Attachment 2 - PWS 2026.04.02.pdf
PDF 172 KB Posted
- Solicitation number
- W912J326QOR01
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement for chemical latrine servicing, gray water removal, handwash station support, and rolloff dumpster management at Pinon Canyon Maneuver Site, Colorado.
The contract covers a one-week performance period from June 2–9, 2026, at Building 300, 36086 US Highway 350, Model, Colorado 81059, for the HHD 615th Transportation Battalion. The contractor must provide all management, tools, supplies, equipment, and labor with no government-furnished property or services. Specific deliverables include: on June 2, provision and preparation of 16 chemical latrines, 8 handwash stations, and 3 ten-yard rolloff dumpsters between 10:00–11:00 AM MST; on June 5, servicing and cleaning of the 16 latrines and 8 handwash stations within the same window; on June 4, 5, and 8, removal of 275 gallons of gray water no later than 10:00 AM MST; and on June 9, pumping and drying all 16 latrines, removal of all 8 handwash stations, removal of 275 gallons of gray water, and removal of all 3 rolloff dumpsters no later than 10:00 AM MST. Latrine cleaning must include trash removal, interior washing with clean water, removal of black water, replacement with deodorizing blue water, and provision of toilet paper. Contractor personnel must be available during specified hours, adhere to Installation Commander standards of conduct, comply with installation security policies, and provide an interpreter if English is not the primary language. The Quality Assurance Surveillance Plan requires 95% compliance with tiered evaluation ratings ranging from Exceptional to Unsatisfactory based on service quality, timeliness, and staff professionalism.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912J326QOR01-001 QA Document 1.pdf | ||
| W912J326QOR01_COMBO - Latrine Service Colorado.pdf | ||
| Attachment 1 - Pricing List.xlsx | XLSX spreadsheet | |
| Attachment 3 - WD 2015-5433 Las Animas Colorado.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
CHEMICAL LATRINES, GRAY WATER REMOVAL, HANDWASH STATIONS, ROLL-
OFF DUMPSTERS
HHD 615th TRANSPORTATION BATTALION
PINON CANYON MANEUVER SITE, COLORADO
BLDG 300, 36086 US HI-WAY 350
MODEL, COLORADO 81059
02 JUNE 2026 – 09 JUNE 2026
Version April 2, 2026
Table of Contents
DESCRIPTION OF SERVICES
PERIOD OF PERFORMANCE
POINT OF CONTACT
GENERAL INFORMATION
Hours of Operation
STANDARDS OF CONDUCT
SECURITY REQUIREMENTS
SERVICE SUMMARY
1. 02 June 2026:
2. 05 June 2026:
3. 04, 05, 08, June 2026:
4. 09 June 2026:
GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
QASP Evaluation Ratings
PERFORMANCE WORK STATEMENT
FOR CHEMICAL LATRINES
DESCRIPTION OF SERVICES
The contractor shall service the latrines at Pinon Canyon Maneuver Site, CO, along with providing all management, tools, supplies, equipment, and labor. The contractor shall service and clean each latrine. Cleaning shall at a minimum consist of removing any trash; spray (wash) out interior with clean water; removal of “black water” and replaced with deodorizing disinfecting “blue” water; provide all toilet paper and replace toilet paper in each latrine as needed.
PERIOD OF PERFORMANCE
Performance period for this contract will be 02 June – 09 June 2026.
POINT OF CONTACT
Primary: To be determined after award
Alternate: To be determined after award
GENERAL INFORMATION
Hours of Operation: Contractor Personnel shall be readily available on 02 June 2026 and at the site between 10:00 and 11:00 AM MST. Concessions are made for religious holidays, at the discretion of the US, when they do not interfere with operations.
STANDARDS OF CONDUCT: Contractor Personnel must adhere to standards of conduct as established by the Installation Commander.
SECURITY REQUIREMENTS: Contractor shall adhere to current installation security policies. The contractor shall provide an interpreter if English is not the primary language of the workers. The interpreter shall always be on site.
If the contractor has no access, HHD 615th BN will sponsor to allow access on-site.
SERVICE SUMMARY
1. 02 June 2026: Provide and prepare 16 EA Latrines (Chemical), 8 EA Hand washing stations, and provide 3 EA 10-yard Roll-off dumpster between 10:00 and 11:00 AM MST
2. 05 June 2026: Service and cleaning 16 EA Latrines (Chemical) and 8 EA Hand washing
Stations between 10:00 and 11:00 AM MST
3. 04, 05, 08, June 2026: Remove 275 Gal of Grey water NTL 10:00 AM MST
4. 09 June 2026: Pump dry latrines 16 EA (CHEMICAL) Remove 8 EA hand washing stations, remove 275 GAL of grey water, remove 3 EA 10-yard Roll-off dumpsters at Pinon Canyon Maneuver Site No Later Than (NLT) 10:00 AM MST.
GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES
The US Government will not provide any equipment, food, personnel or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic lifesaving and life support measures will be provided during the emergency.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Task Performance
Standard Acceptable Quality Level
Surveillance Method/By Whom
Result
Determine that Latrine service meets the quantity, quality and are delivered on time
Latrine and service must meet or exceed the contract
The proper Service of the latrines are done on time, and the quality of the service meets the industry standard 95% of the time
On site observation during the period of performance by Government POC
Contractor staff representatives are professional in appearance and respectful to event participants
Staff meet standards described in this task
Specific time, quantity and quality are meet 95% of the time
On site visit during the period of performance
QASP Evaluation Ratings The evaluation ratings are as follows:
1. Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the tasks being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
2. Very Good – Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the tasks being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
3. Satisfactory – Performance meets contractual requirements. The contractual performance of the tasks contains some minor problems for which corrective actions taken by the contractor were satisfactory.
4. Marginal – Performance does not meet contractual requirements. The contractual performance of the tasks being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions were only marginally effective or were not fully implemented.
5. Unsatisfactory – Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the tasks contains a serious problem(s) for which the contractor’s actions were ineffective.
| DESCRIPTION OF SERVICES |
| PERIOD OF PERFORMANCE |
| POINT OF CONTACT |
| GENERAL INFORMATION |
| SERVICE SUMMARY |
| GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES |
| QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) |
| QASP Evaluation Ratings |
File details come from the government source that posted it. Updated .