Attachment 2 - Bid Chart.xls
XLS spreadsheet 854 KB Posted
- Attached to
- Pococi Swimming Pool Construction Federal contract opportunity
- Solicitation number
- 19AQMM22R0213
About this file
This document contains an attachment to a solicitation for the construction of a swimming pool in Pococi, Costa Rica. The solicitation is being issued by the Department of State Office of Acquisition Management under number 19AQMM22R0213. The attachment includes a bid chart detailing the labor, materials, and total costs for various infrastructure, special systems, and construction elements. It also provides preliminary cost estimates totaling approximately $670,000 for tasks such as earth moving, foundations, structural work, finishes, mechanical and electrical systems. Indirect costs and profit are additionally outlined.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM22R0213 QA.pdf | ||
| 19AQMM22R0213 0001 Package.zip | ZIP file | |
| 19AQMM22R0213.pdf | ||
| Attachment 6 - Past Performance Questionnaire (PPQ).docx | DOCX document | |
| 19AQMM22R0213 B-M.pdf | ||
| Attachment 1 - Pococi Training Pool SOW.pdf | ||
| Attachment 5 - Firm and Project Information.pdf | ||
| Attachment 4 - Drawings.zip | ZIP file | |
| Attachment 3 - Pococi Training Pool Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| TRANING SWIMMING POOL | ||||||||
| POCOCI NATIONAL POLICE ACADEMY | ||||||||
| POCOCI, COSTA RICA | ||||||||
| Bid Chart | ||||||||
| ITEM | DESCRIPTION | UNIT | QTY. | LABOR COST | MATERIALS COST | TOTAL | ||
| UNIT COST | TOTAL COST | UNIT COST | TOTAL COST | |||||
| 1 | INFRASTRUCTURE | - 0 | ||||||
| 1.1 | Building Structure | glb | 0.00 | |||||
| 1.2 | Bulding Finishes | glb | 1.00 | |||||
| 2 | SPECIAL SYSTEMS | - 0 | ||||||
| 2.1 | Mechanical Building | glb | 1.00 | |||||
| 2.2 | Electrical Building | glb | 1.00 | |||||
| 2.3 | Electrical Pool | glb | 1.00 | |||||
| 2.4 | Mechanical Pool | glb | 1.00 | |||||
| 2.5 | ||||||||
| 2.6 | ||||||||
| SUBTOTAL (DIRECT COST) | - 0 | - 0 | - 0 | |||||
| DBA COST | 15,000.00 | |||||||
| OVERHEAD | ||||||||
| TOTAL PROJECT COST | - 0 | - 0 | 15,000.00 |
Sheet2
| 270,172.66 | Pool Arch | 271,323.24 | |||||
| 1 | Structure Floor and Slab | 16,249.10 | 0.04 | 4,651.74 | 20,900.84 | 20,900.84 | |
| 2 | Finishes | 80,005.16 | 0.18 | 22,903.60 | 102,908.76 | 102,908.76 | |
| 3 | Mechanical | 90,140.73 | 0.20 | 25,805.17 | 115,945.90 | 162,324.26 | |
| 4 | 36,056.29 | 0.08 | 10,322.07 | 46,378.36 | |||
| 5 | Electrical | 34,452.29 | 0.08 | 9,862.88 | 44,315.17 | 61,382.89 | |
| 6 | 13,269.09 | 0.03 | 3,798.63 | 17,067.72 | |||
| 7 | Electrical Pool | 48,233.81 | 0.11 | 13,808.21 | 62,042.02 | 62,042.02 | |
| 8 | Mechanical Pool | 126,197.03 | 0.28 | 36,127.25 | 162,324.28 | 162,324.28 | 571,883.04 |
| 127,279.54 | |||||||
| UNEXPECTED | 22,503.09 | 22,503.09 | |||||
| INDIRECTOS | 65,403.86 | 127,279.54 | |||||
| ADMIN | 61,875.68 | ||||||
| PROFIT | 51,563.87 | 51,563.87 | |||||
| 917,273.24 | 201,346.50 | 645,950.00 |
Sheet1
| cd | % | ci | CD+CI | adm 12% | |||||
| TRAZO | Preliminary Works | 41947.01 | 0.0967696742 | 6314.6063821134 | 48261.6163821134 | 54053.010347967 | |||
| MOV TIERRAS | Earth Moving | 4668.09 | 0.0107690524 | 702.7235291927 | 5370.8135291927 | 6015.3111526958 | |||
| FUNDACION | Fundation | 71840.9 | 0.1657333975 | 10814.7638088333 | 82655.6638088333 | 92574.3434658934 | |||
| COLUMNAS | Columns | 7893.95 | 0.0182109516 | 1188.3370721795 | 9082.2870721795 | 10172.161520841 | |||
| VIGA4 | Beams | 5912.9 | 0.0136407674 | 890.1143627829 | 6803.0143627829 | 7619.3760863169 | |||
| MAMPOSTERIA | Masonry | 5938.11 | 0.0136989256 | 893.9094181848 | 6832.0194181848 | 7651.861748367 | |||
| MURO RET | Retention Wall | 26299.19 | 0.0606709286 | 3959.0195586864 | 30258.2095586864 | 33889.1947057287 | |||
| TECHO | Roof | 11449.19 | 0.0264127142 | 1723.5347225947 | 13172.7247225947 | 14753.4516893061 | |||
| PAREDES LIV | Dry Wall | 1150.81 | 0.0026548617 | 173.2402898466 | 1324.0502898466 | 1482.9363246282 | |||
| PUERTAS | Doors | 6470.41 | 0.0149269153 | 974.0406355755 | 7444.4506355755 | 8337.7847118445 | |||
| ACABADOS | Architectural Finishes | 76936.24 | 0.1774880945 | 11581.8045700947 | 88518.0445700947 | 99140.2099185061 | |||
| ESTRUCTURAL | Structural Works | 7871.15 | 0.0181583531 | 1184.9048126332 | 9056.0548126332 | 10142.7813901492 | |||
| ELECTRICA | Electric Systems | 45625.33 | 0.1052553762 | 6868.3322125708 | 52493.6622125708 | 58792.9016780793 | |||
| MECANICA | Mechanical Systems | 119469.4 | 0.2756099877 | 17984.6486247115 | 137454.048624711 | 153948.534459677 | |||
| 433472.68 | 1 | 65253.98 | 498726.66 | 558573.8592 | 670288.63104 | 2144.524638 | 672433.155678 | ||
| INDIRECTOS | 65253.98 | 130507.96 | |||||||
| 21673.64 | |||||||||
| 59847.21 | |||||||||
| 99745.35 | |||||||||
| 679992.86 |
File details come from the government source that posted it. Updated .