Attachment 2 - Safety Review_Redacted.pdf

PDF 453 KB Posted

Attached to
Near Field Anechoic Test Chamber
Solicitation number
W911N224R0027
Issued by

About this file

This document appears to be an attachment titled "Safety Review" that provides safety requirements for the Near Field Anechoic Test Chamber contract opportunity.

The key details are:

  • The contractor must develop and implement an effective safety and health plan for the contract, to be submitted for approval within 30 days of contract award.
  • The contractor must contact the installation's Safety Division Chief to obtain technical assistance with hazardous materials management guidelines, including obtaining a Hazardous Materials Approval Group (HMAG).
  • Hazards within the chamber equipment must be guarded against unauthorized access, with clearly visible signs and symbols, as well as interlocks, safety mats, and redundant deactivation systems.
  • The contractor must ensure all personnel are fully trained, licensed, certified, and qualified, and that appropriate personal protective equipment and fall protection are used.
  • The contractor must report any accidents resulting in injury, death, or damage to government property to the Contracting Officer's Representative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMLD-SAF

SUBJECT: Safety Office Review Anechoic Near Field Test Chamber for Letterkenny Army Depot (LEAD) a conflict among these laws, regulations, and standards contact the COR for clarification.

c. -1) can be found at https://www.letterkenny.army.mil/Visitors-Information/

d. The Contractor shall develop, document, and implement an effective safety and health plan for this contract. The contractor safety and health plan shall be submitted to the KO/COR and Safety Office for approval within thirty (30 days) after contract award.

e. The Contractor shall contact the Chief of the EMD to obtain technical assistance from the installation's Safety Division Chief who will assist the Contractor with achieving and maintaining compliance with hazardous materials management guidelines, to include requesting and obtaining a Hazardous Materials Approval Group (HMAG), labeling, storage, secondary containment, issue, and use per LEAD- R 385-1, Safety Bulletin 23-02.

f. Hazards inside the different chamber equipment shall be guarded against unauthorized access. Clearly visible signs and symbols shall warn personnel in the area, and interlocks, safety mats and redundant deactivation systems shall guard against accidental access to the hazards. Guards shall be easily removable to facilitate inspection, maintenance, or repair (see LEAD-R 385-1)

g. The LEAD Safety Office, may at any time inspect all worksites, including storage

LEAD-R 385-1.

h. The Contractor shall ensure all employees and all associated sub-contractor employees possess all required licenses for operating any equipment used in the performance of this contract. The Contractor must ensure that any personnel performing under a contract are fully trained, licensed, certified, and qualified for the position in which they shall be serving. Certifications and licenses shall be provided upon request to the COR after award.

i. All contractor personnel shall wear the appropriate PPE and Fall Protection as required.

j. Each worksite will be assessed for hazards prior to the start of work. All training certifications and an Activity Hazard Analysis (AHA) will be on hand at the job site.

k. If contractor personnel determine a procedure is unsafe, they shall discontinue work immediately and contact their Program Manager who shall notify safety personnel and the COR.

l. The contractor shall report accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment to the COR promptly of the occurrence.

File details come from the government source that posted it. Updated .