PERFORMANCE WORK STATEMENT (PWS)

Project: Install Jace 8

Location: Biosciences Research Laboratory (BRL)

1616 Albrecht Blvd N, Fargo ND 58102

GENERAL INFORMATION

1.0 Performance Work Statement: BRL Jace 4 is failing, and BRL Jace 6 is on loan from supplier. Both are obsolete and utilize vulnerable Java plug-in software. These two units should be replaced by one Jace 8 BAS unit running HTML5, alleviating Java software vulnerability.

Supplier will prepare programming and graphics then install.

2.0 Background: Current Jace equipment is obsolete, failing, and utilize discontinued and vulnerable software and should be replaced without delay. The Jace 8 system controller integrates information from all facility HVAC systems and sensors for the building automation system (BAS), and gets disparate parts to communicate with each other. It takes the information from our Simplex Fire alarm panel and converts it to our BAS software program. Most of the setpoints are related to our HVAC controllers. Originally run on Java, (JACE stands for Java Application Control Engine) the new Jace systems out of necessity move away from Java as that system is no longer secure and, those systems ran on Internet Explorer, which is unsupported, insecure, and soon abandoned.

The JACE 8 is at the heart of a facility’s systems, allowing HVAC to dynamically change, alarm, report as necessary. It is the backbone for controlling heating, cooling, ventilation.

CONTRACTOR REQUIREMENTS

3.0 Technical Requirements/Tasks:

A. Prepare programming and graphics for Jace 8 replacement unit.

B. Install Jace 8.

C. Perform on-site interface checks, adjustments, and fixes. Provide training to key maintenance personnel.

D. Uninstall existing Jace 4 and Jace 6 units and return to USDA.

E. Provide one-line diagram of connections both upline and downline from Jace 8.

4.0 Government Furnished: None

5.0 Deliverable / Schedule

Item No.

Deliverable Objective Due

1 Preparing programming and graphics

Prepare Jace 8 for installation and operation

4 weeks after award

2 Install Jace 8

Controller and remove existing Jace controllers

Update and improve Building

Automation System with current and secure system

5 weeks after award

3 On-site interface checks

Ensure proper installation and operation of updated Jace controller

5 weeks after award

4 Uninstall Jace 4 and

Jace 6

Remove units from BAS operation 5 weeks after award

8.0 Security Requirements: All personnel shall have a U.S. photo ID, such as U.S. Driver’s

License, or U.S. passport.

9.0 Data Rights: Not Applicable.

10.0 Section 508: Electronic and Information Technology Standards: Electronic submittals and manuals are to be in Adobe file format.

11.0 Period of Performance: The performance period for this task is 25 business days.

12.0 Attachments: Please see attachment

6.0

7.0

Travel: Not applicable

Contractor’s Key Personnel:

A. Programmers and installers

Jace 8 Installation

Jace 4 Rm 155

Jace 6 Rm M101

Jace 8 Install - SOW (1).pdf
Jace 8 Install Attachment.pdf
Jace 8 Installation
Slide Number 2

File details come from the government source that posted it. Updated .