USDA Fargo, ND USDA Greenhouse Renovation, Ph III Issued for Construction

Bid Schedule

Price for all Bid Items (Base Bid and all Alternates) to be valid for 60 days from the proposal due date

CLIN 0001 BASE BID: Complete renovation of Range E (See Drawing G001)

• Preconstruction submittals and documents

• Hazardous material remediation for Range E to include removal of transite panels in the existing

49-inch-wide plant benches.

• Selective demolition for Range E.

• Noise and dust control to protect the remainder of the facility.

• Replace all architectural, structural, plumbing, electrical, and mechanical items in Range E unless otherwise noted.

• Provide and install new LED greenhouse grow lights and tie into new control system.

• Replace plumbing floor drains and soil separator baskets in Range E and clean lines back to the sump pit in the headhouse mechanical room.

• Provide and install new plant benches as shown on the drawings, additional plant benches to be provided as shown in a bid alternate.

• Perform sitework required to install concrete pads for new evaporative coolers at each greenhouse cell and restore grass around units.

• Provide controls for each greenhouse cell and tie the controls to the centralized control panel and tie the new controls into the existing greenhouse building management system.

• Provide all testing and start-up of new mechanical and electrical equipment.

• Work with the government hired commissioning agent to commission all new systems.

• All other work required to make greenhouse range E operational.

• Prepare red- lined construction drawings and specifications, O&M manuals, and warranty items.

Period of Performance: 365 days total; to include 150-day limited notice to proceed period for submittals and material acquisition and 215-day physical on-site construction period.

Price / Cost: _$ _______________

CLIN 0002: ALTERNATE 1: Complete renovation of Range G (See Dwg G001)

• Hazardous material remediation for Range G to include removal of transite panels in the existing 49-inch-wide plant benches.

• Selective demolition in Range G.

• Noise and dust control to protect the remainder of the facility.

• Replace all architectural, structural, plumbing, electrical, and mechanical items in Range G unless otherwise noted.

• Replace plumbing floor drains and soil separator baskets in Range G and clean lines back to the sump pit in the headhouse mechanical room.

• Provide and install new plant benches as shown on the drawings, additional plant benches to be provided as shown in a bid alternate.

USDA Fargo, ND USDA Greenhouse Renovation, Ph III Issued for Construction

• Perform sitework required to install concrete pads for new evaporative coolers at each greenhouse cell and restore grass around units.

• Provide controls for each greenhouse cell and tie the controls to the centralized control panel and tie the new controls into the existing greenhouse building management system.

• Provide all testing and start-up of new mechanical and electrical equipment.

• Work with the government hired commissioning agent to commission all new systems.

• All other work required to make greenhouse range G operational.

• Prepare red- lined construction drawings and specifications, O&M manuals, and warranty items.

• Demo and install new Door G101-1.

Period of Performance: 30 additional on-site construction days for of total period of performance of 395 days if this alternate is awarded – if awarded Ranges E and G will be both turned over at the same time.

Price / Cost: _$_________________

CLIN 0003 ALTERNATE 2: New plant benches for Range E (See Dwg G001)

• Work to be accomplished concurrently with the work being done in Range E.

• Provide and install new movable greenhouse plant benches (Item FIX-1 on sheet Q101).

o 8 type FIX-1 benches (208 total feet)

• Benches will not be anchored to the floor.

• Prepare red- lined construction drawings and specifications, O&M manuals, and warranty items.

Period of Performance: 0 additional days -- work to be done concurrently with base bid work

Price / Cost: _$_____________

CLIN 0004 ALTERNATE 3: Replace 6 sets of double doors (See Drawings G001, AD121, and A121)

• Work to be accomplished concurrently with the work being done in Range E.

• Demo 6 sets of double doors between the greenhouse ranges and the headhouse.

• Provide and install 6 sets of double doors between the greenhouse ranges and the headhouse.

• Prepare red- lined construction drawings and specifications, and warranty items.

Period of Performance: 0 additional days -- work to be done concurrently with base bid work

Price / Cost: _$_____________