Attachment 1 - SOS PAUL CLARK UPDS.xls

XLS spreadsheet 64 KB Posted

Attached to
USCGC PAUL CLARK UPDS FY25
Solicitation number
70Z08025QPBPL0013
Issued by

About this file

This is a pricing template spreadsheet for the USCGC Paul Clark (WPC-1106) Unplanned Dockside Availability planned for FY2025. The template includes line items for definite work, including Reduction Gear Renewal, composite labor rates, GFP reporting, and travel/per diem, as well as provisions for Over and Above/Growth Work with an estimated 506 labor hours and material markup on $36,900.

The spreadsheet contains labor rate information for various geographic locations, ranging from $45-67 per hour, and includes calculations for G&A (15%) and profit factors (10%). It breaks down labor categories including Engineering Tech, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, General Labor/Helper/Rigger, and Superintendent/QA/NDT positions. This is a template document and does not contain actual pricing submissions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC PAUL CLARK (WPC-1106) UNPLANNED DOCKSIDE AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Reduction Gear, RenewJOB1$0.00
O-00AComposite Labor RateHour0$0.00
D-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB1$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Over and Above/Growth Work
The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.
OA/G-001**Provide breakdown, as follows:506$0.00
Over and Above/Growth Labor Rate
Unit Price: $________; Quantity: 506 ; Unit of Issue: Hour; Extended Price: $____________
OA/G-002Over and Above/Growth Material Markup/Handling Fee36,900.00%0
Unit Price: $36,900.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$36,900.00 X percentage quoted]: $______________
Total Price for Over and Above/Growth$0.00

&C(2/13/2025) Draft-00 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .