Attachment 1_Schedule of Services.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
USCGC CROCODILE DD FY23 Federal contract opportunity
Solicitation number
70Z08023QPBPL0016
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains a schedule of services and government estimate for drydock repair work on the USCGC Crocodile under solicitation number 70Z08023QPBPL0016 issued by the Department of Homeland Security United States Coast Guard. The schedule lists over 40 line items for work such as hull preservation, tank cleaning, shaft and propeller renewal, electrical inspection, and ventilation system maintenance. It also includes a foreseeable cost worksheet for contractors to estimate costs for transportation, per diem, cutter operations, and crew support expenses based on the distance from their facility to the cutter's homeport and the number of personnel. The total evaluated price will be the contractor's quoted price plus the estimated distance factors.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC CROCODILE DD FY23, newest first.
File Type Posted
Responses to Vendor Submitted Questions crocodile.pdf PDF
SF30-16_0001 (Response to Vendor Questions) signed Crocodile.pdf PDF
Attachment 2 Specification.pdf PDF
Combined Synopsis Solicitation CGC Crocodile FY23.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

GOVERNMENT ESTIMATE FOR:
USCGC CROCODILE (WPB-87) DRYDOCK AVAILABILITY FY2023
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (Side Scan), Ultrasonic Testing$0.00JOB1$0.00
O-002Ultrasonic Thickness Measurements, Perform$0.00JOB1$0.00
D-003U/W Body, Preserve, 100 percent$0.00JOB1$0.00
D-004Hull Plating Freeboard, Preserve, 100 Percent$0.00JOB1$0.00
D-005Tank, Dirty Oil, Clean and Inspect$0.00JOB1$0.00
D-006Tank, Oily Water, Clean and Inspect$0.00JOB1$0.00
D-007Tanks, MP Fuel Service, Clean and Inspect$0.00JOB1$0.00
D-008Decks, Exterior (Main Deck), Preserve$0.00JOB1$0.00
D-009Capastic Fairing, Depth Sounder, Renew$0.00JOB1$0.00
D-010Watertight Closures, Assess$0.00JOB1$0.00
D-011Mast, Preserve (“100%”) – Contractor Interference Removal$0.00JOB1$0.00
O-012Main Engine/Reduction Gear, Realign$0.00JOB1$0.00
D-013Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew$0.00JOB1$0.00
O-014Aft Water-Lubricated Propulsion Shaft Bearings, Renew$0.00JOB1$0.00
O-015Intermediate Bearing Carriers, Renew$0.00JOB1$0.00
D-016Aft Bearing Carriers, Renew$0.00JOB1$0.00
D-017Propulsion Shafts, Renew$0.00JOB1$0.00
D-018Stern Tube Interior Surfaces, Preserve, 100 Percent$0.00JOB1$0.00
D-019Propellers, Renew$0.00JOB1$0.00
D-020Electrical Power Distribution System, Thermographic Inspection, 450 VAC And Below$0.00JOB1$0.00
D-021Fathometer Transducer, Renew$0.00JOB1$0.00
D-022Speed Log, Skin Valve, Renew$0.00JOB1$0.00
D-023Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect$0.00JOB1$0.00
D-024Ducting, HVAC System, Clean$0.00JOB1$0.00
D-025Sea Water System, Perform Maintenance$0.00JOB1$0.00
D-026Rudder Assemblies, Renew$0.00JOB1$0.00
D-027Stern Launch Door, Remove, Inspect and Reinstall$0.00JOB1$0.00
D-028Grey Water Holding Tanks, Clean and Inspect$0.00JOB1$0.00
D-029Sewage Holding Tanks, Clean and Inspect$0.00JOB1$0.00
D-030Grey Water Piping, Clean and Flush$0.00JOB1$0.00
D-031Sewage Piping, Clean and Flush$0.00JOB1$0.00
D-032Cathodic Protection/Zinc Anodes, Renew$0.00JOB1$0.00
D-033Drydock$0.00JOB1$0.00
D-034Temporary Services, Provide - Cutter$0.00JOB1$0.00
D-035Sea Trial Performance, Support, Provide$0.00JOB1$0.00
D-036Superstructure, Preserve, 100%$0.00JOB1$0.00
D-037Soft Patches, STBD, Remove and Inspect$0.00JOB1$0.00
D-038Seawater Cooling Piping/Valves, Renew$0.00JOB1$0.00
D-039HVAC System, Repair$0.00JOB1$0.00
D-040Critical Coated Surface(s), Preserve$0.00JOB1$0.00
D-041Interior Deck Covering System And Jointer Deck, Renew$0.00JOB1$0.00
D-042Insulation, Renew$0.00JOB1$0.00
D-043Unmanned Space Ventilation Modify$0.00JOB1$0.00
D-044HVAC 2-Stage Intake Separator, Modify$0.00JOB1$0.00
D-045Fire Main Bleed Line, Modify$0.00JOB1$0.00
D-046Fire Alarm Control Panel, Replace$0.00JOB1$0.00
D-047Foundation, Boat Winch, Modify$0.00JOB1$0.00
D-048SEWAGE SYSTEM (TOILET), MODIFY$0.00JOB1$0.00
O-00AComposite Labor RateERROR:#REF!HourERROR:#REF!ERROR:#REF!
D-00BGFP ReportNSPEANSP
O-00ZLaydays$0.00Day5ERROR:#REF!
Total Price of Definite Items$0.00
Total Price of Option ItemsERROR:#REF!
Total Price of Definite and Optional ItemsERROR:#REF!

(12/6/2022)_x000D_ Draft-0 - Page &P of &N

FORSEEABLES

FORESEEABLE COST WORKSHEET
USCGC CROCODILEFY23
Contractor's Name:
The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet.
DISTANCE FACTORS FOR: USCGC CROCODILE Fort Myers Beach, FL 33931
NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM)
NUMBER OF DAYS OF AVAILABILITY
(1) Port Engineer Transportation: AIR TRAVEL
(Applicable if > 50 miles from PE address

(PE's desk location)

A. Number of CG Representatives from NESU:A=
B. The number of round trips between the contractor's facility and NESUB=
C. A multiplied by B:AxB=C=0
D. Travel cost per trip:D=

Massey, Marc A CIV: Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.E. C multiplied by D =E, if >50 miles from NESU otherwise N/A.E=$0.00
(2) Port Engineer Transportation: CAR TRAVEL
A. Number of CG Representatives from NESU:A=
B. Number of Driving miles Round-trip between the COR office and contractors facility:B=
C. Travel cost per driving mile (rate at $0.58 per mile)$0.580$0.00
(3) PER DIEM: (Applicable >50 miles CREW + PE)
A. Number of Ship's Crew & Port EngineerA=
B. Total number of day(s) in drydock.B=0
C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below)C=
C.1.1. Enter Lodging Daily Per Diem Rate for October
C.2.1. Enter Meals & Incidentals Total Daily Rate for October
C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate for October
D. Ax B= C: (if >50 miles from NESU)AxB=C=$0.00
(4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510)
A. Number of KO authorized travel:A=
B. Total number of KO travel days:B=
C. Transportation cost for KO travelC=
Massey, Marc A CIV: Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.D. Per diem cost at place of performance, per dayD=
D.1.1. Enter Lodging Per Diem Rate for Nov
D.2.1. Enter Meals & Incidentals Total Daily Rate for Nov
D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Nov
E. A [(B*D) + C] =E=$0.00
(5) CUTTER COST Operation Factors:
A. Round Trip Nautical Miles from the vessels pier to the contractors facility:A=0
B. Cutter Cost Factor Per Nautical Mile:B=
C. A multiplied by B= CC=$0.00
(6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below.
A. Number of Personnel entitled to Family Separation Allowance:A=
B. Number of Days for Availability minus 30 days if availability is greather than 30 days:B=
C. A multiplied by B = C (Daily FSA rate of $8.33)C=
(7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only
A. Number of Personnel (with dependents) entitled to HOME visit:A=
B. Number of Homeport Visits:B=
C Mileage to homeport = (Roundtrip Ticket Cost)C=

Massey, Marc A CIV: If contractor's facility is:

- located < 50 miles from the ship's homeport, enter $0.

- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58

- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.

Massey, Marc A CIV: Contractor enters name here Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Massey, Marc A CIV: Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.

Massey, Marc A CIV: Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.

Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.

D. A multiplied by B, multiplied by C = D:C=$0.00
GRAND TOTAL
1. PE/COR Transportation (AIRFARE)$0.00
2. PE/COR Transportation (CAR)$0.00
3. Per Diem for Crew and PE/COR$0.00
4. Cutter Cost Operations Factors$0.00
5. Family Separation Allowance$0.00
6. Crew Transportation Home Visit$0.00
Total Cost of Distance Factors:$0.00
Total Contractor Quoted/Proposal Price:ERROR:#REF!
TOTAL EVALUATED QUOTE/PRICEERROR:#REF!