SHEET SUB SHEET TITLE OF SHEET
1 G0 COVER SHEET
2 G1 GENERAL NOTES
3 G2 VICINITY MAP
4 G3 DESIGN CRITERIA – SEPTIC MOUND
5 G4 DESIGN CRITERIA – PUMP CURVE
6 C1 SITE DEMOLITION PLAN
7 C2 PLAN VIEW – SEPTIC MOUND
8 C3 CROSS-SECTION – SEPTIC MOUND
9 C4 PLAN VIEW – SEPTIC & PUMP TANKS
10 C5 CROSS-SECTION – SEPTIC & PUMP TANKS
11 C6 DETAILS
UNITED STATES
DEPARTMENT OF THE INTERIOR
TITLE OF PROJECT
REPLACE QUINAULT VC COMFORT STATION
SEPTIC & DRAINFIELD
DRAWING NO.
_149_
178,244
NATIONAL PARK SERVICE
OLYMPIC NATIONAL PARK
LOCATION WITHIN PARK
QUINAULT
PMIS/PKG NO.
319700
REGION COUNTY STATE
PACIFIC WEST GRAYS HARBOR WASHINGTON
SHEET
_1_ OF _11_
GENERAL NOTES
1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH NPS STANDARDS AND
THE REQUIREMENTS OF CHAPTER 246-272A WASHINGTON ADMINISTRATIVE
CODE (IN ADDITION TO OTHER STATE AND LOCAL STANDARDS).
2. CONTRACTOR SHALL CONTACT DIG ALERT AND FIELD VERIFY ALL UTILITIES
PRIOR TO EXCAVATION. DIAL 811 BEFORE YOU DIG.
3. DIMENSIONS SHOWN ON PLANS ARE TO BE USED BY CONTRACTOR TO
DETERMINE APPROXIMATE FIELD CONDITIONS. PRIOR TO CONSTRUCTION,
CONTRACTOR SHALL FIELD VERIFY EXISTING LOCATIONS, ELEVATIONS,
MATERIAL TYPES, DIAMETER OF PIPES, ETC. OF ALL UTILITIES AND FEATURES
WHERE PROPOSED IMPROVEMENTS CONNECT. NOTIFY CONTRACTING
OFFICER OF ANY DISCREPANCIES IN WRITING.
4. EXISTING FACILITIES, INCLUDING BUT NOT LIMITED TO ROADS, SIDEWALKS,
STRUCTURES AND UTILITIES, DAMAGED BY CONTRACTOR’S OPERATIONS
SHALL BE RESTORED TO MATCH ORIGINAL PRE-CONSTRUCTION CONDITION
AND TO THE SATISFACTION OF THE CONTRACTING OFFICER WITHOUT
ADDITIONAL COST TO THE GOVERNMENT.
5. ALL DISTURBED ASPHALT, GRASS, DRAINAGE PATTERNS, ROADSIDE DITCHES,
TRAILS AND GRADE SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR AS
CALLED FOR IN THE CONTRACT DOCUMENTS, WHICHEVER IS MORE
STRINGENT.
6. CONTRACTOR SHALL FURNISH AND INSTALL EVERYTHING REQUIRED TO
PROVIDE COMPLETE AND OPERABLE FACILITIES AS SHOWN HEREIN. IF THERE
IS AN OMISSION ON THE CONSTRUCTION DOCUMENTS, SUCH OMISSION
SHALL NOT BE CONSTRUED TO MEAN THAT THE CONTRACTOR IS NOT
REQUIRED TO FURNISH OR PROVIDE EVERYTHING THAT IS NECESSARY TO
PROVIDE COMPLETE AND OPERABLE FACILITIES.
7. ALL CONTRACTORS WORKING WITH THE PROJECT BOUNDARIES ARE
RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EMPLOYEES AND/OR
SUBCONTRACTORS WITH PERSONAL PROTECTIVE EQUIPMENT AND
FOLLOWING ALL SAFETY PROTOCOLS.
8. CONTRACTOR SHALL PROVIDE TRACER WIRE AND LOCATOR TAPE FOR ALL
BURIED PIPE AND CONDUITS.
9. ALL COSTS INCURRED IN CORRECTION OF DEFICIENT WORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
10. CONSTRUCTION FENCING OR BARRIERS SHALL BE PROVIDED WHERE
NECESSARY, INCLUDING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT
ACTIVELY IN PROGRESS, TO PREVENT THE PUBLIC FROM ENTERING WORK
AREAS.
11. UNLESS OTHERWISE INDICATED, DEMOLISHED MATERIALS BECOME THE
PROPERTY OF THE CONTRACTOR. COMPLY WITH EPA REGULATIONS AND
DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
12. MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, AND
ANIMALS, AND OTHER NATURAL RESOURCES DURING CONSTRUCTION.
CONFINE CONSTRUCTION OPERATIONS TO MINIMUM PRACTICAL AREA. IN NO
CASE SHALL CONSTRUCTION OPERATIONS EXTEND BEYOND LIMITS OF
CONSTRUCTION INDICATED WITHOUT PRIOR APPROVAL BY THE
CONTRACTING OFFICER.
13. CONDUCT ALL OPERATIONS IN ACCORDANCE WITH APPROVED, CONTRACTOR-
PREPARED UNDER-AN-ACRE POLLUTION PREVENTION PLAN (UPPP).
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
GENERAL NOTES
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK G1
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
_2_ OF _11_
New Septic Mound
New Septic & Pump Tanks
Quinault Fire / Rescue Cache
Quinault VC Comfort Station
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
VICINITY MAP
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK G2
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_3_ OF _11_
Quinault Ranger Station / Visitor Center
Contractor Staging Area
Limits of Construction
Mound Design Criteria
• Soil Type: 5 (silt loam)
• Hydraulic Loading Rate: 0.4 gal/sq ft/day
• Design Flow: 625 gpd
• Gravel Infiltration Bed: 7.5’ x 83’
• Mound Height:
• 12” ASTM C-33 sand (filter media)
• 10” gravel infiltration bed w/ 1.5” Ø pressure pipe
• 12 – 18” unsettled cap and topsoil depth
• 3:1 side slope
• Filter Media Footprint (Basal Area): 24.5’ x 103’
• Setback from Building Foundation: 10’
• Setback from Well & Kestner Creek: >100’
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
DESIGN CRITERIA – SEPTIC MOUND
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK G3
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_4_ OF _11_
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Av er ag e
Da ily
D em an d
(G
PD
Quinault Water Production
2019 2020 2021 Ave
625 gpd
Assume 85% of Quinault water production goes to
Visitor Center comfort station
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
DESIGN CRITERIA – PUMP CURVE
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK G4
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
_5_ OF _11_
5’-0” concrete sidewalk – protect in place
20’-8”
31’-4”
Approximate location of 4” gravity sewer line – contractor to locate, field verify, and protect in place for re-use
GE PowerMark Gold 125 amp breaker panel – field verify capacity and add circuit breakers as needed to support new pump control panel
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
SITE DEMOLITION PLAN
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK C1
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_6_ OF _11_
1250 gal concrete septic tank – pump clean and remove
Two-lateral drainfield with infiltrator chambers – remove for installation of new pump tank
103’
~ 4’
83’
7.5’ 24.5’
10’ setback from foundation
Spruce Tree – protect in place
2” PVC
transport line, 40’ in length
Maple Tree – protect in place
Quinault Fire / Rescue Cache:
20.5’ x 30’
CXT Comfort Station
Flow control valves and check valves inside 24” Ø control box riser w/ lid 1.5” Ø PVC laterals – 3 ea
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
PLAN VIEW – SEPTIC MOUND
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK C2
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_7_ OF _11_
6” Ø monitoring / cleanout ports – 3 ea
1/8” orifices @ 2’-0” spacing along laterals in 6 o’clock position
6” Ø inspection / monitoring ports – 2 ea set 3’ from edge of gravel infiltration bed
10’ 10’
SUB SHEET NO. TITLE OF SHEET
CROSS-SECTION – SEPTIC MOUND
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK C3
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_8_ OF _11_
24’-6”
7’-6”
3’
3’ -4
SEASONAL HIGH
WATER TABLE
Soil Test Pit photo taken 10/27/21 showing consistent silt loam down to seasonal high water table ~32” below ground surface
5’-0” concrete sidewalk
20’-8”
31’-4”
2000 gal septic tank (new)
2000 gal pump tank (new)
4” gravity sewer line (existing)
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
PLAN VIEW – SEPTIC & PUMP TANKS
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK C4
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_9_ OF _11_
Make inlet connection, as needed
Electrical trench for pump control conduit, ~28’ (new)
Install new pump control panel with quick disconnect
SUB SHEET NO. TITLE OF SHEET
CROSS-SECTION – SEPTIC & PUMP TANKS
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK C5
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_10_ OF _11_
ClickTight connector
SUB SHEET NO. TITLE OF SHEET
DETAILS
DRAWING NO.
_149_
178,244
TECH REVIEW:
L. TURECEK C6
QUINAULT VC COMFORT STATION SEPTIC
MOUND
PMIS/PKG NO.
319700
DATE:
2/2022
QUINAULT, WA
OLYMPIC NATIONAL PARK
SHEET
_11_ OF _11_
1 ½”
Normally closed signal-rated float – redundant off & low level alarm
Normally open motor-rated float – pump timer on/off
FLOAT SWITCH ASSEMBLY DETAIL
(N.T.S.)
Normally open motor-rated float – override timer on/off & high level alarm
| Slide Number 1 |
| GENERAL NOTES |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
File details come from the government source that posted it. Updated .