Attachment 1 Statement of Work.pdf

PDF 104 KB Posted

Attached to
Concrete Slab for USDA ARS in Wenatchee, WA
Solicitation number
12905B23Q0130
Issued by

About this file

This statement of work outlines requirements for a concrete slab project at the USDA Agricultural Research Service Tree Fruit Research Laboratory in Wenatchee, Washington. The project involves removing existing materials and installing a new 33' by 80' concrete slab and six bollard protections in front of Building 5. Key requirements include providing 6 inches of compacted aggregate base below the 6-inch fiber reinforced concrete slab. Sawcutting contraction joints, barricading the slab for 14 days, and adhering to applicable construction codes and standards. The contracting office and point of contact are identified. The 90-day period of performance is specified to commence with a notice to proceed.

Related solicitation number 12905B23Q0130 from the USDA Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area provides additional context that this statement of work is for a concrete slab project at the specified Wenatchee research laboratory location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

BUILDING 5 CONCRETE SLAB

TREE FRUIT RESEARCH LABORATORY

WENATCHEE, WA

Date: April 25, 2023

STATEMENT OF WORK

1.0 CONTRACT PROJECT:

a. Project Number: TBD

b. Project Title: Building 5 Concrete Slab

c. Project Location: Tree Fruit Research Laboratory 1104 N. Western Ave. Wenatchee, WA 98801

2.0 PROJECT CONTACT PERSONS:

a. CONTRACTING OFFICER (CO):

Michael Sherlock

USDA-ARS-PWA -APPF

Email: Michael.Sherlock@usda.gov

b. CONTRACTING SPECIALIST (CS):

Michael Sherlock

USDA-ARS-PWA -APPF

Email: Michael.Sherlock@usda.gov

c. LOCATION MONITOR (LM):

Michael Tonge 1104 Western Ave. Wenatchee, WA 98801 Phone: (509) 664-2280 Ext. 261 Email: michael.tonge@ars.usda.gov

d. ADMINISTRATIVE OFFICER (AO):

Michael Tonge 1104 N. Western Ave. Wenatchee, WA 98801 Phone: (509) 664-2280 Ext. 261 Email: michael.tonge@ars.usda.gov

3.0 PROJECT DESCRIPTION:

Provide concrete paving with bollards in front of building 5.

4.0 PROJECT REQUIREMENTS:

a. Do not disturb hazardous materials and report condition immediately to the Contracting Officer’s Representative (COR) regarding potentially hazardous conditions that are uncovered. Stop work in the area of the questionable material or condition until identification and direction is provided.

b. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction shall comply with applicable federal, state, and local code requirements as well as current industry standards, (i.e., IBC, NEC, NSPC, NFPA, EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.

c. Access the site between 8:00 am and 4:00 pm Monday through Friday excluding federal holidays. Contractor staff must sign-in on the first day of arrival and then sign-out on the final day of the project, upon completion.

4.1 Background & Site Description:

The space immediately in front (east side) of Building 5 requires paving. This area is principally used for loading and unloading equipment, plant material, and fruit from trucks using a forklift. The area is currently gravel with some crumbled asphalt.

4.1 Bid Schedule:

Provide all labor, equipment and materials to perform this Statement of Work and Schedule of Items.

4.2 Description of Work:

a. Provide concrete slab in front of building 5, 33’ (east to west) by 80’ (north to south).

a. Remove 6” of existing material and dispose off site. Extend removal by 12” on all sides of slab. Slope subbase away from building.

b. Proof roll subgrade prior to installing base and remove unsuitable or soft soils.

c. Provide compacted 6” free draining crushed aggregate base under slab to limits of material removed.

d. Provide complete separation of slab and building foundations with preformed joint filler.

e. Provide 6” depth fiber reinforced concrete slab with 28-day minimum compressive strength of 4,000 psi. Provide broom finish.

f. Sawcut contraction joints at a maximum spacing of 16’ to a 1.5” depth. Cut joint as soon as the joint can be cut, without creating spalling at joint.

g. Provide barricades to keep traffic off slab for minimum of 14 days.

b. Provide 6 bollards to protect building at locations identified on site.

a. Bollards to be 4” concrete filled steel bollard. Embed minimum 3’ in ground in 1’ diameter concrete filled hole. Slope concrete to drain at ground level.

4.3 Government Furnished Equipment\Services

a. Government will furnish a reasonable amount of electricity and water.

5.0 GENERAL REQUIREMENTS:

5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Government. All disturbances of existing systems shall be thoroughly coordinated with the Government to prevent disturbances that might jeopardize on-going operations and research. Government reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Government prior to starting demolition operations.

Contractor shall legally dispose all any materials removed that will not be retained.

5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.

5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the Location Monitor for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.

5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor. The Contractor shall retain and pay for the services of an independent inspector or testing laboratory to perform all tests expressly required by this contract.

5.6 Protection of Work and Property/Safety Requirements:

a. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the Location Monitor.

b. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.

c. Contractor is responsible for verifying location of any underground utilities and is responsible for any damaged caused to such utilities.

5.7 Temporary Facilities:

a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

b. Should the Contractor require any power or utility shutdowns during construction, the

Contractor shall obtain approval for such shutdown from the Location Monitor fourteen

(14) calendar days prior to the need.

5.8 Materials and Equipment:

a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.

b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/Location Monitor.

c. Government will not furnish any labor or equipment to unload or move materials or supplies.

5.9 Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the Location Monitor.

5.10 Warranty:

a. Submit data concerning the standard one year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.

5.11 Final Payment/Contract Closeout: The following documents are REQUIRED PRIOR TO

FINAL PAYMENT (other documents may also be required):

a. General contractor’s minimum one (1) year warranty on work.

b. Release of liens

c. Final Invoice

6.0 Project Schedule:

The Contract time for this project is 90 calendar days from Notice to Proceed.