Attachment 2 Scope of Work - Plains Area Fire Protection IDIQ.doc

DOC document 86 KB Posted

Attached to
IDIQ Fire Protection - North
Solicitation number
12805B22R0001
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

1.1 DESCRIPTION OF WORK: This project consists of furnishing all labor, equipment, materials, and transportation to perform required fire protection and life safety systems work necessary for the accomplishment of requirements included in this agreement.

1.1.1 Location: Location of the required work will be identified in the Request for Task Order Proposal (RTOP).

1.1.8 Principal Features:

1.1.8.1 Publications – Codes: All work performed shall be IAW ARS Policy and Procedure (P&P) ARS-242.1M, ARS Facilities Design Standards, and National Fire Protection Association (NFPA) Standards listed below:

· NFPA 1 – Fire Code

· NFPA 3 – Commissioning of Fire Protection and Life Safety Systems

· NFPA 4 – Integrated Fire Protection and Life Safety System Testing

· NFPA 10 – Portable Fire Extinguishers

· NFPA 13 – Standard for the Installation of Sprinkler Systems

· NFPA 14 – Installation of Standpipe and Hose Systems

· NFPA 25 – Inspection, Testing and Maintenance of Water-based Fire Protection Systems

· NFPA 45 – Standard on Fire Protection for Laboratories Using Chemicals

· NFPA 72 – National Fire Alarm and Signaling Code

· NFPA 101 – Life Safety Code

· NFPA 150- Fire and Life Safety in Animal Housing Facilities Code

· NFPA 200 – Hanging and Bracing of Fire Suppression Systems In addition the the above code compliance, the contractor shall adhere to the International Building Code, 2021 International Fire Code, United Facilities Guide Specifications (UFGS), and where applicable the National Electric Code (NEC), the Underwriters Laboratories (UL) Standards, all other Standards as may be required by ARS Policy and Procedure (P&P) ARS-242.1M, ARS Facilities Design Standards or as may be further required on individual Statements of Work (SOW) or Performance Work Statements (PWS) provided for each project order. See also section 1.6.

1.1.8.2 Material Quality: All materials and equipment provided under this project shall be of commercial grade quality.

1.1.8.3 List of Materials: The Contractor shall submit a certified list of materials or manufacturer's descriptive literature for all major materials proposed for use in work under this section. Materials furnished under this project shall be standard products of manufacturers regularly engaged in the production of the items, and the most current design which conforms to the requirements specified.

1.1.8.4 Installation, Operation, and Maintenance Instructions: The Contractor shall submit manufacturer's written installation, operation, and maintenance instructions.

1.1.8.5 Qualifications: NICET (National Institute for Certification in Engineering Technologies) establishes the qualifications of an individual as an Engineering Technologist with verification of experience by having a current NICET certification. Contractor shall ensure that fire protection system designers, supervisors, technicians, maintaneance mechanics, and other relevant labor categories working on fire protection systems as part of this contract posess the appropriate NICET certification.

1.1.8.6 Pre-construction Drawings. Pre-construction drawings will not be provided for every project. Government-developed pre-construction drawings will be normally provided for those projects where drawings are necessary in order to clearly depict the scope of work. However, on a project by project basis, the contractor may be required to provide drawings/sketches to clearly present the contractor’s method of accomplishing the ordered SOW or PWS to the Contracting Officer (CO) in enough detail that satisfies the requirements of the government. In such instances, approval of the contractor’s drawings/sketches shall be required prior the contractor proceeding with the project. In addition, the contractor may be required to provide drawings sealed by a Professional Engineer registered in the State in which the work will occur on a project order basis.

1.1.8.7 As-Built Drawings. Whenever government-developed pre-construction drawings are provided, the contractor shall mark up the drawings to clearly indicate all changes made to the project that differ from the original drawings and that indicate as-built conditions. The marked-up drawings shall be provided to the CO at the completion of the project. The drawings shall be reviewed and approved by the CO before final payment is made to the contractor

1.1.8.8 Receipts: Obtain receipts for all salvable items turned in to Government Agencies and submit copies of the receipts to the CO.

1.1.8.9 Clean up. Maintain work area(s) in neat, orderly and safe condition during the course of the work, and cleanup work area(s) at the end of each workday and upon completion of the work. Dispose of refuse, debris, salvable, non-salvable, recyclable, non-recyclable, hazardous materials and hazardous wastes items as specified below.

1.1.8.10 Refuse: Place only ordinary refuse in dumpsters. No vegetative waste, construction and demolition waste, tires, recyclable materials, salvable items, or hazardous materials or waste will be placed in dumpsters. Large amounts of refuse shall be delivered to an off-post landfill and fees paid by the Contractor.

1.1.8.11 Cutting: Accomplish cutting using power tools and equipment which are best suited for the project order being accomplished and least likely to damage adjoining or adjacent surfaces.

1.1.8.12 Patching: Patch adjoining or adjacent surfaces using materials which match the existing materials. Joints and seams shall be durable and as invisible as possible. Restore finishes of patched areas to match the existing finishes.

1.2 DEMOLITION AND DISPOSAL:

1.2.1 Demolition: Demolish or remove from the work site all items designated to be demolished or removed as part of the replacement process, and any other items necessary to accomplish the required work. The Principle Features section in the SOW or PWS may not designate all demolition and removal items existing at the work site. Therefore, prior to beginning demolition or removal work, verify with the CO all items to be demolished or removed and all items to remain. The Contractor is responsible for loading, hauling, and unloading salvage items and debris. The Contractor is also responsible for preparing salvage items for turn in at a location designated in the SOW or PWS.

1.2.2 Removal: Carefully remove salvage items to prevent unnecessary damage to items to be salvaged or portions of components and structures to remain. Salvable items shall be removed and protected to prevent unnecessary damage. Items, embedded in concrete or masonry, or which are otherwise nonremovable, shall be neatly cut off at or beneath the surrounding surface. Open piping or conduit shall be capped or plugged, and the surrounding surface repaired as specified. Asphalt and concrete being removed shall be removed along saw cut lines. Fire Stopping as appropriate shall be provided.

1.3 DISPOSITION OF CONSTRUCTION AND DEMOLITION WASTE ITEMS:

1.3.1 Non-salvable and Non-recyclable Items: Construction materials and debris, which will have no salvage or recycling value because of the type of material, or the procedures required for dismantling or demolition, shall be disposed of at an off-post landfill or as directed by the SOW, PWS or CO. Unless otherwise indicated, non-salvable items include: refuse; vegetative waste; tires; miscellaneous concrete and masonry items; wood and wood products; nonmetallic roofing materials; wood doors, door frames, windows, trim, and glazing; gypsum wallboard, plaster, and acoustical ceiling board; floor and wall coverings; and nonmetallic plumbing, mechanical, and electrical components. Also reference Specification 01 01 00 General Conditions rev May 22,2019.

1.3.2 Salvable and Recyclable Items: Construction materials, which have salvage or recycling value, or which can be dismantled or removed without damage, shall be recycled in location appropriate area or as directed by the CO. Unless otherwise indicated, salvable items include: chain link fence components; sheet metal items including siding, flashings, roofing, fasciae, soffits, gutters, and downspouts; metal doors, door frames, builder’s hardware, and windows; metal toilet and bath accessories; metal toilet partitions; appliances; metal pipe, pipe fittings, and valves all with insulation removed; metal plumbing fixtures and serviceable vitreous china plumbing fixtures; fire protection equipment and appurtenances; HVAC equipment and appurtenances; and electrical components, equipment, and fixtures. Cardboard shall be turned in to a local Recycle Center, if one exists.

1.3.3 Hazardous Materials (HM) and Hazardous Wastes (HW):

1.3.3.1 Disposition of Contractor-Owned HM and HW: Contractor owned hazardous materials and hazardous waste are the property of the Contractor and must be handled, stored and disposed of by the Contractor, in accordance with all federal and state regulations.

1.3.3.2 Disposition of HM and HW from Government Sources: Hazardous materials and the wastes generated from the use of those materials shall be handled, stored and disposed of by the Contractor at locations in accordance with all federal and state regulations unless approval for on-location disposal is obtained from the CO.

1.3.3.3 Spills of Hazardous Material: Report all spill of hazardous materials to location point of contact identified in each SOW and PWS and also to the CO.

1.4 LEAD-BASED PAINT (LBP): Lead-based paint may be encountered in the building(s) in this contract. All painted surfaces will be treated as though they have been coated with lead-based paint and compliance with EPA, OSHA and location, Local and State regulations for handling is required unless otherwise tested or certified by contractor as known to not contain LBP. If cutting or any other operation is necessary which could cause particles to become airborne, paint shall be removed by acceptable methods prior to the operation. No sanding of existing painted surfaces will be allowed unless surface is tested to be non-LBP or certified by contractor as known to not contain LBP. Certified contractor personnel shall perform lead-based paint abatement. Contractor personnel involved in the abatement of lead-based paint shall be trained and certified in accordance with 40 CFR 745 and Local or State regulations where work is located. The following shall be submitted to the CO prior to commencing lead abatement: paint Supervisor’s certificate, worker’s proof of license and/or registration in the State work is performed to remove LBP. The person removing lead-based paint shall provide as a minimum, certification indicating the 8-hour lead-based paint awareness training. The person supervising lead-based paint removal shall provide certification from the 40-hour lead-based paint supervisor training. Contractor may employee a certified lead-based paint abatement subcontractor to perform lead-based paint abatement. Certification documentation of subcontractors is required and shall be the responsibility of the contractor to obtain and provided to and approved by the CO prior to the start of work regarding lead-based paint abatement.

1.5 ASBESTOS: Asbestos may be encountered in the building(s) in this project. All suspected asbestos containing materials will be treated as though they contain asbestos and compliance with OSHA regulations for handling is required. If cutting or any other operation is necessary which could cause particles to become airborne, asbestos shall be removed by acceptable methods prior to the operation. A certified contractor shall perform asbestos abatement. The following shall be submitted to the CO prior to commencing asbestos abatement: Asbestos Contractor Certificate, Asbestos Workers Certificates and State notification (if required). Manifests of ACM disposals shall be provided to the CO on a weekly basis.

1.6 ADDITIONAL APPLICABLE PUBLICATIONS: ARS P&P 242.1M and Specification 01 01 00 General Conditions rev May 22,2019 listed below form a part of this section to the extent referenced. Publication is referred to in the text by basic designation only. Publication shall be assumed to be the most current edition in effect at the time a contract is awarded.

ARS Policy and Procedure (P&P) ARS-242.1M, ARS Facilities Design Standards

Specification 01 01 00 General Conditions rev May 22,2019

1.7 SUBMITTALS:

1.7.1 Accident Prevention Plan and Site-Specific Safety Plan: Submit an Accident Prevention Plan initially for the IDIQ and minimum yearly thereafter. Submit a Site-Specific Safety Plan for each task order per Section 1.9.

1.7.2 Quality Control Plan: Submit a Quality Control Plan.

1.7.3 Other Submittals: See specific Scope of Work sections.

1.8 GENERAL REQUIREMENTS:

1.8.1 Verification of Conditions and Dimensions: Read and understand the Scope of Work and visit the work sites to become thoroughly familiar with details of the required work and site conditions, verify all dimensions prior to ordering materials and fabricating components, and notify the Contracting Officer of any discrepancies between the Scope of Work and actual conditions. All discrepancies shall be resolved before the Contractor begins work. It is strongly suggested the Contractor verify conditions and dimensions prior to preparing and submitting his bid.

1.8.2 Delivery and Storage: Deliver materials to the work site in undamaged, unopened manufacturer's standard packaging or containers. Store materials to protect them from physical damage, theft, vandalism, and weather.

1.8.3 Marking and Labeling: Manufacturer's standard packaging and containers, or when appropriate, individual pieces of material shall be marked or labeled showing the name of the manufacturer; brand name; model number, stock number, or other designations; item description; and when applicable, the stamp of a nationally recognized, independent testing laboratory or agency, certifying materials conform to the requirements specified.

1.8.4 Proprietary Products: Unless otherwise specified, proprietary products indicated in the Project Scope of Work or noted on the plans are intended to establish capacities, color, design, features, pattern, quality, and style of materials desired, and are not intended to limit trade. Materials proposed for use which can be determined by the CO to conform to the requirements specified, may be substituted and installed after his approval.

1.8.5 Coordination: Coordinate work performed by specific trades with work performed by other trades to the extent required. The contractor shall provide notification to and shall coordinate all utility outages with all affected activities a minimum of two working days in advance of the outage. Notification shall be by written and posted in a conspicuous location at the entrance to occupied facilities, if applicable, and by oral communication with key occupants in the facilities affected.

1.8.6 Identification Cards: All Contractor and Subcontractor personnel shall wear identification cards while working at Fort Riley. Identification cards shall show a photograph of the employee; name of employee; and name, address, and phone number of the Contractor or Subcontractor.

1.8.7 Vehicle Identification: All Contractor and Subcontractor vehicles and equipment shall bear the Contractor or Subcontractor's name or logo while the vehicles and equipment are working at a location. Names or Logos shall be applied to both sides of vehicles and equipment as a minimum.

1.8.8 Location Access: Contractors will be given specific requirements for contractor access to each location for each project order in the SOW, PWS or at the preconstruction meeting. At the present time and until further notice, all delivery trucks are to enter designated areas at each location which will be detailed for each project order. Locations do not provide overnight parking. All shipments must be accepted and off loaded the same day. Passengers may be required to present a valid state driver’s license/photo ID.

1.8.8.1 For security reasons, the bill of lading shall have the name and phone number of the location delivery point of contact. This includes the bill of lading presented by third party and subsequent shippers. The location retains the right to refuse entry to the location grounds. Refusal of entry shall not relieve the prime contracted vendor from their responsibility to deliver as agreed to, nor shall there be an additional cost to the Government resulting from refused entry.

1.9 SAFETY AND PROTECTION:

1.9.1 Safety Requirements: The contractor shall implement health and safety criteria and practices sufficient to protect on-site personnel, the public, and the environment. The contractor shall take safety precautions to protect workmen, building occupants, and the public from construction equipment and materials being removed and/or installed at the work site. The contractor shall maintain free and safe passage into and out of adjoining or adjacent building and areas not part of this project. Minimum personnel safety gear requirements shall include hardhat, safety footwear, safety glasses and hearing protection when required. A first-aid kit shall be on every job site. A fire extinguisher shall be on every job site where the possibility of fire exists. The contractor shall comply with EM 385-1-1 while performing the required work in this contract.

1.9.2 Accident Prevention Plan - IDIQ: The contractor shall prepare an Accident Prevention Plan in accordance with the following sub-paragraphs and submit it to the CO for approval for the IDIQ. The contractor shall implement the approved Accident Prevention Plan not later than prior to the first project order being issued under this contract. The contractor should refer to EM 385-1-1, paragraph 01.A.07 for further guidance.

1.9.2.1 Basic Plan. The plan shall contain the name of the contractor’s organization, contract number and a brief description of the work to be performed. The plan shall include the name of the person(s) responsible for safety. The plan shall outline the responsibilities of each employee to comply with applicable safety and occupational health requirements, wearing prescribed safety and health equipment, reporting unsafe conditions/activities, preventing avoidable accidents and working in a safe manner. The plan shall identify the policies and procedures regarding noncompliance with safety requirements to include disciplinary actions for violation of safety requirements. The plan must be approved by company officers authorized to obligate the company.

1.9.2.2 Physical Qualifications of Employees. The plan shall outline the physical, medical, and emotional qualifications required for performing the duties to which they may be assigned including strength, endurance, agility, coordination and visual and hearing acuity. The plan shall indicate that while on duty, use of or under the influence of alcohol, narcotics, intoxicants, or similar mind altering substances will not be allowed. The plan shall indicate the disposition of those employees found to be under the influence of or consuming such substances.

1.9.2.3 Personal Protective Equipment. The plan shall outline procedures to be followed to assure the proper use, fit, wear, selection and maintenance of personal protective and life saving equipment (e.g., protective footwear, protective gloves, hard hats, safety glasses, hearing protection, body harnesses and lanyards). The plan shall provide that the contractor ensures that employees are physically able and medically determined qualified to use the personal protective and safety equipment required in the job duties.

1.9.2.4 Hazardous Substances, Agents and Environments. The plan shall provide that employees are protected from exposure, through inhalation, ingestion, skin absorption, or physical contact, to any chemical, biological, or physical agent in excess of acceptable limits in the most recently published American Conference of Governmental Industrial Hygienist (ACGIH), “Threshold Limit Values and Biological Exposure Indices”. The most common hazardous substances the contractor should expect to be encountered will normally be lead-based-paint and asbestos. The plan shall address training and certification of employees as well as handling and disposal methods the contractor plans to use when hazardous substances are encountered.

1.9.2.5 Accident Reporting. The plan shall include notification of the CO immediately with information regarding with whom, how, where, when, seriousness and medical treatment received of the injured personnel whenever accidents occur. The plan shall indicate that except for rescue and emergency measures, that accident scenes shall not be disturbed until released by investigating personnel.

1.9.2.6 Emergency Planning. The plan shall provide for employee safety in case of fire or other emergency. The plan shall provide for periodic training of employees of the emergency plans. The plan shall include emergency telephone numbers and reporting instructions for ambulance, physician, hospital, fire, and police and shall be easily available at each work site. The plan shall provide for employees working alone in remote locations or away from other workers to have an effective and readily available means of emergency communications by either cellular phone, two-way radio, hard-line telephone or other acceptable means.

1.9.3 Protection of Property: Protect all property, both Government and personal, indoors and outdoors, including buildings, site improvements, utilities, vegetation, and vehicles at or adjacent to the work site, and which might be damaged during the course of the required work, for the duration of the work. Do not operate heavy construction equipment on drives, sidewalks, or lawns without installing suitable protection on these surfaces.

1.9.4 Hot Permits: Hot Permits shall be required for each building/worksite when work requires an open flame. Hot Permits can be obtained from the location or from the Specification 01 01 00 General Conditions rev May 22,2019.

1.9.5 Barricades, Warning Signs, and Lights: Install and maintain all necessary barricades, warning signs, and lights to protect workmen, building occupants, the public, and adjacent property.

1.9.6 Site Specific Safety Plan (SSSP) - Project Order: The contractor shall prepare a Site-Specific Safety Plan in accordance Specification 01 01 00 General Conditions rev May 22,2019 and submit it to the CO for approval. This is required for each project order under this IDIQ and should complement the Accident Prevention Plan.

1.9.7 Permits: Contractor may be responsible for obtaining permits from the Authority Having Jurisdiction (AHJ) as required by each project order.

1.10 Working Hours: Once begun, work shall continue uninterrupted during normal working hours until it is complete. Schedule working hours to coincide with working hours of the specific location needs. Normal work hours are from 7:30 a.m. to 4:30 p.m., Monday thru Friday, Federal holidays excepted. Do not perform work on the location on other days or other hours without the written approval of the CO. The Federal holidays listed below are observed. When a holiday falls on a Sunday, the following Monday will be observed as the holiday. When the holiday falls on a Saturday, the preceding Friday will be observed as the holiday. Contractors are also requested to not schedule work on Christmas Eve and New Year's Eve.

New Year's Day
Labor Day
Martin Luther King's Birthday
Columbus Day
Presidents' Day
Veterans' Day
Memorial Day
Thanksgiving Day
Independence Day
Christmas Day

1.11 Quality Control: The contractor shall develop, submit and implement a quality control plan. The plan shall identify personnel, lines of authority, procedures to be used. The plan shall be approved by the CO prior to the start of the first project order issued under this contract.

1.12 Warranty of Construction: Warrant construction in accordance with Contract Clause FAR 52.246-0021 entitled: Warranty of Construction.

1.13 Warranty Signage: Provide and install a sign with the following information:

· Contractor Name

· Points of Contact

· Primary: Name, Phone

· Secondary: Name, Phone

· Warranty Expiration Date

Sign to be as follows (unless otherwise approved by CO on each individual TO):

SIZE TO BE 8 ½” HIGH X 11” WIDE. SIGN TO BE ¼” REYNOBOND MATERIAL WITH VINYL BACKGROUND (FEDERAL STANDARD (FED-STD) 595B COLOR, STANDARD BROWN – 10100) AND VINYL LETTERING (FED-STD 595A COLOR, WHITE - #17875). LETTERING TO BE BLOCK STYLE, WITH ARIAL FONT.

1.14 Additional Information: Publications referenced in the Performance Work Statement are available upon request to the CO.

1.14 Operations, Storage Areas, and Facilities: Contractor operations, storage areas, lay down areas, and facilities be coordinated with and approved by the CO.

1.15 Excavation: Coordinate excavations with the location and the proper One-Call Center prior to excavation. The contractor shall not be allowed to perform any type of excavation without notifying the CO first.

1.16 Utilities: The Government will furnish the Contractor domestic water and electricity at the nearest exterior outlet free of charge for use in performance of the work indicated.

PAGE

File details come from the government source that posted it. Updated .