Attachment 2 - Bid Chart.xls

XLS spreadsheet 854 KB Posted

Attached to
Pococi Swimming Pool Construction Federal contract opportunity
Solicitation number
19AQMM22R0213
Issued by
Department of State Office of Acquisition Management

About this file

This document contains an attachment to a solicitation for the construction of a swimming pool in Pococi, Costa Rica. The solicitation is being issued by the Department of State Office of Acquisition Management under number 19AQMM22R0213. The attachment includes a bid chart detailing the labor, materials, and total costs for various infrastructure, special systems, and construction elements. It also provides preliminary cost estimates totaling approximately $670,000 for tasks such as earth moving, foundations, structural work, finishes, mechanical and electrical systems. Indirect costs and profit are additionally outlined.

View the file

Other files for this federal contract opportunity

Other files attached to Pococi Swimming Pool Construction, newest first.
File Type Posted
19AQMM22R0213 QA.pdf PDF
19AQMM22R0213 0001 Package.zip ZIP file
19AQMM22R0213.pdf PDF
Attachment 6 - Past Performance Questionnaire (PPQ).docx DOCX document
19AQMM22R0213 B-M.pdf PDF
Attachment 1 - Pococi Training Pool SOW.pdf PDF
Attachment 5 - Firm and Project Information.pdf PDF
Attachment 4 - Drawings.zip ZIP file
Attachment 3 - Pococi Training Pool Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

TRANING SWIMMING POOL
POCOCI NATIONAL POLICE ACADEMY
POCOCI, COSTA RICA
Bid Chart
ITEMDESCRIPTIONUNITQTY.LABOR COSTMATERIALS COSTTOTAL
UNIT COSTTOTAL COSTUNIT COSTTOTAL COST
1INFRASTRUCTURE- 0
1.1Building Structureglb0.00
1.2Bulding Finishesglb1.00
2SPECIAL SYSTEMS- 0
2.1Mechanical Buildingglb1.00
2.2Electrical Buildingglb1.00
2.3Electrical Poolglb1.00
2.4Mechanical Poolglb1.00
2.5
2.6
SUBTOTAL (DIRECT COST)- 0- 0- 0
DBA COST15,000.00
OVERHEAD
TOTAL PROJECT COST- 0- 015,000.00

Sheet2

270,172.66Pool Arch271,323.24
1Structure Floor and Slab16,249.100.044,651.7420,900.8420,900.84
2Finishes80,005.160.1822,903.60102,908.76102,908.76
3Mechanical90,140.730.2025,805.17115,945.90162,324.26
436,056.290.0810,322.0746,378.36
5Electrical34,452.290.089,862.8844,315.1761,382.89
613,269.090.033,798.6317,067.72
7Electrical Pool48,233.810.1113,808.2162,042.0262,042.02
8Mechanical Pool126,197.030.2836,127.25162,324.28162,324.28571,883.04
127,279.54
UNEXPECTED22,503.0922,503.09
INDIRECTOS65,403.86127,279.54
ADMIN61,875.68
PROFIT51,563.8751,563.87
917,273.24201,346.50645,950.00

Sheet1

cd%ciCD+CIadm 12%
TRAZOPreliminary Works41947.010.09676967426314.606382113448261.616382113454053.010347967
MOV TIERRASEarth Moving4668.090.0107690524702.72352919275370.81352919276015.3111526958
FUNDACIONFundation71840.90.165733397510814.763808833382655.663808833392574.3434658934
COLUMNASColumns7893.950.01821095161188.33707217959082.287072179510172.161520841
VIGA4Beams5912.90.0136407674890.11436278296803.01436278297619.3760863169
MAMPOSTERIAMasonry5938.110.0136989256893.90941818486832.01941818487651.861748367
MURO RETRetention Wall26299.190.06067092863959.019558686430258.209558686433889.1947057287
TECHORoof11449.190.02641271421723.534722594713172.724722594714753.4516893061
PAREDES LIVDry Wall1150.810.0026548617173.24028984661324.05028984661482.9363246282
PUERTASDoors6470.410.0149269153974.04063557557444.45063557558337.7847118445
ACABADOSArchitectural Finishes76936.240.177488094511581.804570094788518.044570094799140.2099185061
ESTRUCTURALStructural Works7871.150.01815835311184.90481263329056.054812633210142.7813901492
ELECTRICAElectric Systems45625.330.10525537626868.332212570852493.662212570858792.9016780793
MECANICAMechanical Systems119469.40.275609987717984.6486247115137454.048624711153948.534459677
433472.68165253.98498726.66558573.8592670288.631042144.524638672433.155678
INDIRECTOS65253.98130507.96
21673.64
59847.21
99745.35
679992.86

File details come from the government source that posted it. Updated .