Attachment 1 SOW.pdf
PDF 528 KB Posted
- Attached to
- Access Control Upgrade
- Solicitation number
- FA460826QS031
About this file
This is a Statement of Work (SOW) for an access control and door hardware upgrade project designed to enhance building security and modernize access control infrastructure. The contractor shall remove and dispose of sixteen existing crash bars and install sixteen new stainless steel crash bars on designated doors, ensuring proper alignment, lubrication, and functionality testing. Additionally, the contractor must install approximately 17,000 feet of Category 6 (CAT 6) network cabling to service the sixteen doors, with all wiring neatly managed, secured with appropriate wire hangers, and terminated at both door and head-end locations. The contractor shall also install five new Paxton keypads at specified locations with dedicated power sources for each unit and integrate them with the existing access control system.
All necessary materials, equipment, and consumables shall be provided by the contractor, including sixteen stainless steel crash bars, 17,000 feet of CAT 6 wiring, five Paxton keypads with associated power sources, and all lubricants, springs, pins, fasteners, connectors, and wire hangers. Project deliverables include removal of old crash bars, installation and successful function testing of new crash bars, completed installation and termination of CAT 6 cabling, installation and successful function testing of Paxton keypads, and a clean work area with all project-related debris removed. Acceptance criteria require visual inspection and successful operational testing of all sixteen installed crash bars, successful data connectivity testing of all newly installed CAT 6 cables, and demonstration of proper functioning of all five installed Paxton keypads.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work: Access Control and Door Hardware Upgrade
1.0. Introduction & Background
This Statement of Work (SOW) outlines the tasks and deliverables for the removal of existing door hardware and the installation of new crash bars, network cabling, and access control keypads. The objective of this project is to enhance building security and modernize the access control infrastructure.
2.0. Scope of Work
The contractor shall perform the following tasks:
2.1. Door Hardware Installation
• Remove and dispose of sixteen (16) existing crash bars from designated doors.
• Install sixteen (16) new stainless steel crash bars on the same sixteen (16) doors.
• Ensure all new hardware is properly aligned, lubricated, and tested for correct functionality.
2.2. Network Cabling
• Install approximately 17,000 feet of Category 6 (CAT 6) network wiring.
• The wiring shall service the sixteen (16) doors designated for hardware replacement.
• All wiring is to be neatly managed, secured with appropriate wire hangers, and terminated at both the door and the head-end location.
2.3. Access Control System
• Install five (5) new Paxton keypads at specified locations.
• Install and connect a dedicated power source for each keypad.
• Integrate and test the keypads with the existing access control system.
3.0. Materials to be Provided
The contractor shall provide all necessary materials, equipment, and consumables required to complete the work, including but not limited to:
• Sixteen (16) stainless steel crash bars.
• 17,000 feet of CAT 6 wiring.
• Five (5) Paxton keypads and associated power sources.
FA460826QS031
Attachment 1
• All necessary lubricants, springs, pins, fasteners, connectors, and wire hangers.
4.0. Project Deliverables
• Removal of sixteen (16) old crash bars.
• Installation and successful function testing of sixteen (16) new crash bars.
• Completed installation and termination of 17,000 feet of CAT 6 cabling.
• Installation and successful function testing of five (5) Paxton keypads.
• A clean work area, with all project-related debris removed upon completion.
5.0. Acceptance Criteria
The project will be considered complete and accepted upon:
• Visual inspection and successful operational testing of all sixteen (16) installed crash bars.
• Successful data connectivity test of all newly installed CAT 6 cables.
• Demonstration of the proper functioning of all five (5) installed Paxton keypads.
FA460826QS031
Attachment 1
File details come from the government source that posted it. Updated .