final dressing of site to remove evidence of excavation work.

2. North Fork Slate Creek Campground - Work includes removal of the existing wood frame single vault toilet structure, removal of any concrete materials and removal of any other materials so a new toilet can be delivered and placed in the same location. Work would include pumping the existing toilet unit of any waste materials prior to removing the vault; dismantling and removing the wood frame toilet unit; installing erosion control, preparing the excavation area for the new vault toilet including a level subgrade; coordinating the schedule and delivery of the new concrete vault toilet with manufacturer and finally backfilling and finishing site work after the vault toilet is delivered and placed in the site. Final vault installation work shall include any required excavation work to accommodate the new unit, setting the new unit, backfilling after the unit is set, and construction of gravel apron and concrete entrance pad. When all installation work is complete, remove erosion control, and complete final dressing of site to remove evidence of excavation work.

NOTE: The new toilets for install will be provided by the government for both projects detailed above. This requirement is only for pumping, demolition, and disposal of existing toilets, plus installation of the new toilets which the government will provide. The toilets will be ready for install in Spring/Summer 2024.

Price Range. $25,000 - $100,000

C-2 - GOVERNMENT FURNISHED PROPERTY

a. (2) Pre-cast single vault unisex concrete toilet – Aspen style

PROJECT:

SZ TOILET DECOMMISSION AND INSTALLATION PROJECT

SECTION H-SPECIAL CONTRACT REQUIREMENTS

FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Forest Service specialists making physical determination based on surface observations.

b.

Transportation Facilities. For the Meadow Creek CG project site can be accessed from U.S. Highway 14 (paved). North Fork Slate Creek CG is accessed by native gravel surface road.

BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Any open excavation work will require fencing surrounding opening. Coordinate any site closures with Contracting Officer.

Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.

As a minimum, it is anticipated that the following type and number of signs will be required for each site:

Location
Designation
Quantity
Either side of any areas where men are working.
Men and Equipment Working
2

ENVIRONMENTAL PROTECTION

Prevention of Oil Spills. The contractor is required to have a spill plan. When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream, wetland, or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.

Service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

Contractor shall ensure that all personnel involved in handling and packaging the hazardous materials are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous material according to 29 CFR 1910.120). Notify the Forest Service in writing of all hazardous material that may be brought onto the National Forest.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. When necessary provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

FIRE CONTROL

(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area. An equitable adjustment in contract time may be made for this period.

(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with a 4 BC or higher rating.

One - shovel, round point #0 lady or equal.

One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

One - water container (at least 1-gallon capacity), not required with stationary equipment.

(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:

One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.

(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

(08) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

(09) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

(i) All high fire risk operations could be terminated at 1300 local time.

(ii) All burning could be stopped, including debris burning fires.

(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.

(10) Pump and Trailer. NOT USED

PREWORK CONFERENCE

Prior to commencement of work, the COR will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. Also at this meeting such things as work progress schedule and fire prevention and suppression plans shall be developed and established in writing.