Responses to Vendor Submitted Questions crocodile.pdf

PDF 2 MB Posted

Attached to
USCGC CROCODILE DD FY23 Federal contract opportunity
Solicitation number
70Z08023QPBPL0016
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains responses to vendor questions regarding solicitation number 70Z08023QPBPL0016 for drydock repair work on the USCGC CROCODILE. The solicitation involves various work items for repair and maintenance of piping systems, ventilation equipment, and related components on the vessel. Responses provide additional details on work scope such as confirming the need to chemically clean pipes if hydroblasting is insufficient, clarifying that the 5 linear feet of seawater piping replacement involves various fittings, and specifying the model of ventilation fan currently installed. Relevant technical drawings are also referenced to aid vendor understanding and pricing of requirements.

View the file

Other files for this federal contract opportunity

Other files attached to USCGC CROCODILE DD FY23, newest first.
File Type Posted
SF30-16_0001 (Response to Vendor Questions) signed Crocodile.pdf PDF
Attachment 2 Specification.pdf PDF
Attachment 1_Schedule of Services.xlsx XLSX spreadsheet
Combined Synopsis Solicitation CGC Crocodile FY23.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Vendor Submitted Questions CROCODILE DD FY23 Solicitation: 70Z08023QPBPL0016

WORK ITEM 30: Grey Water Piping, Clean and Flush “3.5.6 In the event that hydroblasting alone does not clean piping to required conditions, Contractor must use chemical cleaning methods.”

Is chemical cleaning viable for equitable adjustment if required or should contractor bid to perform both hydro blast and chemical clean?

The contractor should submit an estimate to hydro clean the pipes and if the hydro cleaning does not work, submit a change request to chemically clean the pipes.

WI 38 Seawater Cooling Piping/Valves Renew Task#1 requires replacement of 5 Linear feet of piping and associated fittings.

Is the 5ft to be replaced a single pipe run?

Are associated fittings known so accurate pricing can obtained?

No, it is not a single pipe run. Yes, there are fittings that will need to be replaced. All the information for the 5 linear feet of piping and fittings on the discharge side of the AC raw water pump can be found on Coast Guard Drawing 87 WPB 256-001, Rev AC, Seawater Cooling Piping and Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping System.

WI 43 Unmanned Space Ventilation Modify

DWG 87 WPB 514-005 REV E

GN#8

Which size fan is currently installed in the Lazarette onboard USCGC Crocodile?

The fan we have is 250CFM blower, Jabsco Model # 36760-0115.

wondering if the USCG can release these drawings related to WI D-011:

Additional Drawings have ben added to the received link for the drawings and references.