Attachment 1- VENTUROUS (WMEC 210B) DD FJL 21ER0_BLANK.xls
XLS spreadsheet 41 KB Posted
- Attached to
- USCGC Venturous DD FY21
- Solicitation number
- 70Z080-21-Q-P4519300
About this file
This solicitation is for dry-dock repairs of the USCGC Venturous (WMEC-625) to be performed from 31 March 2021 through 09 June 2021 at the contractor's certified dry-dock facility. The Coast Guard seeks repairs as specified in Attachment 2 - the Statement of Work and Specification. The contractor must provide all labor, materials and equipment necessary to meet specification requirements. This is a 100% small business set-aside solicitation, with a small business size standard of 1,250 employees. Quotes are due by 23 December 2020 and award is anticipated on or about 14 January 2021. Site visits must be completed by 04 December 2020. The Coast Guard agency contacts are Gregory J. Ducker, Contract Specialist, and Marc A. Massey, Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00001 USCGC VENTUROUS FY21 DD.xls.pdf | ||
| updated RFQ CGC Venturous DD FY21.doc | DOC document | |
| Attachment 2- VENTUROUS (WMEC 210B) DD FJL 21R0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC VENTUROUS (WMEC-625; Class - 210 B) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | $0.00 | ||
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | $0.00 | ||
| D-003 | U/W Body, Preserve (100%) | JOB | $0.00 | ||
| D-004 | Hull Plating Freeboard, Preserve – Partial | JOB | $0.00 | ||
| D-005 | Appendages (U/W), Preserve (Internal) and Leak Test | JOB | $0.00 | ||
| D-006 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | $0.00 | ||
| D-007 | Voids (Non-Accessible), Preserve (Internal) and Leak Test | JOB | $0.00 | ||
| D-008 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | $0.00 | ||
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | $0.00 | ||
| D-010 | Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall | JOB | $0.00 | ||
| O-011 | Propulsion Shaft Coating, Renew | JOB | $0.00 | ||
| O-012 | Propulsion Shafting, Straighten | JOB | $0.00 | ||
| O-013 | Propeller Shaft Sleeve(s), Renew | JOB | $0.00 | ||
| O-014 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | $0.00 | ||
| D-015 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | $0.00 | ||
| D-016 | Propulsion Shaft Bearings (External), Renew | JOB | $0.00 | ||
| D-017 | Propulsion Stern Tube Bearings, Renew | JOB | $0.00 | ||
| D-018 | Stern Tube Interior Surfaces, Preserve 100% | JOB | $0.00 | ||
| D-019 | Controllable Pitch Propellers, Clean and Inspect | JOB | $0.00 | ||
| D-020 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | $0.00 | ||
| D-021 | Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall | JOB | $0.00 | ||
| D-022 | Fathometer Transducer, General Maintenance | JOB | $0.00 | ||
| D-023 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | $0.00 | ||
| D-024 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | $0.00 | ||
| D-025 | Rudder Assembly; Remove, Inspect And Reinstall | JOB | $0.00 | ||
| D-026 | Superstructure, Preserve “Partial” | JOB | $0.00 | ||
| D-027 | Cathodic Protection, Zinc Anodes, Renew, | JOB | $0.00 | ||
| D-028 | Drydock | JOB | $0.00 | ||
| D-029 | Temporary Services, Provide - Cutter | JOB | $0.00 | ||
| D-030 | Sea Trial Performance, Support, Provide | JOB | $0.00 | ||
| D-031 | Hull Structure and Plating, Renew | JOB | $0.00 | ||
| D-032 | Bearing Housing, Rudder Stocks, Inspect and Repair | JOB | $0.00 | ||
| D-033 | Plating, Chain Locker, Renew and Preserve | JOB | $0.00 | ||
| D-034 | Seawater Piping, Refrigeration Plant, Renew | JOB | $0.00 | ||
| D-035 | Refrigeration Vent Mod | JOB | $0.00 | ||
| D-036 | Deep Water Sounder, Remove | JOB | $0.00 | ||
| D-037 | Doppler Speed Log, Replace | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | $500.00 | Day | 5 | $2,500.00 |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $2,500.00 | ||||
| Total Price of Definite and Optional Items | $2,500.00 |
&C(9/8/2020) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .