This is a Statement of Work (SOW) prepared by Buckley Space Force Base (BSFB) in Colorado for the replacement of a degraded chilled water system serving Building 1028. The project encompasses the complete replacement of a chiller unit, two Computer Room Air Handlers (CRAHs), and associated distribution piping, with the contractor responsible for providing all necessary materials, tools, equipment, and qualified labor. The system design must be based on Trane-series equipment to support standardization goals, and the new chiller must fit within the existing concrete pad dimensions of 19'11" L x 12'8" W x 6'8" H with a maximum operational weight not exceeding 12,000 lbs. The contractor must perform cooling system design load calculations in accordance with UFC 3-410-01, integrate the system into the existing 460V, 60 Hz, 3-Phase electrical supply, comply with environmental refrigerant requirements under UFC 3-401-01, and ensure sound and vibration control meet UFC specifications. Additionally, the contractor must provide temporary cooling throughout installation to maintain server room operational temperatures, commission all new equipment upon completion, and deliver final documentation including as-builts, operation and maintenance manuals, commissioning reports, manufacturer warranties, and operational and safety check summaries.
This is a Total Small Business Set-Aside contract under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors) intended to address the current system's operation at half capacity and risk of critical cooling loss for 24/7 server room operations. All contractor personnel must be certified and licensed to service Trane chilled water systems and CRAHs, with specialized experience in computer room cooling applications. The project is subject to rigorous Operations Security and Anti-Terrorism/Force Protection requirements, including personnel background checks, mandatory AT Level I Awareness training, escort protocols, and strict prohibitions on photographing documents, discussing project details outside approved personnel, and posting information on social media. Contractors must comply with all applicable UFC standards, OSHA regulations, National Electric Code 2026, International Building Code 2018, and state and local building codes. All infrastructure materials and documentation provided by the government must be returned to the 460th Civil Engineer Squadron upon project completion.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
STATEMENT OF
WORK
FOR
B1028 Chilled Water System Replacement
606 S. ASPEN ST.
BUCKLEY SFB, COLORADO
80011
20 May 2026
1.0 Scope of Work
1.1 Overview
The chilled water system serving building 1028 suffers from degraded serviceability, requiring an increase in corrective maintenance. To prevent future downtime caused by sub-component failures and other performance issues, the unit will need to be replaced. Replacing the chilled water system will increase reliability, avoiding any future interruptions to mission.
1.2 Primary Objective
The Contractor shall provide all supplies, materials, tools, equipment, and qualified labor necessary to replace the chilled water system consisting of a chiller, two computer room air handlers (CRAHs), and associated distribution.
1.3 Chilled Water System Replacement
The contractor is responsible for providing all material and qualified labor necessary for the completion of this project. The contractor shall:
• Base the design of the chiller system on Trane-series equipment to support the Government’s goal of equipment standardization.
• Provide temporary cooling to ensure server room temperatures are within operational limits.
• Decommission and remove the chiller, CRAHs 1 and 2, along with all necessary associated distribution.
• Provide and install new Trane chiller system meeting the following technical specifications:
o Physical footprint must fit onto the existing concrete pad (19’ - 11” L x 12 ‘- 8” W x 6 “- 8” H”). If the equipment exceeds these dimensions, the pad shall be extended to accommodate the new equipment.
o The operational weight of the new chiller system must not exceed the existing concrete pad’s load capacity of 12,000 lbs.
o System Capacity to be determined by performing a cooling system design load calculation in accordance with UFC 3-410-01, Sections 2-4 and 2- 5.6.
o Must integrate into the existing electrical 460V, 60 Hz, 3-Phase power supply and comply with all the applicable requirements in UFC 3-501-01.
o The refrigerant type must comply with the environmental requirements specified in UFC 3-401-01, Section 2-5.
o Sound and vibration control must comply with the requirements in UFC 3-410-01, Section 2-19.
o Must integrate into existing base Energy Management Control System
(EMCS) and meet all applicable requirements in UFC 3-410-01, UFC 3- 410-02 and EMCS Standards 21JAN2026.
• Provide and install CRAHs meeting the following technical specifications:
o Physical dimensions must fit in designated server room, utilizing a pathway with door clearances measuring 34” W x 82” H.
o System capacity to be determined by performing a cooling system design load calculation in accordance with UFC 3-410-01, Sections 2-4 and 2- 5.6.
o Must integrate into existing electrical 460V, 60 Hz, 3-Phase power supply and comply with all applicable requirements in UFC 3-501-01.
o Sound and vibration control must comply with the requirements in UFC 3-410-01, Section 2-19.
o Must integrate into existing base Energy Management Control System
(EMCS) and meet all applicable requirements in UFC 3-410-01, UFC 3- 410-02, and EMCS Standards 21JAN2026.
• Following installation, commission all new equipment verifying proper system performance.
1.4 Contractor-Furnished Items
The contractor is responsible for providing all necessary qualified labor, materials and equipment, including but not limited to:
• Tools and specialized equipment needed to install a new chilled water system.
2.0 Governing Standards
All work shall be performed in strict accordance with the manufacturer's specifications and the latest editions of the following codes and standards:
• UFC 3-401-01 Mechanical Engineering
• UFC 3-410-01 HVAC Systems
• UFC 3-410-02 Direct Digital Control For HVAC
• UFC 3-501-01 Electrical Engineering
• UFC 3-520-01 Interior Electrical Systems
• UFC 1-200-01 General Building Requirements
• UFC 3-600-01 Fire Protection Engineering for Facilities w/ Change 6
• UFC 4-010-06 Cybersecurity of Facility Related Control Systems
• UFGS 01 35 26 Governmental Safety Requirements
• UFGS 23 05 11 Common Work Results for HVAC
• OSHA .29 CFR 1926.501: Duty to Have Fall Protection
• OSHA 3146-05R 2015: Fall Protection in Construction
• UFGS 23 05 93 Testing, Adjusting and Balancing for HVAC
• UFGS 23 64 00 Chilled Water Systems
• UFGS 23 09 00 Instrumentation and Control for HVAC
• UFGS 25 05 13 – Electronic Security System Infrastructure
• National Electric Code (NEC) 2026
• International Building Code (IBC) 2018
• National Fire Protection Association (NFPA) 70, 90A, and 101.
• State and Local Building Code Standards
3.0 Technical & Compliance Requirements
3.1 Definition of Qualified Labor
The contractor must ensure all technicians are certified and licensed to service, repair, and install chilled water systems in accordance with the standards listed in Section 2.0.
Furthermore, all technicians must possess specialized certification and experience with the following specific equipment:
• TRANE chilled water systems
• Specialized Chilled water systems for computer / server rooms
• Computer Room Air Handlers CRAHs
4.0 Reporting & Deliverables
Upon project completion, the contractor shall submit a final report containing the following detailed information:
• As-builts of newly installed system
• Newly installed equipment’s O&M manuals
• Commissioning report
• Manufacturer warranty info.
• A summary of all operational and safety checks performed.
5.0 OPSEC & Anti-Terrorism/ Force Protection Requirements
The Contractor shall review and adhere to all Operations Security & Anti- Terrorism / Force Protection measures listed in this section IAW BSFB’s most current AT Plan. Project managers from the 460th CES will verify that all contractors have reviewed and understand the following requirements.
• Entry, Escorts & Training: Prior to authorizing entry to SBD@2the 460th SFS will verify the trustworthiness of all personnel through National Crime Information Center and other local files checks.
Authorized personnel will escort contractors as required. Contractors needing access to critical information or indicators must complete OPSEC training, provided at no cost by OPSEC Coordinators.
All contractors entering the installation will be accomplish AT Level I Awareness (FP) training.
• Training can be found in the following link:
https://www.jcs.mil/JKO/Latest-News/JKO-Customer- Spotlights/Article/2945182/antiterrorism-training-on-jko-offers-broad-reach/
• Document Control: Contractors must return all infrastructure materials (building plans, diagrams, blueprints, maps, etc.) provided during the contract to the 460th Civil Engineer Squadron (460 CES) for proper accounting and disposal.
• Credential Protection: Personnel not permanently assigned to Buckley Space Force Base (BSFB) must secure their base access credentials (passes, badges, etc.) at all times while off the installation.
• Information Security: To maintain operational security, contractors are strictly prohibited from:
• Discussing project details, documents, or system outages/downtimes with anyone not directly involved in the contract execution.
• Photographing any documents, blueprints, maps, or materials obtained during the project.
• Broadcasting or posting work details, locations, or photos on any social media platforms.
• Infrastructure: The project manager will coordinate with the 460th CES prior to connecting any equipment to base infrastructure to include the following. Additionally, at no point will the contractor connect to any base communication/internet network.
• Base Fire Hydrants
• Power Sources
• Communication ports
• Mandatory Compliance: All personnel performing work on the installation will comply with the following:
• Real World AT/FP measures.
• Traffic Laws
• Prohibitions against bringing firearms or weapons on the installation.
• Travel directly to worksite from entry control point and avoid deviating from approved routes.
• Avoid leaving worksite without escort/approval to avoid trespassing into restricted / sensitive areas of the installation.
ATTACHMENTS:
Attachment 1: EMCS Standards 21 Jan 26
EMCS Standards 21Jan26.docx
Attachment 2: Chiller
Technical Systems (Model: 30A0LM20-PT, Serial: 02-17-125822-001-001)
Attachment 3: CRAHs 1 and 2
Data Aire (Model: GFCU-04634, Serial: 2016-3226-A, 20163225-A)