Attachment 1 PWS Warrior FIT FY22-23 20220731 FINAL.pdf

PDF 266 KB Posted

Attached to
Warrior F. I. T. Program Federal contract opportunity
Solicitation number
W912SV22R0009
Issued by
Department of the Army National Guard

About this file

This is a combined synopsis/solicitation for commercial services to provide a Warrior F.I.T. Program for the Massachusetts National Guard. The MANG requires a comprehensive holistic health and fitness initiative to improve emotional health, promote positive behavior change, and encourage engagement in physical, mental, and spiritual fitness activities while optimizing human performance. The requirement includes providing full-time human performance specialists, executing in-person didactic workshops, providing access to an online learning portal and mobile application, and conducting program implementation and outcome evaluation. The Government intends to award a single firm fixed price purchase order under Simplified Acquisition Procedures using a Service-Disabled Veteran-owned Small Business set-aside. Interested vendors must meet the small business size standard of 750 employees and add the applicable NAICS code to their SAM representations by the response date.

View the file

Other files for this federal contract opportunity

Other files attached to Warrior F. I. T. Program, newest first.
File Type Posted
QandA_W912SV22R0009_20220907.docx DOCX document
QandA_W912SV22R0009_20220830.docx DOCX document
QandA_W912SV22R0009 26 Aug 22.docx DOCX document
Attachment 3 Provisions and Clauses.pdf PDF
Attachment 2 Past Perf Interview Form.pdf PDF
Combined Synopsis Solicitation Warrior FIT FY22-23.pdf PDF
WD2015-4047.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

MANG Warrior Resilience & Fitness Directorate Warrior Functional Intensive Training (F.I.T.) Program

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Warrior Functional Intensive Training (Warrior F.I.T.)

Program Services, as defined in this PWS.

1.2 Background: The U.S. Army (USA), U.S. Air Force (USAF), and the Massachusetts National Guard (MANG) is committed to leaving no Service Member behind. The Warrior Fit program is a joint, comprehensive holistic health and fitness (H2F) and human performance optimization initiative. The MANG leadership is committed to the well-being and quality of life of Service Members across the MANG. The Warrior F.I.T.

program demonstrates to Service Members that they are of value to the Massachusetts National Guard and provides them with the education and tools to achieve personal and professional success within the MANG, their civilian careers and in their communities.

The Warrior F.I.T. program is both an upstream prevention initiative and a real time intervention aimed to improve emotional health, promote positive behavior change, and encourage engagement in physical, mental and spiritual fitness activities while optimizing human performance in support of individual wellness and organizational goals. Objectives of this program include increased individual and unit readiness, service member retention and lethality as well as improved individual health outcomes, quality of life and feelings of belongingness.

1.3 Period of Performance (PoP): The Period of Performance shall be 12 months.

1.4 General Information:

1.4.1 Place and Performance of Services for full time staff: Each full time employee is expected to perform 40 hours of services on this contract per week. Hours may vary however presence is expected during normal organizational operating hours. It is expected that full time employees are available to support MANG members during their scheduled training periods, which include pre-identified nights and weekends. Work performed outside of normal hours is authorized in support of program requirements and in coordination with COR. No overtime or compensatory time is authorized. This schedule is expected to be adhered to except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.

Primary office locations for the three (3) full-time human performance specialists (see paragraphs 5.1 – 5.3 ) shall be at Hanscom Air Force Base, although other locations throughout Massachusetts will be expected to support units at their home station and field training locations. The contractor shall always maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework: In furtherance of staffing with respect to pressures of tight labor market, the Government may permit the prime contractor to authorize telework for its employees to ensure that the Government's mission-critical operations stay functional and as required by the company’s operational plan or needs of its employees. Telework may be authorized weekly but will not exceed 2 workdays in any given work week.

1.4.1.1.1 In furtherance of Continuity of Operations Planning (COOP), Telework may also be authorized during times of national emergency or incidents of national significance.

1.4.1.1.2 The Contractor’s telework plan must be approved by the Contracting Officer to be in the best interest of the Government.

1.4.1.1.3 The Contractor’s telework plan for employees working on this effort for the above circumstances is subject to review by the Government.

1.4.1.1.4 The Contractor must provide to the COR the teleworking hours (planned and actual) and description of planned and actual tasks performed for each of its employees authorized to telework at the beginning and end of each telework day.

1.4.1.1.5 The Contractor shall continue to be responsible and accountable for all Government Furnished Property (GFP) in the possession of its employees.

1.4.1.1.6 All telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 business days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 For contractors requiring Common Access Card (CAC): The CAC is the DoD

Federal Personal Identity Verification (PIV) credential. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled Tier 1 investigation at the Office of Personnel Management.

Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real-Time Automated Personnel ID System (RAPIDS) using the DD Form 1172-2 or the Trusted Associate Sponsorship System (TASS).

1.4.5.1.1 HSPD-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them and shall process all CAC card applications. The contractor shall ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form at Attachment 1 at the earliest possible date and that this form is forwarded to the COR immediately. The COR will review the form for completeness and accuracy and forward it to the National Guard Bureau (NGB) Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e-mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations Processing (e-QIP) system. Upon completion of the- QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation (BI) will be initiated. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.

1.4.5.1.2 Trusted Associate Sponsorship System (TASS): The contractor shall process CAC applications through the TASS, the procedures for which are described below.

Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the BI, the TASS application process and other CAC and security-related matters, such designation facilitates these processes. If an FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:

1. The contractor's FSO or contractor employee shall submit requests for a CAC via the identified COR/ACOR to the designated TASS Trusted Agent (TA). The TASS TA for this requirement will be Mr. Brian J. Daley, (339) 202-3188.

2. The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a USER ID and password, via email, to the FSO.

The FSO or contractor employee shall access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at:

https://www.dmdc.osd.mil/tass/. The FSO or contractor employee shall follow up to ensure that the TA is processing the request.

3. The Government will inform the contractor's applicant, via email, of one of the following:

a. Approval. * Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator:

http://www.dmdc.osd.mil/rsl/).

b. Rejection. * The Government, in separate correspondence, will provide reason(s) for rejection.

c. Return. Additional information or correction to the application required by the contractor employee.

*The contractor shall maintain records of all approved and rejected applications.

1.4.5.1.3 At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by SSN and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615- 0047, "Employment Eligibility Verification." Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.

1.4.5.1.4 The contractor shall manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the TA, unless there are extenuating circumstances approved by the COR or KO.

1.4.5.1.5 The contractor shall return issued CACs to the DEERS office upon departure or dismissal of each contractor employee, and shall obtain a receipt for each card and provide it to the TA/COR.

1.4.5.1.5.a Failure to comply with these requirements may result in withholding of final payment.

https://www.dmdc.osd.mil/tass/ http://www.dmdc.osd.mil/rsl/)

1.4.5.1.6 The contractor will be required to obtain an Army email address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. Due to recent changes to Army email procedures, the source for obtaining the email address is being revised; this PWS will be updated to reflect procedures for obtaining the email address. Note: If employees of a contractor lose the privilege to access the network or Army email account, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their network and Army email accounts.

1.4.5.2 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website:

https://jko.jten.mil/courses/atl1/launch.html.

1.4.5.3 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, (if no COR is assigned, delete “to the COR” and replace with “to the KO”) within 15 calendar days after completion of training.

1.4.5.4 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.5 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy, and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the https://jko.jten.mil/courses/atl1/launch.html level of information processed or available on the system. Contractor employees shall:

1.4.5.5.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.

1.4.5.5.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://atc.us.army.mil/iastar/docs/Training_BBP.pdf).

1.4.5.5.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.

1.4.5.5.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.

1.4.5.5.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.

1.4.5.6 Army Training Certification Tracking System (ATCTS): All contractor employees with access to a Government information system shall be registered in ATCTS (https://atc.us.army.mil/iastar/index.php) at commencement of services and shall successfully complete the DoD Information Assurance awareness training prior to access to the IS and then annually thereafter. (https://iatraining.us.army.mil/).

1.4.5.6.1 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.

1.4.5.7 Information Assurance (IA) Training. All contractor employees and associated subcontractor employees shall complete the DoD IA Awareness Training before issuance of network access and annually thereafter.

1.4.5.8 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.

1.4.6 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.

1.4.7 The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7.1 Key Control. NOTE: All references to keys include key cards. The contractor https://atc.us.army.mil/iastar/docs/Training_BBP.pdf https://securityawareness.usalearning.gov/opsec/index.htm shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall include procedures covering key control in the QCP.

1.4.7.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.

1.4.7.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and will deduct the total cost from the monthly payment due the contractor.

1.4.7.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.8 Special Qualifications: The contractor shall ensure all subject matter expert employees possess the following degrees, licensures, coursework, and certifications listed below:

1.4.8.1 Lead Human Performance Integrator: Shall possess at least a master’s degree in Exercise Science or Physiology from an COAES, CAAHEP, or equivalent accredited institution. Must also have either a current American College of Sports Medicine (ACSM) Exercise Physiologist Certification (EP-C) or National Strength and Conditioning Association (NSCA) Certified Strength and Conditioning Specialist (CSCS) certification. This individual must also have greater than two (2) years’ experience with data analytics.

1.4.8.2 Performance Nutrition Coach: Shall be a currently certified, Registered Dietician licensed within the Commonwealth of Massachusetts. Possession of a master’s or doctoral in the field of dietetics and/or nutrition is required. A Certified Sports Science Dietitian (CSSD) credential is desirable.

1.4.8.3 Injury Prevention & Recovery Coach: Must have passed the National Physical Therapy Examination and be a current licensed Physical Therapist in the Commonwealth of Massachusetts. A Doctoral degree in physical therapy is highly desirable. A current ACSM EP-C or NSCA CSCS certification is required.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicle passes) to the KO within 14 days of an employee’s departure.

1.4.11 Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Contractor Travel: The contractor shall travel to MANG and federal installations upon request during the performance of this contract to implement mobile Warrior Fit Training modules, Service Member assessments and screenings and the Warrior F.I.T.

in-person didactic instruction program.The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract to all requested installations with the exception of the primary duty locations for full-time contractor personnel of Hanscom Air Force Base and Joint Base Cape Cod (workshops). All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made.

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.16 Phase In / Phase Out Periods: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor shall have personnel on board during the two-week (14-day) phase in/ phase out periods. During the phase in period, the contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.

This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager CMRA Contractor Manpower Reporting Application COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s)

KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers, and other items necessary to maintain an office environment. Computers (i.e., Laptops) furnished shall allow for work at other than the primary work location(s) as required for work workshops and other events, and also telework if/when authorized.

3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1. This shall include hand-outs and digital access to all educational curriculum presented to service members; to include access to any referenced psychological health, resiliency, fitness, and nutrition journals.

5.0 Requirements: The contractor shall provide services in support of the Massachusetts National Guard Warrior F.I.T. program. This program provides Service Members with the tools and training necessary to meet DoD physical fitness, height-weight and readiness standards while optimizing operational readiness and demonstrating knowledge and engagement in a wellness focused lifestyle. The contractor will assist in implementing initiatives aimed at increasing total force engagement in wellness activities, improving medical readiness, and increasing mental agility/ fund of knowledge related to injury prevention, nutrition, sleep hygiene, resiliency, and stress reduction. Contract personnel will engage Service Members in innovative educational and didactic forums in order to demonstrate increased physical, mental and spiritual fitness outcomes and ensure Service Members identify with a mindset associated with tactical athletes/warriors. The contractor shall provide three (3) Full Time Equivalent (FTE) Human Performance Specialist: one (1) Lead Human Performance Integrator, one (1) Performance Nutrition Coach, and one (1) Injury Prevention and Recovery Coach to support the Warrior Resilience & Fitness program 40 hours per week. The employee special qualification requirements for the FTE employees are stated in section 1.4.8 .

5.1 The Lead Human Performance Integrator will serve as the primary point of contact between MANG personnel and the contractors extended human performance network of industry and technical experts. This individual shall provide 40 hours of services per week. The Lead Human Performance Integrator shall possess a general understanding of kinesiology, dietetics and nutrition, physical therapy, sports and motivational psychology, occupational therapy, cognitive performance, and strength and conditioning principles. The Lead Human Performance Integrator is expected to attend all Warrior F.I.T. program IPRs, coordinate and perform baseline, mid-point, and follow-up data collection/analyzation, provide access to raw data collected and present program outcomes to the COR in accordance with the deliverables schedule. This individual shall serve as conduit to and facilitate participant consultation with human performance subject matter experts. The Lead Human Performance Integrator shall ensure adequate subordinate personnel are available to conduct drop-in performance and assessment screening opportunities at Hanscom AFB and at pre-determined MANG and federal installations. The Lead Human Performance Integrator shall provide or coordinate program overviews, educational briefings and resource brokerage services to individual MANG members and units as requested. The Lead Human Performance Integrator shall evaluate policies and directives from higher headquarters and advise on impact and actions necessary to implement and sustain program objectives and requirements.

The Lead Human Performance Integrator shall ensure continuity of program operations and Service Member human performance maintenance initiatives. The Lead Human Performance Integrator shall provide technical oversight to implement and execute human performance programs to prevent injury and optimize peak physical, mental and spiritual conditioning. In coordination with the Warrior Resilience and Fitness Division, the Lead Human Performance Integrator shall research, adapt, and modify the Warrior F.I.T. program to address requirements for which no methods exist. This includes but is not limited to: Creating and modifying program guidelines, processes, and methods based on user feedback, emerging mission requirements, or changes in technology or research, tailored to the unique operational requirements of the MANG. The Lead Human Performance Integrator serves as the on-site supervisor for the contractor’s employees assigned to this contract. As the on-site supervisor, the Lead Human Performance Integrator assigns and reviews work, guides and leads subordinate contract staff in the execution and development of specific program goals. The Lead Human Performance Integrator shall certify time and attendance and other expenditures associated with the performance of duties and as directed by the contractor. Provides mentorship and team building among team members.

5.2 The Performance Nutrition Coach shall serve as the primary SME for nutrition and dietary consultations for MANG personnel. The Performance Nutrition Coach shall provide 40 hours of services per week. The Performance Nutrition Coach is expected to utilize accurate and relevant data and information to identify nutrition-related problems;

identify specific nutrition problem(s)/diagnosis(es); identify and implement appropriate, purposefully planned interventions designed with the intent of changing a nutrition-related behavior, risk factor, environmental condition, or aspect of health status for an individual, large group, or the MANG at large; and monitors and evaluates indicators and outcomes data directly related to the nutrition diagnosis, goals, and intervention strategies to determine the progress made in achieving desired outcomes of nutrition care. The Performance Nutrition Coach conducts assessment, diagnosis, intervention and monitoring and evaluation of individuals and groups with the goal of improving foundational health (chronic disease prevention and immune system enhancement), optimizes environmental and task-specific performance (event fueling and post-event recovery, body composition, mental function, and arduous environment preparedness), and delivering nutrition support to facilitate transition from recovery and rehabilitation to return to duty. The Performance Nutrition Coach shall conduct screening and assessment for individuals enrolled in the service Body Composition Program. Charts findings in the Service Member health record if required by applicable policy. In addition, the Performance Nutrition Coach shall participate in command consultations regarding unit wellness and in support of holistic health & fitness (H2F) objectives. The Performance Nutrition Coach develops comprehensive performance nutrition programs that improve foundational health (chronic disease prevention and immune system enhancement) and optimize environmental and task-specific performance (event fueling and post-event recovery, body composition, mental function, and arduous environment preparedness). The Performance Nutrition Coach collects outcomes metrics to assess the effect of performance nutrition programs, identifies whether adjustments are required to meet the desired outcome, and continues to monitor and provide guidance to improve the performance nutrition and Warrior F.I.T. program. The Performance Nutrition Coach incorporates best available research/evidence and feasible best practices in the development of nutrition services/programs to provide safe, high-quality services in an organized, collaborative, individual and/or unit focused manner. The Performance Nutrition Coach shall train and mentor Master Fitness Trainer (MFTs), Nutrition Care Specialists, Culinary Specialists, garrison food service workers, inter-professional team members, and other Service Members to standardize nutrition messages across the MANG IAW best available research/evidence and feasible best practices. The Performance Nutrition Coach shall develop and deliver unit leader performance nutrition training through Officer Professional Development (OPD), Non- Commissioned Officer Professional Development (NCOPD), and other unit leader training forums. The Performance Nutrition Coach shall comply with requests for documents required to obtain clinical privileges through the Office of the State Surgeon /National Guard Bureauif eligible for credentialing and privileging during the period of performance.

5.3 The Injury Prevention & Recovery Coach (IPRC) shall serve as the primary SME for injury prevention and rehabilitation consultations as well providing therapeutic exercise prescriptions and sessions as necessary. This individual shall provide 40 hours of services per week. The IPRC shall provide a complete range of clinical and non-clinical services including assessing, planning, evaluating, and modifying exercise programs for groups or individuals. The IPRC shall counsel, teach, and coordinate with other Warrior F.I.T. teammates or administrators to manage Service Member physical performance and healthcare progressing them through training, reintegrating them following injury or preparing them for a deployment. The IPRC shall participate in command consultations regarding unit wellness / holistic health & fitness (H2F) and participate in / provide instruction at Officer and Non-Commissioned Officer Professional Development seminars. The IPRC provides full range of professional injury screening and prevention, evaluation, diagnosis, and treatment (for eligible service members) to maximize Service Member performance and improve unit readiness. The IPRC trains and mentors MANG Warrior FIT Human Performance Team members to include unit-level Master Fitness Trainers. The IPRC liaises with MANG command leadership, the Office of the State Surgeon, military medical providers, and military treatment facility (MTF) Rehabilitation, Pain Management, Radiology, and Orthopedic Surgery services as applicable. IPRC services include providing physical therapy evaluation, diagnosis, therapeutic intervention, and follow-up care to treat eligible acutely ill, and injured service members with needs concerned with, but not limited to, physical rehabilitation, musculoskeletal extremity injury, spine complications or injuries, neurological injuries/impairments, and pain. The IPRC plans and organizes professional injury screening and prevention, evaluation, and in close proximity to where Soldiers train daily. Participates in injury control research, analysis, and reporting as requested by COR/KO to support MANG Warrior F.I.T. program goals and objectives. The IPRC assesses movement patterns in individual Service Members or groups of Service Members and implements corrective interventions designed to improve performance and reduce future injury risk according to standard operating procedure and available evidence-based practice. The IPRC advises Commanders and Warrior Resilience & Fitness directorate on the development and safe implementation of strength and endurance programming and execution to maximize individual Soldier and unit readiness. The IPRC teaches and assists MANG leaders to plan, coordinate, and implement goal-oriented group and/or focused individual PT treatment programs, selecting activities to increase or improve muscle strength, range of motion and coordination; teaches alternative or compensatory techniques for rehabilitation, reconditioning, and functional tasks regardless of physical, mental, and/or cognitive deficits. The IPRC designs individual Service Member treatment plans for eligible personnel in order to meet clinical objectives to maximize restoration of military performance and provides feedback in written and verbal format to Service Members and/or unit leaders. The IPRC analyzes and observes psychosocial and environmental factors that contribute to the impact of injury or illness on daily functional capabilities in MANG training and operational areas. The IPRC must be able to personally demonstrate, utilize and teach the use of physical performance measures including components of the Army Combat Fitness Test (ACFT) and Air Force Physical Fitness Test. The IPRC integrates expertise with that of the Warrior F.I.T. team to arrive at coordinated, holistic care plans designed to achieve the Warrior F.I.T. program objectives. The IPRC communicates with Master Fitness Trainers and Human Performance Integrators (Strength and Conditioning coaches) on collaborative and safe rehabilitation plans using input from other Warrior F.I.T. teammates and unit leadership.

The IPRC complies with requests for documents required to obtain clinical privileges through the Office of the State Surgeon /National Guard Bureau if eligible for credentialing and privileging during the period of performance.

5.4 Warrior F.I.T. program implementation. All human performance contractor employees must meet the minimum requirements for their specialty as outlined in 1.4.8

5.4.1 The contractor shall execute one multi-day in- person didactic human performance screening, assessment, education & training workshop series utilizing full-time staff along with MANG civilian and military personnel for Service Members who currently do not meet readiness and performance standards or who have been identified by their command to participate in a human performance optimization program. Each workshop series shall each consist of six (6) total days of in-person instruction to be scheduled as three (3), 2-day events (“Foundation”, “Synthesis”, and “Capstone”) within separate 90-day periods. The identified individuals, hereafter known as Warrior F.I.T. mentees, will be provided a personalized fitness plan, nutrition plan & mental performance optimization plan within seven (7) days of initial assessment and screening. Each Warrior F.I.T. mentee will be provided unlimited access to an established online learning portal and virtual application and can consult with SMEs through the online portal/virtual application, via on-site support from the Lead Human Performance Integrator, Performance Nutrition Coach and Injury Prevention and Recovery Coach, as well as phone, electronic mail, or drop-in instruction.

5.4.2 The contractor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .