Attachment 1 - Statement of Work.pdf

PDF 240 KB Posted

Attached to
Service Contract for Gas Chromatograph/Mass Spectrometer (GC/MS)
Solicitation number
1232SA25Q0291
Issued by

About this file

This Statement of Work (SOW) details a yearly maintenance and support service plan for a Gas Chromatograph/Mass Spectrometer (GC/MS) for the USDA Agricultural Research Service. The primary objective is to provide a Unity Lab Services Essential Service Plan for a fully automated Mass Spectrometer compatible with a Thermo Scientific Trace 1310 Gas Chromatograph, with the instrument to be used for identifying and quantifying insect pheromones, plant volatile organic compounds, and herbivore-induced volatiles.

The contract includes a base year from September 1, 2025 to August 31, 2026, with four additional one-year option periods through August 31, 2030. Key service requirements include one annual preventive maintenance visit, labor and parts for corrective maintenance, timely technical support, software and firmware updates, system diagnostics, and the use of original equipment manufacturer (OEM) parts. The deliverable must be submitted within 30 days of order receipt, and the service plan must meet the laboratory instrument specifications outlined in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Gas Chromatograph/Mass Spectrometer

Project Gas Chromatograph/Mass Spectrometer (GC/MS) for use in identification and quantification of insect pheromones, plant volatile organic compounds, and herbivore induced volatiles.

General Information

1.0 Scope of Work

Vendor is to provide a yearly Unity Lab Services Essential Service Plan for a fully automated Mass Spectrometer (MS) for determining mass/ fragments for organic compounds that is compatible with Thermo Scientific Trace 1310 Gas Chromatograph (Serial Number:

ISQ762208006)

Features, Components, Accessories, Modules, Software and/or Services to be included:

1) Labor, travel, and parts required for corrective maintenance visits

2) Timely response time for technical support inquiries (virtual/phone or in person within one month)

3) One (1) scheduled annual standard preventive maintenance to include the following:

a) Instrument requalification, as needed

b) Checking fans, air, water, columns, voltage and detectors for proper function

c) Replacement of filaments, filters, rings and oil changes

d) Clean, adjust and replace as needed: valves, screws, lens, fans, filters

4) System checks during annual standard preventative maintenance to include the following:

a) Software and firmware updates, as needed

b) Check of computer, operating system, disk drives, hard drives and printer

5) Functional checks during annual standard preventative maintenance to include the following:

a) Verify system and communication detection, update firmware as required

b) Verify proper insertion and removal of tools, run appropriate tunes to ensure standardization

c) Run full diagnostics and ensure all components pass standardization

Period Of Performance:

• Base Year: September 1, 2025 – August 31, 2026

• Option Year 1: September 1, 2026 – August 31, 2027

• Option Year 2: September 1, 2027 – August 31, 2028

• Option Year 3: September 1, 2028 – August 31, 2029

• Option Year 4: September 1, 2029 – August 31, 2030

2.0 Background

• To conduct research, a yearly on-site maintenance and support plan for the Gas Chromatograph/Mass Spectrometer (GC/MS) must be completed. The plan provides coverage for maintenance and repairs, with specifics found in the Technical Requirements/Tasks below.

Contractor Requirements

3.0 Technical Requirements / Tasks

• Contractor must be able to repair/maintain Gas Chromatograph/Mass Spectrometer (GC/MS)

• Uses Original Equipment Manufacturer (OEM) parts for maintenance and repairs

• 1 Preventative Maintenance (PM) per year

4.0 Government Furnished

N/A

5.0 Deliverables / Schedule

Key Deliverables Item No.

Deliverable Objective Due

1 Unity Lab Services Essential Service Plan for a fully automated Mass Spectrometer Gas Chromatograph

Laboratory instrument meets the specifications identified in this Statement of Work

Delivered no later than 30 days after receipt of order

6.0 Section 508 – Electronic and Information Technology Standards Section 508 guidelines will be adhered to if applicable.