This pre-solicitation notice provides information for a lowest price technically acceptable (LPTA) request for proposal (RFP) for lock upgrade services at a dormitory building at Joint Base San Antonio Fort Sam Houston. The RFP will require the delivery and installation of replacement locking mechanisms including electronic strikes and card readers with smart card access for 658 doors across four floors of dormitory rooms, hallways and stairwells. Offerors must submit proposals by August 23, 2021. The Air Force will award a 100% small business set-aside contract for the non-personal services. The solicitation will be issued on or around August 9, 2021 through the System for Award Management (SAM) website. A performance work statement, wage determination, and salient characteristics are attached for reference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 WD 2015-5253 Revision 14.pdf | ||
| Attachment 3 Salient Characteristics.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
Dorm Room Replacement Locks JBSA – Fort Sam Houston, Bldg. 1475
29 June 2021
1. DESCRIPTION OF SERVICES / GENERAL INFORMATION. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to accomplish the work required within this Performance Work Statement (PWS) for the delivery and installation of replacement locking mechanisms (electronic strikes and card readers) with smart card access to hallways, stairwells and dorm rooms at Joint Base San Antonio Fort Sam Houston, Building 1475 (hereby noted as B1475). The contractor shall ensure the locking system and smart cards are properly delivered and installed based on commercial industry standards.
1.1 DESCRIPTION OF SERVICES. The contractor shall perform the installation of new electronic strikes and smart card readers to the existing doors to provide access and maintain security of the hallways, stairwells, and dorm rooms for B1475. The building layout is comprised of four (4) floors with 136 dormitory room doors on the first floor, 152 on the 2nd floor, 156 on the 3rd floor, 156 on the 4th floor, and 58 hallway and stairwell doors located throughout the building. The new electronic strikes and smart card readers shall be hard wired to a power supply with a minimum 4-hour battery backup. Batteries shall not be used to maintain the locking mechanisms as part of everyday use. The contractor shall provide a stand-alone computer to operate as an offline control system and to program smart cards. In addition, the control system will have a backup power in case of power failure. Access to the computer shall be by a programmed smart card. The equipment required shall be sufficient for the installation and control of the 658 doors in the building.
1.1.1 Contractor shall provide new smart cards (2000 each) for room and area access. The card readers must be programmable to allow different smart cards to be used. The overall system must allow up to three (3) smart cards at a time to access one (1) dormitory room.
1.1.2 The computer shall be installed with the necessary software to program and configure smart cards and card readers in order to operate the new door locking system. A computer and/or PDA equivalent shall be provided and utilized to program the smart cards/readers.
1.1.3 Before demolition, the contractor must verify new power requirement. The Contractor shall calculate the power requirements to operate the new 658 door locking system and confirm sufficient capacity is available and installed as required to power supplies and panels.
1.1.4 All materials and accessories, including necessary controllers, power supplies and power panels, shall be installed in accordance with industry standards and manufacturer's recommendations.
2. GENERAL INFORMATION.
2.1 DEMOLITION.
2.1.1 The contractor shall only demolish the same number of new locking mechanisms that can be installed and make operational on the same day.
2.1.2 The two locking systems must be operational at the same time until the new locking system is complete.
2.1.3 Demolition shall follow applicable federal, state, local and Joint Base San Antonio (JBSA) codes and requirements. The Government has determined that no Hazmat exists in B1475 per letter dated 30 March 2012. It is incumbent upon the contractor to properly inspect and test for hazardous material in accordance with section 01 57 20 Environmental Protection.
2.1.4 Contractor shall remove old door strike plates that are currently on all doors.
2.1.5 Contractor shall be responsible for disposal of any demolished material. Contractor shall be responsible for furnishing containers for disposal.
2.2 NEW WORK. All work shall be performed in strict accordance with all applicable building codes, regulations, ordinances and design and construction standards, whether included or referenced to complete an acceptable and fully functional door locking system in B1475 on JBSA FSH.
2.2.1 Before work is started, the contractor shall arrange with the COR and Facility Manager a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
2.2.2 Work consists of removing existing strike plates and installing new electronic door strikes (HES 1006 - brand name or equal) and card readers (HID Mini R10 - brand name or equal) in each of the dorm rooms, which shall be hard wired to a new power supply.
2.2.3 The Contractor shall provide and install the new electronic strikes and card readers on all dorm room frames in B1475. No batteries shall be used to individually supply the power for the readers or the door strikes. In addition to the strikes and readers, the contractor shall provide and install sufficient Uninterrupted Power Supply (UPS) back-ups in case of disruption of electrical service. Contractor shall provide all associated hardware and software to program the individual doors. Contractor shall field verify the existing tabs and determine if new tabs need to be installed for functionality of the new locks.
2.2.4 The Contractor shall present to both the Contracting Officer (CO) and Contracting Officer Representative (COR) a remedy to correct any deficiency found during installation such as misalignments, oversized holes, frame cutout discrepancies, etc. and offer corrective actions.
2.2.5 The Contractor shall use existing doors and door handles.
2.2.6 All Electrical and Communication wiring shall be installed to meet all local, state and federal codes in accordance with but not limited to National Electrical Safety Code (IEEE C2), Enclosures for Electrical Equipment (NEMA 250), and National Fire Protection Association- National Electric Code (NFPA 70). No cabling, wiring, or conduit is to be exposed in the hallways and shall be concealed in the plenum and in walls with material rated for respective spaces.
2.2.7 Contractor shall be responsible for protecting doors and doorframes during the removal and installation of the electronic strikes and card readers. Damage as a result of Contractor negligence shall be corrected by the Contractor at no additional cost to the government.
2.2.8 All affected dorm rooms must be operational at the end of each day. At no time shall the access control system be inactive outside of normal duty hours.
2.2.9 Compliance with the following is Mandatory; NFPA LSC 101 (fire code), Unified Facilities Criteria for Fire Protection Engineering 3-600-01 and other applicable DOD directives do not allow for door locking devices to be tied into the fire alarm system. At no time shall doors be locked from the egress side/within the path of egress - Comply IAW AFI 32-10141, UFC 3-600-01 and NFPA
101, A.7.2.1.6, Free egress shall be available at all times - IAW NFPA 101, 7.2.1.5.3 Locks, if provided, shall not require the use of a key, a tool, or special knowledge or effort for operation from the egress side. A.7.2.1.6. None of the special locking arrangements addressed in 7.2.1.6 are intended to allow credentialed egress, request to exit, or similar provisions, where an occupant cannot leave the building without swiping a card through a reader, or require additional knowledge to operate wall mounted push buttons, latches, motion sensors, etc. Free Egress Shall Be Available at all times.
2.2.10 Contractor is to be responsible for any recertification of fire door for work that is outside of the permitted modifications in NFPA 80 to complete installation of locks per manufactures best practices.
2.3 BASE ACCESS
2.3.1 HOURS OF OPERATION. Performance of work shall be during normal duty hours between 7:30 AM and 3:30 PM (0730-1530), Monday through Friday unless otherwise requested in writing and approved by the Contracting Officer.
2.3.2 HOLIDAYS OBSERVED. The contractor is not required to provide scheduled service on the following holidays:
New Year’s Day January 1st Martin Luther King’s Birthday 3rd Monday in January President’s Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth National Independence Day June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
Note: Any of the above holidays falling on a Saturday will be observed by the government on the preceding Friday. Holidays falling on Sunday will be observed by the government on the following Monday.
2.3.3 SECURITY REQUIREMENTS. All contractors shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation.
2.3.3.1 Base/Installation Access Requirements. Criminal History Checks will be conducted on all prime/sub-contractor employees requiring base access. The contractor hall provide the COR a current list of employees needing access within 5-7 Working days after receiving award or Notice to Award. The list shall include [Employee’s name, Date of Birth, Country of Birth, and State driver’s license/state ID number and state of issue.] Notifications of contractor employee additions and deletions shall be provided with the same information listed above and within 5 working days. Within 10 business days after the receipt of the list, the Government will notify the contractor that installation access passes are available for those employees clearing the criminal history check. The duration of any pass issued will not exceed one year or the duration of the contract, whichever is shorter.
2.3.3.2 Upon termination, completion, or expiration of the contract, the contractor must ensure that all base pass identification passes issued to his employees or to any of his sub-contractor employees are returned to the appropriate issuing office.
2.3.3.3 The contractor shall be responsible for coordination of an escort, if applicable, through any controlled areas through the assigned Government Acceptor (Facility Manager).
3.0 DELIVERABLES. The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. It must specify the areas to be inspected on a scheduled and unscheduled basis and how often inspections shall be accomplished. This Quality Control Plan (QCP) shall be included in the technical proposal.
3.1 Contractor shall be responsible for providing shop drawings and product schematics on work completed and accepted by the Government upon project completion. Final shop and schematic drawings of the new system will be required at end of contract in digital format (CAD and PDF).
3.2 Contractor shall provide training to facility managers and Operations technicians in programming and operation of new system.
3.2.1 Training manual and video to be provided to Government upon completion of work.
3.2.2 The initial training needs to be provided when the first set of dorm room locks are in place and operational.
3.3 The contractor shall provide a proposed layout of the new system for government approval after award.
4.0 PROJECT MANAGEMENT. The Contractor shall identify and provide a single point of contact (POC) for overall management and supervision during install periods. The Contractor shall contact the government-designated points of contact for coordination as noted in the awarded contract at least 72 hours prior to delivery. All pertinent communications should be written and or confirmed in writing.
5.0 CLEAN UP. The contractor shall clean up all work areas daily and dispose of waste materials and or rubbish in accordance with all applicable federal, state, and local regulations, standards, codes, and laws. Do not dispose of or discard recyclables, packing materials or trash in any recycling or trash containers or dumpsters located on the installation. It is the Contractor’s responsibility to ensure trash and debris is disposed of properly and off sight.
6.0 REGULATIONS. The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, Department of Defense, Air Force and base requirements and instructions required.
7.0 QUALITY CONTROL. The contractor shall be responsible for quality control for all work accomplished during the performance of the task. The contractor shall provide and maintain a Quality Control Plan (QPC), acceptable to the government, which ensures the requirements in this PWS are met. The QCP shall be included in the technical proposal. As a minimum, the contractor shall develop quality control procedures that address the areas identified in section 16, Service Summary.
7.1 QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance by appointing a Contracting Officer Representative (COR)(s) to monitor performance to ensure services are received. The COR will evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP) for this requirement. Contractor re-performance shall be done at no additional cost to the government.
7.2 INSPECTION AND ACCEPTANCE. The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all relevant materials, finishes, equipment, and systems shall be fully operational at the completion of work for this project. A final inspection of completed work will be conducted by the COR. All discrepancies identified during inspections shall be corrected prior to final acceptance.
8.0 CONTRACTOR’S WARRANTY. The contractor shall guarantee all materials and workmanship for a period of one year from the date of final acceptance. The contractor shall respond within 48 hours of being notified for all warranty calls. Correction of all defects under this warranty shall be paid at the expense of the contractor.
9.0 WORKMANSHIP. The Contractor shall perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with the prevailing industry standards.
10.0 STORAGE AND PARKING.
10.1 Contractor storage will not be provided and is not required for this project. Contractor shall be responsible for removing all unused product on a daily basis.
10.2 Parking shall be in the vicinity of the jobsite.
11.0 OCCUPANCY OF PREMISES. The building will be occupied during performance of work this contract. Occupancy notifications will be posted in a prominent location in the work area.
12.0 ENVIRONMENTAL, SAFETY AND OCCUPATIONAL HEALTH. The contractor is solely responsible for compliance with federal, state, and local laws, the Occupational, Safety and Health Act (public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all sub-contractor employees. The government shall assume no liability or responsibility for the contractor’s compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. In addition, the contractor is required to flow down the safety requirement/specification to all sub-contractors.
13.0 PROTECTION. The contractor shall take precautions to prevent damage to government property.
The contractor shall repair or replace damaged items at no additional cost to the government.
14.0 CONDUCT REQUIREMENTS.
14.1 Smoking in AF Facilities. Contractors are advised that the AF has placed restrictions on the smoking of tobacco products in AF facilities. AFI 40-102, Tobacco Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.
14.2 Joint Base San Antonio (JBSA) Traffic Code. All applicable Traffic Codes will be enforced and apply to all personnel operating vehicles on a JBSA installation. The governing instruction for all Traffic Codes is AFI 31-218(I) and AFMAN 31-116.
14.3 Cell Phone Usage. Contractors are advised that DoD Instruction (DoDI) 6055.04 prohibits cellular telephone usage when approaching, entering or exiting any installation gate. Cell phone usage by drivers on installations is prohibited in moving vehicles unless used with a hands-free device. The installation
Security Forces Squadron (SFS) is strictly enforcing this regulation. Those found in violation of this regulation are subject to be ticketed.
14.4 Base Fire Prevention Program. The contractor will be required to comply with the applicable Fire Prevention Program for JBSA. The applicable directive is AFI 91-203. AFI 91-203 is available at the AF E-Publishing site at http://www.e-publishing.af.mil.
14.5 The contractor shall ensure that its employees conduct themselves in a professional manner while on the installation and refrain from disruptive, offensive, or otherwise improper behavior that undermines order and discipline. The contracting officer may direct the contractor to remove from performance of this contract on this installation any contractor employee engaging in such misconduct.
14.6 Physical Security. The contractor shall comply with Force Protection Condition (FPCON) procedures, Random Antiterrorism Measures (RAMS) and local search/identification requirements. The contractor shall safeguard all government property, including controlled forms, provided for contractor use. At the close of each work period, government training equipment, ground aerospace vehicles, facilities, support equipment, and other valuable materials shall be secured.
14.7 Key Control. The contractor shall safeguard all keys issued by the government and ensure they are used only by authorized contractor personnel. The contractor shall not duplicate issued keys and shall report lost keys to the Contracting Officer immediately. The contractor will be charged for lost keys, re-keying, and lock replacement as applicable.
14.8 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on JBSA.
14.9 The contractor shall not use Government facilities or other Government property for personal use or other business not related to this contract.
15. OTHER
15.1 SPECIAL QUALIFICATIONS. The contractor shall be licensed or certified by the equipment manufacturer/dealer/distributer to perform installation of the door locking system. The contractor shall provide proof to COR or the CO upon request.
15.2 RECORDS MANAGEMENT. The Contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF records management procedures in Air Force Instruction (AFI) 33 - 322, Records Management Program, paragraph 10 and Air Force Manual (AFMAN) 33-363.
15.3 AIR FORCE ANTITERRORISM (AT) PROGRAM
The AT program seeks to deter or limit the effects of terrorist acts against the AF by giving guidance on collecting and disseminating timely threat information, providing training to all AF members, developing comprehensive plans to deter and counter terrorist incidents, allocating funds and personnel and implementing AT measures. In accordance with AFI 10-245 paragraphs 2.18 and 2.25, DOD contractors and sub-contractor personnel shall be offered Level 1 - AT Awareness Training. AT Awareness Training may be accomplished by either a Level I - qualified instructor, or by completing the "Force Protection" computer based training (CBT) course on the Advanced Distributed Learning System (ADLS) https://golearn.csd.disa.mil/kc/login/login.asp or at https://jkodirect.jten.mil for individuals without access to NIPR, possessing a CAC card, nor enrolled in DEERS. The contracting officer’s representative will monitor compliance with the training.
http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/ https://golearn.csd.disa.mil/kc/login/login.asp https://jkodirect.jten.mil/
16. SERVICE SUMMARY.
Performance Objective PWS Paragraph
Performance Threshold
SS-1
Replace existing door strike with new electronic strike (HES 1006 – brand name or equal)
2.2.2
No more than 2 valid defects per month.
SS-2
Install Card Readers (HID Mini R10 – brand name or equal)
2.2.2 No more than 1 valid defect per
month.
SS-3
Doors contractor services must be operational at the end of the day.
2.1.1, 2.2.8 No more than 0 valid defects per day.
SS-4
Maintain existing fire rating
7.2 No more than 1 valid defect per
month.
SS-5
Quality Control
7.0, 7.1, 7.2 No more than 2 valid defects per month.
SS-6
Debris and Site Cleanup
5.0 No more than 1 valid defect per
month
17. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will furnish electronic As-Built drawings after contract award to the contractor. It is the contractor's responsibility to field verify all existing conditions prior to award.
18. APPENDICES
APPENDIX A. Existing Conditions Photographs
APPENDIX B. Building Floor Plan layouts
APPENDIX A.
Existing conditions
Figure 1 Existing Door Lock and Strike
Figure 2 Existing Door Strike
APPENDIX B.
Building Floor Plan Layout
Figure 3 First Floor Overall Plan