Attachment 2 E1A Price schedule.pdf

PDF 156 KB Posted

Attached to
ARCF LAR E1A Mitigation Federal contract opportunity
Solicitation number
W9123822Q0032
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

This pricing schedule outlines costs for establishing and maintaining a mitigation site over five years. The federal contract opportunity is for an ARCF LAR E1A Mitigation project issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The contractor will be responsible for tasks such as site preparation, irrigation installation, plant installation, weed control, browse control, monitoring, reporting and site clean-up. Pricing is provided for the base contract and establishment years one through five, with costs broken out by line item numbers for each task. Questions regarding this solicitation are due by September 9th and no additional questions will be accepted after that date.

View the file

Other files for this federal contract opportunity

Other files attached to ARCF LAR E1A Mitigation, newest first.
File Type Posted
Exhibit A Drawings.pdf PDF
Questions and Answers.Posted.pdf PDF
Attachment 1.Deliverable Schedule.pdf PDF
Attachment 3 E1A Target schedule.pdf PDF
Solicitation W9123822Q0032.pdf PDF
Attachment 4 Drawings .pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2, Pricing Schedule ARCF 2016 LAR Contract E1A

CLIN # QTY UOM PRICE EXTENDED

0001.1 Project Schedule 1 JOB

0001.2 Quality Control Plan 1 JOB

0001.3 Accident Prevention Plan 1 JOB

0001.4 Environmental Protection Plan 1 JOB

0001.5 Performance Work Plan 1 JOB

0001.6 Irrigation System Plan 1 JOB

0001.7 Stormwater Permit 1 JOB

0001.8 Installing Best Management Practices (BMPs) 1 JOB

0001.9 Stormwater Monitoring and BMP upkeep 1 JOB

0001.10 Facility Set Up and Upkeep 1 JOB

0001.11 Traffic Control 1 JOB

0001.12 Monitoring for Cultural and Biological Resources 1 JOB

0001.13 Clearing Site Layout 1 JOB

0001.14 Mitigation site layout 1 JOB

0001.15 Mitigation Site Preparation 1 JOB

0001.16 Irrigation system installation 1 JOB

0001.17 Elderberry Shrub Transplanting 1 JOB

0001.18 Sign installation 1 JOB

0001.19 Transplant Maintenance during installation 1 JOB

0001.20 Vegetation Clearing 1 JOB

0001.21 Container Plant installation 1 JOB

0001.22 Bank area seeding 1 JOB

0001.23 Monthly Records and Reports 1 JOB

0001.24 As-Builts 1 JOB

0001.25 Post Clearing/Installation Cleanup 1 JOB

Base Bid Total

1001.1 Irrigation 1 JOB

1001.2 Weed Control 1 JOB

1001.3 Browse Control 1 JOB

1001.4 Monthly Records and Reports 1 JOB

1001.5 As Built Update 1 JOB

1001.6 Plant Survival Survey 1 JOB

1001.7 Replanting 1 JOB

1001.8 Yearly Report 1 JOB

1001.9 Stormwater Monitoring and BMP Upkeep 1 JOB

1001.10 Mitigation Site Infrastructure Maintenance 1 JOB

Establishment Year One Total

2001.1 Irrigation 1 JOB

2001.2 Weed Control 1 JOB

CLIN 0001 Base Contract

CLIN 1001 Establishment Year One

CLIN 2001 Establishment Year Two

6/2/2022 1 of 3

Attachment 4, Pricing Schedule ARCF 2016 LAR Contract E1A

2001.3 Browse Control 1 JOB

2001.4 Monthly Records and Reports 1 JOB

2001.5 As Built Update 1 JOB

2001.6 Plant Survival Survey 1 JOB

2001.7 Replanting 1 JOB

2001.8 Yearly Report 1 JOB

2001.9 Stormwater Monitoring and BMP Upkeep 1 JOB

2001.10 Mitigation Site Infrastructure Maintenance 1 JOB

2001.11 Seeding 1 JOB

Establishment Year Two Total

3001.1 Irrigation 1 JOB

3001.2 Weed Control 1 JOB

3001.3 Browse Control 1 JOB

3001.4 Monthly Records and Reports 1 JOB

3001.5 As Built Update 1 JOB

3001.6 Plant Survival Survey 1 JOB

3001.7 Replanting 1 JOB

3001.8 Yearly Report 1 JOB

3001.9 Stormwater Monitoring and BMP Upkeep 1 JOB

3001.10 Mitigation Site Infrastructure Maintenance 1 JOB

3001.11 Seeding 1 JOB

Establishment Year Three Total

4001.1 Irrigation 1 JOB

4001.2 Weed Control 1 JOB

4001.3 Browse Control 1 JOB

4001.4 Monthly Records and Reports 1 JOB

4001.5 As Built Update 1 JOB

4001.6 Plant Survival Survey 1 JOB

4001.7 Yearly Report 1 JOB

4001.8 Stormwater Closeout 1 JOB

4001.9 Mitigation Site Infrastructure Maintenance 1 JOB

Establishment Year Four Total

5001.1 Irrigation 1 JOB

5001.2 Weed Control 1 JOB

5001.3 Browse Control 1 JOB

5001.4 Monthly Records and Reports 1 JOB

5001.5 As Built Update 1 JOB

5001.6 Plant Survival Survey 1 JOB

5001.7 Yearly Report 1 JOB

5001.8 Mitigation Site Infrastructure Maintenance 1 JOB

CLIN 5001 Establishment Year Five

CLIN 4001 Establishment Year Four

CLIN 3001 Establishment Year Three

6/2/2022 2 of 3

Attachment 4, Pricing Schedule ARCF 2016 LAR Contract E1A

5001.9 Final Browse Guard Removal 1 JOB

5001.10 Irrigation System Removal 1 JOB

5001.11 Final Mitigation Site Clean-up 1 JOB

Establishment Year Five Total

5001.10 Tree Thinning 1 JOB

6/2/2022 3 of 3

Price Schedule

File details come from the government source that posted it. Updated .