Attachment 1SOSS BLANK.xls
XLS spreadsheet 46 KB Posted
- Attached to
- Dry-Dock (DD): USCGC DAUNTLESS FY23 DDS
- Solicitation number
- 70Z080-22-Q-MECP00024
About this file
This document contains a solicitation for dry-dock repairs to a United States Coast Guard cutter. The solicitation requests quotes for repairs to the USCGC Dauntless from November 2nd, 2022 to January 11th, 2023 as outlined in an attached schedule of supplies and services. The schedule lists over forty separate repair and maintenance items to be performed on the cutter including hull plating replacement and preservation, shaft and propeller repairs, cathodic protection renewal, and various system inspections and overhauls. Quotes must include pricing for all definite line items as well as optional line items and are due by the solicitation response date. The solicitation is designated for small business set-aside with the Department of Homeland Security Coast Guard as the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| SCHEDULE OF SUPPLIES AND SERVICES FOR DAUNTLESS FY23 DRYDOCK REPAIRS | |||||
| USCG DAUNTLESS (WMEC-624) DD REPAIRS FY23 Period of Performance: 02 NOV 2022 through 11 JAN 2023 | |||||
| Contractor Name: | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, Side Scan, Ultrasonic Testing | JOB | 1 | $ - 0 | |
| D-002 | Hull Plating, U/W Body, Ultrasonic Testing | JOB | 1 | $ - 0 | |
| D-003 | U/W Body, Preserve, 100 percent | JOB | 1 | $ - 0 | |
| D-004 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | 1 | $ - 0 | |
| D-005 | Appendages (U/W), Preserve (Internal) and Leak Test | JOB | 1 | $ - 0 | |
| D-006 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | 1 | $ - 0 | |
| D-007 | Voids (Non-Accessible), Preserve (Internal) and Leak Test | JOB | 1 | $ - 0 | |
| D-008 | Main Mast, Preserve, 100 Percent | JOB | 1 | $ - 0 | |
| D-009 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | $ - 0 | |
| D-010 | Propulsion Propeller Shaft Coating, Inspect and Test | JOB | 1 | $ - 0 | |
| D-011 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | $ - 0 | |
| D-012 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | $ - 0 | |
| D-013 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | $ - 0 | |
| D-014 | Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall | JOB | 1 | $ - 0 | |
| D-015 | Fathometer Transducer, Renew | JOB | 1 | $ - 0 | |
| D-016 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $ - 0 | |
| D-017 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | 1 | $ - 0 | |
| D-018 | Rudder Assemblies, Inspect and Repair | JOB | 1 | $ - 0 | |
| D-019 | Superstructure, Preserve, 100 Percent | JOB | 1 | $ - 0 | |
| D-020 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | $ - 0 | |
| D-021 | Drydock | JOB | 1 | $ - 0 | |
| D-022 | Temporary Services, Provide - Cutter | JOB | 1 | $ - 0 | |
| D-023 | Armory Bilge Hull Plating, Renew | JOB | 1 | $ - 0 | |
| D-024 | MSD Bilge Hull Plating and Stringers, Renew | JOB | 1 | $ - 0 | |
| D-025 | JP-5 Fuel Storage Tank Top, Renew | JOB | 1 | $ - 0 | |
| D-026 | Galley Deck Plating and Piping, Renew | JOB | 1 | $ - 0 | |
| D-027 | Raw Water Piping, Clean and Flush | JOB | 1 | $ - 0 | |
| D-028 | JP-5 Hull Plating, Renew | JOB | 1 | $ - 0 | |
| D-029 | Main Passageway Deck Plating, Renew | JOB | 1 | $ - 0 | |
| D-030 | Reefer Flats Deck Plating, Renew | JOB | 1 | $ - 0 | |
| D-031 | Deep Water Sounder, Remove | JOB | 1 | $ - 0 | |
| D-032 | Doppler Speed Log, Replace | JOB | 1 | $ - 0 | |
| D-033 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| D-034 | Propulsion Intermediate Shafts; Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| O-035 | Propulsion Shaft Coating, Renew | JOB | 1 | $ - 0 | |
| O-036 | Propulsion Shafting, Straighten | JOB | 1 | $ - 0 | |
| D-037 | Propeller Shaft Sleeves, Renew | JOB | 1 | $ - 0 | |
| D-038 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | $ - 0 | |
| D-039 | Propulsion Stern Tube Bearings, Renew | JOB | 1 | $ - 0 | |
| D-040 | 32 Stores Hull Plating, Renew | JOB | 1 | $ - 0 | |
| D-041 | Paint Locker Deck Plating, Renew | JOB | 1 | $ - 0 | |
| O-042 | Stern Tube Interior Surfaces, Preserve, 100 Percent | JOB | 1 | $ - 0 | |
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | 0 | |
| D-00C | Travel and Per Diem | JOB | 1 | $ - 0 | |
| O-00Z | Laydays | Day | 5 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 |
&CSchedule of Supplies and Services Attachment 1
File details come from the government source that posted it. Updated .