Attachment_2_-_Sample_Call_Order_FY21_seed_increaseSOW_THRO_GRAM_7_2021.pdf

PDF 275 KB Posted

Attached to
Midwest Seed Increase BPA
Solicitation number
140P2022Q0016
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS A SAMPLE STATEMENT OF WORK TO BE USED FOR EVALUATION PURPOSES ONLY

A BPA CALL WILL NOT BE ISSUED FOR THIS SAMPLE REQUIREMENT

SOLICITATION # 140P2022Q0016

Native Seed Production Theodore Roosevelt National Park

Park Loop Road Repair PMIS: multiple LRF project funding

Statement of Work

1.0 GENERAL INFORMATION

1.1 Introduction: The contractor shall perform work related to seed increase for ecotype seed originating from Theodore Roosevelt National Park (THRO). THRO genetic sourced seed is needed for utilization in the recovery of disturbed areas as a result of facility and road developments occurring on park road. The contractor will be requested to perform the following tasks: establishment and harvesting of seed from NPS genetic stocks; cleaning, testing and storing native seed; and delivery of propagated seed.

1.2 Description of Work

At THRO a road rehabilitation and construction project will result in ground disturbance and will require extensive reseeding. All revegetation work that the park will conduct will be done using seed that originates from the park. Locally collected genetically appropriate seed performs well in revegetation work and utilizing ecologically appropriate seed supports the mission and policies of the National Park Service.

The scope of services in this contract is for the contractor to utilize park collected seed to establish seed increase fields and maximize production of the species planted. THRO park staff have or will hand collected accessions of the seed targeted for these increase fields. Those hand collected accessions will be provided to the contractor upon award of the contract. The contractor will test and clean seed if necessary, plant seed in the spring or fall of 2022 and produce seed for three growing seasons. Produced seed will be cleaned and tested by the contractor. Upon receipt of the seed tests the contractor will make the seed available to the park. Since most park seeding operations are dormant season seedings the contractor should anticipate delivering seed to the park in late summer or fall and should anticipate that schedule throughout the project.

Plant production for THRO for 2022, 2023, 2024, 2025 growing seasons:

Botanical Name Field Size acres

2022 2023 2024 2025 2026

Bouteloua curtipendula 1.5 Elymus trachycaulus 1.0 Koeleria macrantha 0.5 Schizachyrium scoparium 1.0 Reports, Storage, and delivery

1.3 Scope of Services

The contractor will manage these native seed production fields by providing fertilization, weed control, and when possible irrigation for the species at optimal time periods, also harvest the seed at maximum maturation time for maximum seed production. The contractor will ensure the prevention of cross-pollination with local varietals of the same or similar species and will provide documentation of prevention methods. Field Inspection report conducted by Colorado Seed Growers Association, or equivalent, will be supplied as yearly written documentation.

1.3.1 Task 1. Native Seed Increase

For seed production this task will include all labor and materials for seed cleaning, testing and inventorying; field preparation, planting and establishment; field maintenance, harvesting of seed and curation; and final seed cleaning and testing and shipment of seed. Seed storage shall be in a controlled environment. Conditions due to weather, insect damage, seed viability, and other acts beyond the control of the contractor may result in the contractor not meeting production goals. In this event, the contractor and NPS will meet to adjust the existing contract and negotiate reimbursement for field maintenance costs. Adjustments to the contract will be based on NPS needs and the contractor capabilities to meet these needs given the unexpected contingencies. Task 1 is for the establishment of seed production fields. The initial production/establishment year for each species may depend on certain biological and environmental factors. Actual initiation of the period of performance may affect timing of planting and production. Planting times may be adjusted by the grower in consultation and with approval from the COR. Typically, the contractor should anticipate the following in the first grow year: provide THRO staff with the information regarding the quantity of seed required to start the desired field sizes, receipt of seed from THRO hand collection crews following contract award, clean hand collections, test hand collections, plant cleaned and tested seed in the prescribed field size, field maintenance, harvesting, cleaning, and testing of harvested seed. In year two and three the contractor may request additional hand collected seed from the park if fields require seeding to fill in the established fields. Also, in year two and three the contractor will conduct weed control and field maintenance, harvest fields to maximize seed production, and clean and test harvested seed. Critical components of this task include requesting an appropriate amount of seed for each species from NPS. Seed quantities for increase field establishment should be based on industry standards and best practices for each species. Second, receiving the results of a purity and germination test before seed is utilized in the field. Third, removing non-target species from the increase field.

Production fields with non-native species that are novel to the park setting would represent a very high risk of a new species introduction into the park and will not be able to be utilized by the park. Every effort shall be made to provide a seed product that is free or nearly free of non target species.

1.3.2 Task 2. Annual Summary Report: The contractor will provide a brief annual summary report (2 page maximum with two photos) summarizing the production and seed test results of all species for this project and send a copy to the COR by March 15th. Reports likely to start in calendar year 2022 after field activities are initiated in 2021.

1.3.3 Task 3. Seed Shipment: Seed will be shipped to the park upon request and as agreed upon by the COR and contractor. Some spring seeding may be done by the parks thus requested delivery of some seed may be in March. Most seeding is dormant season seeding thus common requested delivery will be in late summer or early fall. It is understood that delivery will be of the preceding years production.

Task Table -Summary

Task 2022 2023 2024 2025 2026 1.THRO -Native Seed Increase 3 Species 3 production Yrs 1a. Field prep, planting and establishment X 1b. Field maintenance X X X X 1c. Harvest and curation (Footnote 1) X X X 1d. Seed cleaning and testing (Footnote 2) X X X X

2. Annual Report X X X X

3. Seed shipment X X X

1 – Seed is generally harvested in the fall. Cleaned and tested in the winter and the product is available to ship in the early spring. 2 -hand collected seed from the NPS should be tested by the contractor prior to planting.

2.0 PERIOD OF PERFORMANCE, DETAILS, ACRONYMS, AND DEFINITIONS

2.1 Confidentiality: The information and genetic seed stock developed and increased under this contract is the property of the U.S. government and shall be kept in strict confidence.

2.2 Performance Period: 9/01/2021 (or upon award) – 9/01/2026 or five years from the date of award of the contract.

2.3 Project Identification: The work of this contract shall consist of the services described below for the referenced projects. In this document, the project shall be referred to as Seed Increase for Theodore Roosevelt National Park.

2.4 Contacts:

The following individuals are to be contacted with any questions, concerns, and issues regarding this work. No other individuals are authorized to make decisions regarding this work during any portion of the work.

• Contracting Officer (CO): LJ Gravelle, lj_gravelle@nps.gov, 720-415-1428

• Contracting Officer’s Representative (COR): Ken Stella, ken_stella@nps.gov, 303-969-2119

• Theodore Roosevelt Representative: TBD

2.5 Abbreviations:

NPS – National Park Service THRO-Rocky Mountain National Park CO- Contracting Officer COR- Contracting Officer’s Representative

Definitions:

3.0 QUALITY STANDARDS

Quality Standard shall be in accordance with commercial practices and as described in this statement of work. All work within this Scope of Work shall adhere to IV. Quality Standards outlined below. If discrepancies exist the more stringent standards shall apply. All seed, plants and other propagules resulting from this agreement are from THRO germplasm and therefore property of these respective National Parks. As projects are completed and materials are no longer needed, all existing seed, plants or other propagules will be provided to THRO or destroyed as mutually agreed upon.

Inspections: All seed increase fields shall be inspected annually by a representative of the states’ Association of Official Seed Certifying Agencies (AOSCA). Inspections, land requirements, and isolation distances shall be based upon Foundation Certification Standards (AOSCA ©2012, Effective July 2011).

Limitations of Generations: The grower agrees to grow G0 seed stock for increase and provide THRO G1 seed stock. No further generations are allowable unless prior approved by the National Park Service COR and the park technical representative.

Volunteer plants: Every reasonable effort must be made to control volunteer plants (arising from seed or vegetative remnants). The grower shall identify all non-target species growing in the fields and provide this written information to the COR annually along with the certification inspection report from the AOSCA representative. Provided in annual progress report. Fields may be inspected by COR, without notice. Failure to control volunteer plants may be cause of rejection by CO.

Harvest: Identity and purity of seed must be maintained at all times during harvest.

Equipment and facilities used for transporting, handling, and storing of seed may be inspected by COR.

Seed Storage Seed shall not be allowed to become wet after harvest. Seed shall be stored in a building, shed or warehouse that allows air circulation and is protected from rain, moisture, temperature extremes and rodents or other conditions that would reduce the viability of the seed.

Seed Standards: The following minimum standards will apply to all seed increased.

i. Other Crop Seeds maximum 0.2%

ii. Weed Seeds maximum 0.1%

iii. Noxious weed seed 0%

iv. No “off type” brome seed

Substandard Seed: Seed that fails to meet the requirements may not be accepted by NPS.

Contractor shall provide, in writing, the reasons for substandard seed. The CO will determine if reasons are beyond the control of the grower. If the reasons are determined to be beyond the control of the grower, a mutually agreed upon strategy to complete this contract will be sought, which may result in a modification of this contract.

Seed Shipment: Seed shall be shipped in a manner that will prevent damage to the seed and arrive expeditiously at the park. The Contractor shall provide notification to the COR 1 week before the seed is shipped, providing the Contractor has been notified two weeks prior to the date of need, and shall provide the tracking number of the package by email as soon as is practical.

Seed Delivery: All seed delivered shall conform to all laws and regulations pertaining to the shipment of seed required by the Federal Seed Act and the Seed laws pertaining to the representative state, Colorado. Submit original seed test analysis and copy of the seed tags by lot number to the park Technical Contact and COR. Seed is to remain dry and unmixed upon delivery.

Acceptance and Reporting: Acceptance will be determined by meeting all application, inspection and seed quality standards required by this statement of work.

Submittals: Both AOSCA and state certifying agencies require application for certification, regular field inspections, and seed analysis and testing. The Contractor shall provide emailed copies of the following pertinent to THRO to the COR in a reasonable and timely manner.

1. All field inspection reports.

2. Original seed analysis reports by lot number.

3. Copies of all seed tags and lot number information.

• Percent and species of other crop seed

• Percent and species of weed seed

• Origin

• 0% noxious weed seed

• No “off type” brome seed

4. Annual summary report with two photos

5. Park collected seed analysis reports.

4.0 SCHEDULE

Native seed shall be produced, cleaned, tested and shipped within the time frame of this contract, noted in above, unless other delivery dates are agreed upon by both NPS and the contractor. Delayed production, cleaning, and shipment due to environmental factors, timing of planting, and naturally-caused occurrences will be agreed upon by the grower and COR.

5.0 PROGRESS PLAN

At the prework conference, the Contractor shall provide to the COR a written "work progress plan" that details its proposed work force and schedule to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

6.0 SUPPLIES OR SERVICES AND PRICES/COSTS

This requirement is for one (1) Firm Fixed Price Commercial Items Services Contract for Native Seed Increase and Delivery for Rocky Mountain National Park.

Item Description Unit Acre

2023 2024 2025 2026

Total

Bouteloua curtipendula

1.5

Elymus trachycaulus

1.0

Koeleria macrantha

0.5

Schizachyrium scoparium

1.0

Delivery and Reports

Each

Total $ $ $ $ $ $

Plant production for THRO for 2022, 2023, 2024, 2025 growing seasons:
2026
2025
2024
2023
2022
Field Size acres
Botanical Name
1.5
Bouteloua curtipendula
1.0
Elymus trachycaulus
0.5
Koeleria macrantha
1.0
Schizachyrium scoparium
Reports, Storage, and delivery
1.3.1 Task 1. Native Seed Increase
2.4 Contacts:
3.0 QUALITY STANDARDS
4.0 SCHEDULE
6.0 SUPPLIES OR SERVICES AND PRICES/COSTS

File details come from the government source that posted it. Updated .