Attachment 2-RFW_Go_No Go Eval.pdf
PDF 128 KB Posted
- Attached to
- Launched Effects (LE) Prototype Project
- Solicitation number
- RFW-DOTAC-ARMY-2026-001
About this file
This document is a Phase I Go/No-Go Evaluation Criteria checklist for the Launched Effects (LE) Prototype Project solicitation (RFW-DOTAC-ARMY-2026-001) sponsored by PM UAS and the Department of War Drone OTA Consortium. The evaluation employs a mandatory gatekeeper approach requiring all submissions to receive a "GO" on every administrative, eligibility, and formatting criterion to advance to Phase III technical and cost evaluation; failure to meet even a single criterion results in immediate rejection without technical review.
The gatekeeper criteria are organized into four sequential gates. Gate 1 (Immediate Rejection) requires submissions sent directly to DMConsortium@army.mil with the solicitation number RFW-DOTAC-ARMY-2026-001 in the email subject line, received on or before August 14, 2026. Gate 2 (Mandatory Eligibility & Security) mandates offeror registration under Pool 1 (Unrestricted), Pool 2 (Small Business), or Pool 3 (Non-Traditional Defense Contractor) of the DoW Drone OTA Consortium; active Unique Entity ID and SAM.gov registration; approved DD Form 2345 for Joint Certification Program prior to award; verification of NIST SP 800-171 cybersecurity compliance for Controlled Unclassified Information protection; explicit ITAR and EAR export control compliance confirmation; and for traditional contractors, identification of a cost-sharing approach or partnership with a Non-Traditional Defense Contractor per 10 U.S.C. § 4022. Gate 3 (Document Formatting & Page Constraints) requires white papers formatted in 12-point Arial, single-spaced, with a maximum of 5 pages excluding the cover page. Gate 4 (Required Content Elements) mandates four structural sections: Technical Concept (detailed LE system/component description with autonomy level specification), Delivery & Production (manufacturing capacity, monthly production rates, lead times, and delivery readiness verification), Demonstration History (past performance data and government test/demo reports), and Rough Order of Magnitude (cost estimate for manufacturing, testing, integration, delivery, and personnel support).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1-LE_RFW_5 AUG26.pdf | ||
| Special Notice LE RFW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase I Go/No-Go Evaluation Criteria
Solicitation: Launched Effects (LE) Prototype Project (RFW-DOTAC-ARMY-2026-001) Sponsor: PM UAS / DoW Drone OTA Consortium
Key Takeaway (BLUF)
To advance to the Phase III technical and cost evaluation, a submission must receive a "GO" on all Administrative, Eligibility, and Basic Formatting criteria. Failure to meet even a single "GO" threshold will result in immediate rejection without technical review.
1. Phase I Gatekeeper Criteria (Immediate Rejection)
These criteria are evaluated immediately upon receipt of the email. If any of these are missed, the package is rejected without being opened.
Evaluation
Factor Criteria for "GO"
Result
(GO / NO-
GO)
1.1 Submission Email Address
Sent directly to DMConsortium@army.mil. [ ]
1.2 Email Subject Line
Must explicitly contain the solicitation number: RFW- DOTAC-ARMY-2026-001. (No solicitation number =
NO REVIEW).
1.3 Submission Deadline
Received on or before August 14, 2026. [ ]
2. Mandatory Eligibility & Security (Gate 2)
The offeror must meet these administrative and legal baseline requirements at the time of Phase I submission.
Evaluation
Factor Criteria for "GO"
Result
(GO / NO-
GO)
2.1 Consortium Membership
Must be registered under Pool 1 (Unrestricted), Pool 2 (Small Business) or Pool 3 (Non-Traditional Defense Contractor) of the DoW Drone OTA Consortium.
2.2
SAM & UEI
Registration
Must have an active Unique Entity ID (UEI) and be registered in SAM.gov.
https://www.google.com/url?q=mailto%3ADMConsortium%40army.mil
2.3 JCP Certification
Must have an approved DD Form 2345 (Joint Certification Program) prior to award to legally receive and handle restricted technical data.
2.4 Cybersecurity Standards
Verification of compliance with NIST SP 800-171 for the protection of Controlled Unclassified Information
(CUI).
2.5 Export Control Compliance
Explicit confirmation of compliance with ITAR and EAR regulations.
2.6 Non-Traditional Partnering
Traditional contractors must identify a cost-sharing approach (per Sec 5.3) or partner with a Non- Traditional Defense Contractor (NDC) per 10 U.S.C.
§ 4022.
3. Document Formatting & Page Constraints (Gate 3)
The physical white paper must strictly adhere to the formatting constraints to protect the integrity of the competitive process.
Evaluation
Factor Criteria for "GO"
Result (GO /
NO-GO)
3.1 Page Limit
Maximum of 5 pages (excluding the Cover Page).
Any page beyond page 5 will not be evaluated.
3.2 Typography & Layout
Must be formatted in 12 pt Arial, single-spaced. [ ]
4. Required Content Elements (Gate 4)
The white paper must address all four required structural sections. Missing sections will result in a "NO-GO".
Required Section
Must Contain:
Result
(GO / NO-
GO)
4.1 Technical Concept
Detailed LE system/component description specifying the autonomy level (Human-in-the-Loop, Human-on-the-Loop, or Human-out-of-the-Loop).
4.2 Delivery & Production
Current manufacturing capacity, monthly production rates, lead times, and verification of immediate delivery readiness.
4.3 Demonstration History
Past performance data and reports from previous tests/demos hosted by the United States Government.
4.4 Rough Order of Magnitude
Cost estimate for manufacturing, testing, integration, delivery, and personnel support.
Final Evaluation Summary
[ ] ALL GOs --> PASSED Gatekeeper Evaluation. Proceed to Phase I Technical Panel Review.
[ ] ANY NO-GO --> REJECTED. Package is non-compliant and will not be reviewed further.
File details come from the government source that posted it. Updated .