Attachment 1 DRAWINGS FULL SET.pdf

PDF 12 MB Posted

Attached to
Tanker Base Ramp Improvement Project Federal contract opportunity
Solicitation number
12445221B0001
Issued by
Department of Agriculture Forest Service

About this file

This document outlines a federal contract opportunity for a Tanker Base Ramp Improvement Project. The Base Bid includes expanding aircraft parking aprons with 4,770 square yards of concrete pavement and 6,000 square yards of asphalt, along with associated removal of existing pavement, storm sewer installation, and pavement markings. The Base Bid also includes widening an asphalt access road with 90 square yards of pavement, markings, signage, and inductive loop detector modification. Bid Option 1 adds 2,820 square yards of asphalt apron expansion with markings and tie-downs. The project has an estimated value between $1,000,000 and $5,000,000. It will be carried out at Lake City Gateway Airport in Lake City, Florida. The solicitation is designated for small businesses with less than $39.5 million in annual revenue, using NAICS code 237310 for highway, street, and bridge construction. The opening date for bids is included in the Invitation for Bid, with full plans and specifications available online only.

View the file

Other files for this federal contract opportunity

Other files attached to Tanker Base Ramp Improvement Project, newest first.
File Type Posted
Abstract 12445221B0001.pdf PDF
Amendment 0003 12445221B0001.pdf PDF
Amendment 0002 12445221B0001.pdf PDF
Attachment 5 Schedule of Items.docx DOCX document
Amendment 0001 12445221B0001.pdf PDF
Attachment 4 Wage Determination FL20200140-1-01-2021.pdf PDF
Invitation for Bid 12445221B0001.pdf PDF
Attachment 3 Technical Specifications.pdf PDF
Attachment 2 General Provisions.pdf PDF
Attachment A Buy American and Hazardous Materials.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DRAWINGS FOR:

USDA FOREST SERVICE

CONTRACT NO. 1243N919C0001

BID SET

VICINITY MAP

LOCATION MAP

N

N

U.S FOREST SERVICE AT

LAKE CITY GATEWAY

AIRPORT (LCQ)

PAVEMENT EXPANSION

AIR TANKER BASE

PASSERO ASSOCIATES

PROJECT NUMBER 20192861.0001

4730 Casa Cola Way, Suite 200

St. Augustine, FL 32095 www.Passero.com

LAKE CITY, FLORIDA 32025

475 SE COUNTY ROAD 245

JUNE 2020

PASSERO ASSOCIATES

engineering architecture

Phone: (904) 757-6106

Certificate of Authorization # 3428

DRAWING TITLEDRAWING NO.

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

MEXICO

AutoCAD SHX Text

OF

AutoCAD SHX Text

GULF

AutoCAD SHX Text

KEY WEST

AutoCAD SHX Text

TALLAHASSEE

AutoCAD SHX Text

JACKSONVILLE

AutoCAD SHX Text

ORLANDO

AutoCAD SHX Text

TAMPA

AutoCAD SHX Text

FORT

AutoCAD SHX Text

PALM

AutoCAD SHX Text

FT.

AutoCAD SHX Text

MIAMI

AutoCAD SHX Text

MYERS

AutoCAD SHX Text

WEST

AutoCAD SHX Text

BEACH

AutoCAD SHX Text

LAUDERDALE

AutoCAD SHX Text

ALABAMA

AutoCAD SHX Text

GEORGIA

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

GAINESVILLE

AutoCAD SHX Text

PALATKA

AutoCAD SHX Text

DAYTONA BEACH

AutoCAD SHX Text

ATLANTIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

LAKE CITY

AutoCAD SHX Text

ST. AUGUSTINE

AutoCAD SHX Text

ST. AUGUSTINE

AutoCAD SHX Text

PROJECT LOCATION LAKE CITY GATEWAY AIRPORT

AutoCAD SHX Text

USFS AIR TANKER BASE LAKE CITY GATEWAY AIRPORT

AutoCAD SHX Text

INDEX OF SHEETS

AutoCAD SHX Text COVER SHEET ABBREVIATIONS & SUMMARY OF QUANTITIES SAFETY, SECURITY & GENERAL NOTES GENERAL PLAN CONSTRUCTION SAFETY & PHASING PLAN EXISTING CONDITIONS & SURVEY CONTROL PLAN DEMOLITION PLAN GEOMETRY AND JOINT LAYOUT PLAN ACCESS ROAD WIDENING SITE PLAN TYPICAL SECTIONS AND PAVEMENT DETAILS GRADING, DRAINAGE AND EROSION CONTROL PLAN PAVEMENT ELEVATION PLAN DRAINAGE DETAILS PAVEMENT MARKING, LIGHTING & SIGNAGE PLAN PAVEMENT MARKING, LIGHTING & SIGNAGE DETAILS STORMWATER POLLUTION PREVENTION PLAN

AutoCAD SHX Text G1-1 G1-2 G1-3 G1-4 G2-1 G3-1 THRU G3-3 C1-1 C2-1 C2-2 C3-1 THRU C3-2 C4-1 THRU C4-3 C4-4 C4-5 C5-1 C5-2 C6-1 THRU C6-4

DIAMETERDIA

DR

MONUMENT LINE

PAV'T

ML

P PARCEL

PAVEMENT

HORIZONTAL CONTROL LINE

DRIVEWAY / DRAINAGE STRUCTURE WITH No. e.g.

CENTER OF CORRECTION

EXTERNAL DISTANCE / EASTING

EDGE OF PAVEMENT

DUCTILE IRON PIPE

HCL

LP / L POLE

MH

MON

MAX

LP

HYD

IP

INV

HORIZ

HP

MANHOLE

MONUMENT

MAXIMUM

LOW POINT

LIGHT POLE

HIGH POINT

HYDRANT

INVERT

IRON PIPE

HORIZONTAL

EP

G

GV

GR

EXIST / EX

FBO

EL / ELEV

e E

DR

DIP

GAS VALVE

GAS LINE

GRAVEL

EXISTING

FIXED BASED OPERATOR

ELEVATION

DEGREE OF CURVATURE

CORRUGATED METAL PIPE

BEGIN VERTICAL CURVE STATION

AS ORDERED BY THE ENGINEER

CB

DI

D

LC

CMP

LB

BVCS

BM

ASPH

BIT

CATCH BASIN

DROP INLET

CENTERLINE

DELTA

BASELINE

BITUMINOUS

BENCH MARK

ASPHALT

AOBE

ABND

ADJ

ABANDONED

ADJUST

AND

PULL BOX

POWER POLE

PROPOSED

PC

PB

PI

PK

PP

PROP

LP

PCC

SIGN

RAILROAD

RECORD

PVC

PVI

RCP

R

RE

(REC)

ROW

S

RR

PT

REINFORCED CONCRETE PIPE

RADIUS OF CURVE

POINT OF VERTICAL INTERSECTION

POINT OF VERTICAL CURVE

POINT OF TANGENCY

PROPERTY LINE

PK NAIL ( SURVEY MARKER )

POINT OF INTERSECTION

POINT OF CURVATURE

RESIDENT ENGINEER

RIGHT-OF-WAY

PORTLAND CONCRETE CEMENT / POINT OF COMPOUND CURVE

STANDARD

STATION

SIDEWALK

TRANSITION

TYPICAL

TOP OF GRATE

STA

T

SW

STD

TL

TGL

TYP

USC&GS

TRANS

TG

VALVE

VITRIFIED TILE

VERTICAL

WATER LINE

WATER VALVE

V

VC

VCP

VT

VTP

VERT

W

WV

XVCP

TANGENT LENGTH

THEORETICAL GRADE LINE

TELEPHONE LINE

VITRIFIED TILE PIPE

VITRIFIED CLAY PIPE

VERTICAL CURVE

UNITED STATES COASTAL AND GEODETIC SURVEY

EXTRA STRENGTH VITRIFIED CLAY PIPE

SP SPECIAL

ABBREVIATIONS

BEGIN VERTICAL CURVE ELEVATIONBVCE

CONTROL POINTCP

END VERTICAL CURVE STATIONEVCS

FIELD INLETFI

LINEAR FEETLF

NOW OR FORMERLYN/F

OVERHEAD ELECTRICOHE

RUNWAY OBJECT FREE AREAROFA

RPZ RUNWAY PROTECTION ZONE

RUNWAY SAFETY AREARSA

RUNWAYRW

SAN SANITARY

STORYSTY

TAXIWAYTW

CORRUGATED METAL PIPE (ARCH)CMPA

SMOOTH FLOW CORRUGATED METAL PIPE (ARCH)SFCMPA

PAPI PRECISION APPROACH PATH INDICATOR

RUNWAY END IDENTIFICATION LIGHTSREIL

MIRL MEDIUM INTENSITY RUNWAY LIGHT

EVCE END VERTICAL CURVE ELEVATION

TAXIWAY SAFETY AREATSA

GVGI GENERIC VISUAL GLIDESLOPE INDICATOR

NOT IN CONTRACTN.I.C.

ST. JOHNS RIVER WATER MANAGEMENT DISTRICTSJRWMD

FDOT FLORIDA DEPARTMENT OF TRANSPORTATION

CORRUGATED POLYETHYLENE PIPEC.P.P.

NORTHINGN

T/L TAXILANE

TAXIWAY OBJECT FREE AREATOFA

TAN TANGENT OF CURVE

MITL MEDIUM INTENSITY TAXIWAY LIGHT

HIRL HIGH INTENSITY RUNWAY LIGHT

HDPE HIGH DENSITY POLYETHYLENE PIPE

UNLESS NOTED OTHERWISEU.N.O.

BID QUANTITIES

Pavement Expansion - BASE BID

PAY ITEM NO. DESCRIPTION QUANTITY/ UNIT

C-100-14.1 CONTRACTOR QUALITY CONTROL PROGRAM 1 LS

C-102-5.1 TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION

CONTROL 1 LS

C-105-6.1 MOBILIZATION 1 LS

C-106-4.1 MAINTENANCE & PROTECTION OF TRAFFIC 1 LS

C-108-8.1 PROJECT SURVEY AND STAKEOUT 1 LS

C-108-8.2 AS-BUILT DRAWINGS 1 LS

P-101-5.1 PAVEMENT REMOVAL, FULL DEPTH INCLUDING BASE ROCK 3,190 SY

P-101-5.2 PAVEMENT REMOVAL, 4-INCH BITUMINOUS LAYER 300 SY

P-101-5.3 ELECTRICAL/LIGHTING DEMOLITION, COMPLETE 1 LS

P-152-5.1 TOPSOIL STRIPPING EXCAVATION 9,840 SY

P-152-5.2

UNCLASSIFIED EXCAVATION (PROVIDED QUANTITY IS BASED ON EXISTING

GROUND SURFACE PRIOR TO TOPSOIL STRIPPING) 1,600 CY

P-152-5.3

EMBANKMENT IN PLACE (PROVIDED QUANTITY ACCOUNTS FOR 6 INCHES

TOPSOIL STRIPPING PRIOR TO EMBANKMENT PLACEMENT) 1,540 CY

P-160-8.1 12-INCH SUBGRADE STABILIZATION 6,580 SY

P-219-6.1

4-INCH RECYCLED CONCRETE AGGREGATE BASE COURSE (PCC BASE

COURSE) 4,770 SY

P-219-6.2

6-INCH RECYCLED CONCRETE AGGREGATE BASE COURSE (ACCESS RD.

WIDENING BASE COURSE) 90 SY

P-219-6.3

8-INCH RECYCLED CONCRETE AGGREGATE BASE COURSE (STANDARD

AIRCRAFT ASPHALT BASE COURSE) 3,160 SY

P-219-6.4

12-INCH RECYCLED CONCRETE AGGREGATE BASE COURSE

(HEAVY-DUTY AIRCRAFT ASPHALT BASE COURSE) 3,340 SY

P-401-8.1

2-INCH ASPHALT SURFACE COURSE, 3/4" MAX. AGGREGATE (AIRCRAFT

PAVEMENT) 770 TON

P-401-8.2

2-INCH ASPHALT BASE COURSE, 1" MAX. AGGREGATE (AIRCRAFT

PAVEMENT) 770 TON

P-409-5.1

4-INCH FDOT SP-12.5MM, TRAFFIC LEVEL B, SURFACE COURSE (ACCESS

RD. WIDENING) 20 TON

P-501-8.1 14-INCH PORTLAND CEMENT CONCRETE PAVEMENT 4,770 SY

P-602-5.1 BITUMINOUS PRIME COAT 1,968 GAL

P-603-5.1 BITUMINOUS TACK COAT 460 GAL

P-620-5.1 PERMANENT RUNWAY & TAXIWAY MARKING 2,000 SF

P-620-5.2 BLACK OUTLINE RUNWAY & TAXIWAY MARKING 4,000 SF

P-700-4.1 ROADWAY SIGNS 1 EA

P-711-4.1 24-INCH WIDE WHITE THERMOPLASTIC STOP BAR 30 LF

P-720-4.1 INDUCTIVE LOOP DETECTOR MODIFICATION 1 LS

D-701-5.1 19 x 30 INCH CLASS IV ELLIPTICAL RCP 292 LF

D-701-5.2 24 x 38 INCH CLASS IV ELLIPTICAL RCP 280 LF

D-751-5.1 AIRCRAFT RATED STORM INLET, 4' X 4' INNER DIMENSIONS 2 EA

D-751-5.2 AIRCRAFT RATED STORM INLET, 4.5' X 4.5' INNER DIMENSIONS 1 EA

D-751-5.3 FDOT U-TYPE ENDWALL, MODIFIED, 24 X 38 INCH ERCP, 6:1 SLOPE, WITH

BAFFLES 1 EA

T-901-5.1 SEEDING 1 AC

T-904-5.1 SODDING 2,700 SY

T-905-5.1 TOPSOILING 790 CY

L-108-4.1 NO. 8 AWG, 5KV, L-824C CABLE, INSTALLED IN CONDUIT 60 LF

L-108-4.2 BARE COUTERPOISE WIRE, INSTALLED IN TRENCH 30 LF

L-110-5.1 ELECTRICAL CONDUIT, 2-INCH PVC SCH 40, INSTALLED IN TRENCH 30 LF

L-125-5.1 RELOCATE EXISTING SIGN ON NEW CONCRETE BASE 1 EA

OD-5.1 OWNER DIRECTED MATERIAL TESTING 1 FIXED

Pavement Expansion - BID ADDITIVE 1

PAY ITEM NO. DESCRIPTION QUANTITY/ UNIT

P-152-5.1 TOPSOIL STRIPPING EXCAVATION 3,600 SY

P-152-5.2

UNCLASSIFIED EXCAVATION (PROVIDED QUANTITY IS BASED ON EXISTING

GROUND SURFACE PRIOR TO TOPSOIL STRIPPING) 40 CY

P-152-5.3

EMBANKMENT IN PLACE (PROVIDED QUANTITY ACCOUNTS FOR 6 INCHES

TOPSOIL STRIPPING PRIOR TO EMBANKMENT PLACEMENT) 620 CY

P-160-8.1 12-INCH SUBGRADE STABILIZATION 2,820 SY

P-219-5.1

8-INCH RECYCLED CONCRETE AGGREGATE BASE COURSE (STANDARD

AIRCRAFT ASPHALT BASE COURSE) 2,820 SY

P-401-8.1

2-INCH ASPHALT SURFACE COURSE, 3/4" MAX. AGGREGATE (AIRCRAFT

PAVEMENT) 320 TON

P-401-8.2

2-INCH ASPHALT BASE COURSE, 1" MAX. AGGREGATE (AIRCRAFT

PAVEMENT) 320 TON

P-602-5.1 BITUMINOUS PRIME COAT 803 GAL

P-603-5.1 BITUMINOUS TACK COAT 187 GAL

T-904-5.1 SODDING 1,100 SY

T-905-5.1 TOPSOILING 100 CY

A-300-5.1 AIRCRAFT TIE-DOWN ANCHORS 6 EA

Project No.

Date

Drawing No.

4730 Casa Cola Way, Suite 200

Saint Augustine, FL 32095

Town/City:

County: State:

Designed by

Project Manager

Phone: (904) 757-6106 www.passero.com

Passero Associates

Client:

Certificate of Authorization # 3428

Stamp:

Matt Singletary, P.E.

Matt Singletary, P.E.

U.S. Forest Service

Lake City

Lake City

Columbia Florida

20192861.0001

June 2020

Pavement Expansion

No.

Revisions

THESE PLANS ARE COPYRIGHT PROTECTED

ADMINISTRATIVE CODE 61G15-27.001 AND FLORIDA STATUTE 471.033(1).

UNAUTHORIZED USE OF THIS DRAWING IS IN VIOLATION OF FLORIDA

c

Date By Description

Client:

U.S. Forest Service

Air Tanker Base at LCQ

475 SE County Rd. 245

Lake City, Florida 32025

Architecture

PASSERO ASSOCIATES

Engineering www.passero.com

BID SET

Air Tanker Base

Designed by Bruce Bradley, EI

July 13, 2020

ABBREVIATIONS

& SUMMARY OF

QUANTITIES

G1-2

SAFETY NOTES:

1. AIRPORT OPERATIONS - THE CONTRACTOR SHALL ACQUAINT ALL SUPERVISORS AND EMPLOYEES WITH THE AIRPORT ACTIVITIES AND OPERATIONS THAT ARE INHERENT AT THE AIRPORT AND SHALL CONDUCT ALL CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND

GUIDELINES ON SAFETY SPECIFIED IN NOTES 10 & 13 BELOW.

2. VEHICLE IDENTIFICATION - ALL CONTRACTOR CONSTRUCTION EQUIPMENT AUTHORIZED TO OPERATE ON THE AIRPORT SHALL DISPLAY IN FULL VIEW ABOVE THE VEHICLE A 3' X 3' OR LARGER ORANGE AND WHITE CHECKERED FLAG, EACH CHECK BEING 1' SQUARE. ALL VEHICLES OPERATING IN THE ACTIVE AIRPORT OPERATIONS AREA DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING/ROTATING AMBER (YELLOW) DOME-TYPE LIGHT MOUNTED ON TOP OF THE VEHICLE AND OF SUCH INTENSITY TO CONFORM TO

LOCAL CODES FOR MAINTENANCE AND EMERGENCY VEHICLES.

3. RUNWAY/TAXIWAY CLOSURES - PLACE TEMPORARY LIGHTED CLOSED RUNWAY "X" OVER RUNWAY NUMERAL FOR ANY RUNWAY CLOSURE. IF "LAYDOWN X"s ARE ALLOWED FOR RUNWAY OR TAXIWAY CLOSURES, THEY SHALL MEET THE REQUIREMENTS OF THE MAINTENANCE & PROTECTION OF TRAFFIC TECHNICAL SPECIFICATION (COORDINATE WITH THE AIRPORT OPERATOR). SEE PHASING & SAFETY PLAN & THE MAINTENANCE &

PROTECTION OF TRAFFIC TECHNICAL SPECIFICATION FOR FURTHER INFORMATION.

4. OPEN TRENCHES AND CONSTRUCTION ACTIVITY - ANY CONSTRUCTION ACTIVITY OR OPEN TRENCHES WITHIN THE RUNWAY SAFETY AREA (RSA) (250' OF RUNWAY 10-28 CENTERLINE, 75' OF RUNWAY 5-23 CENTERLINE, OR 60' FROM AN ACTIVE TAXIWAY CENTERLINE) WILL REQUIRE CLOSURE OF THE AFFECTED RUNWAY OR TAXIWAY, UNLESS OTHERWISE APPROVED BY AIRPORT MANAGER AND THE OWNER'S REPRESENTATIVE. NO OPEN DITCHES, EQUIPMENT, MATERIALS OR MATERIAL STOCKPILES WILL BE PERMITTED WITHIN THE RUNWAY 10-28 OR 5-23 OBJECT FREE AREA (ROFA), 400' AND 250' RESPECTIVELY FROM THE RUNWAY CENTERLINE, WHEN RUNWAY IS

OPEN. CLOSURES REQUIRE THE SAME PROVISIONS AS NOTE 3 ABOVE.

5. TRENCH MARKING - OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIALS LOCATED IN THE AIRPORT OPERATIONS AREA SHALL BE PROMINENTLY MARKED WITH FLAGS AND LIGHTED BY APPROVED LIGHT UNITS

DURING HOURS OF RESTRICTED VISIBILITY AND DARKNESS.

6. OPEN FLAME - OPEN FLAME, WELDING OR TORCH-CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE AND SAFETY PRECAUTIONS HAVE BEEN TAKEN AND THE PROCEDURE APPROVED BY FIRE INSPECTOR, AIRPORT MANAGER AND THE ENGINEER. NO DEBRIS BURNING IS ALLOWED.

7. STOCKPILE EROSION AND DUST CONTROL - STOCKPILED MATERIAL AND OPEN EXCAVATIONS SHALL BE TREATED IN SUCH A MANNER AS TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT BLAST OR WIND.

8. DEBRIS CONTROL - DEBRIS, WASTE AND LOOSE MATERIAL SHALL NOT BE ALLOWED ON ACTIVE AIRCRAFT MOVEMENT AREAS. IF OBSERVED TO BE ON ACTIVE AIRCRAFT MOVEMENT AREAS, THE MATERIAL WILL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE ENGINEER MAY DIRECT THAT DEBRIS PROBLEMS DURING CONSTRUCTION NOT CORRECTED BY THE CONTRACTOR BE CORRECTED BY OTHERS AT THE EXPENSE OF THE CONTRACTOR. NO OPEN TOP DUMPSTERS ARE ALLOWED IN THE PROJECT OR STAGING AREA. TRUCKS SHALL

COVER THE LOAD FOR ALL MOVEMENTS ON THE AIRPORT.

9. INSPECTION BY OPERATIONS - PRIOR TO OPENING FOR AIRCRAFT USE, THE CONTRACTOR SHALL ARRANGE FOR INSPECTION BY THE ENGINEER AND AIRPORT MANAGER ANY RUNWAY, TAXIWAY OR APRON THAT HAS BEEN CLOSED FOR WORK, OR THAT HAS BEEN USED FOR A CROSSING POINT OR HAUL ROUTE BY THE

CONTRACTOR.

10. SAFETY GUIDELINES:

150/5370-2 "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION"

150/5200-18 "AIRPORT SAFETY SELF-INSPECTION"

150/5210-5 "PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AIRPORT"

11. LIGHTED AIRPORT LOW PROFILE BARRICADES ARE REQUIRED AS NOTED ANYTIME THE CONTRACTOR IS

WORKING.

12. AT THE END OF THE WORK DAY, CONTRACTOR SHALL REMOVE ALL EQUIPMENT FROM WORK AREA BACK TO THE CONTRACTOR STAGING AREA OR TO SUCH OTHER LOCATIONS AS APPROVED BY THE ENGINEER.

13. IN COMPLIANCE WITH AC 150/5370-2G "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION," THE

CONTRACTOR' DESIGNATED PERSONNEL SHALL HAVE AND MONITOR A RADIO FOR TWO-WAY

COMMUNICATION WITH THE AIR TRAFFIC CONTROL TOWER AT ALL TIMES. THE LAKE CITY GATEWAY AIRPORT

RADIO GROUND FREQUENCY IS 121.9.

SECURITY NOTES:

1. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE AIRPORT AND WITH THE SECURITY REQUIREMENTS SPECIFIED HEREIN. THE CONTRACTOR SHALL DESIGNATE IN WRITING TO THE ENGINEER THE NAME OF HIS/HER "CONTRACTOR SECURITY OFFICER". THE CONTRACTOR SECURITY OFFICER SHALL REPRESENT

THE CONTRACTOR ON THE SECURITY REQUIREMENTS OF THE CONTRACT.

2. CONTRACTOR PERSONNEL SECURITY ORIENTATION - THE CONTRACTOR SECURITY OFFICER SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR PERSONNEL ON THESE REQUIREMENTS AND, FROM TIME TO TIME, OTHER SECURITY PROVISIONS ADOPTED BY THE ENGINEER OR OWNER. ALL NEW CONTRACTOR EMPLOYEES SHALL BE BRIEFED ON THESE REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.

3. ACCESS TO THE SITE - CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL NOT PERMIT ANY UNAUTHORIZED CONSTRUCTION PERSONNEL OR TRAFFIC ON THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE VARIOUS CONSTRUCTION AREAS ON THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE CLEANUP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS ROAD AS A RESULT OF HIS/HER CONSTRUCTION TRAFFIC. DIRECTIONAL SIGNING AT THE ACCESS GATE AND ALONG THE DELIVERY ROUTE TO

THE STORAGE AREA OR WORK SITE SHALL BE AS DIRECTED BY THE ENGINEER.

4. MATERIALS DELIVERY TO THE SITE - ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE SITE WILL USE THE ACCESS POINT AT THE CONTRACTOR'S STAGING SITE. THE CONTRACTOR SHALL PROVIDE ESCORT SERVICES

TO DIRECT DELIVERIES.

5. CONSTRUCTION AREA LIMITS - THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL ERECT AND MAINTAIN AROUND THE PERIMETER OF THESE AREAS SUITABLE FENCING, SIGNAGE AND WARNING DEVICES VISIBLE FOR BOTH DAY/NIGHT USE TO DELINEATE THE PERIMETER OF ALL SUCH

AREAS.

6. CONTRACTOR EMPLOYEE PERSONAL VEHICLES SHALL BE RESTRICTED TO THE CONTRACTOR'S STAGING AREA OR CONTRACTOR EMPLOYEE PARKING AREA AND ARE NOT ALLOWED ON THE AIRFIELD AT ANY TIME.

7. REQUIREMENTS FOR BADGING - NO BADGING REQUIRED

8. THE CONTRACTOR SHALL INSTALL A 3' X 3' SIGN AT THE CONSTRUCTION SITE ENTRANCE GATE THAT SAYS:

"THIS AREA IS A DESIGNATED CONSTRUCTION SITE AND ANYONE WHO TRESPASSES ON THIS PROPERTY COMMITS

A FELONY."

BARRICADE NOTES:

1. TYPICAL LIGHTED AIRPORT LOW PROFILE BARRICADES TO BE PLACED ALONG THE LIMITS OF THE PHASES OF WORK, AS SHOWN IN THESE PLANS, TO DELINEATE THE CONTRACTOR'S WORK AREAS (SEE DETAIL BELOW).

2. ALL BARRICADES SHALL BE CHECKED VISUALLY FOR SIGNS OF WEAR AND TEAR ON A WEEKLY BASIS AND SHALL BE REPAINTED WHEN DEEMED APPROPRIATE BY THE ENGINEER. THE CONDITIONS OF LIGHTING UNITS SHALL BE CHECKED DAILY. ALL LIGHT FIXTURES SHALL BE VERIFIED OPERATING BY THE CONTRACTOR ON A DAILY

BASIS BEFORE THE CONTRACTOR CEASES OPERATION FOR THE DAY.

3. ALL BARRICADES SHALL BE MOVED AT LEAST ONCE EACH WEEK AND THE CONTRACTOR SHALL SWEEP THE DEBRIS WHICH HAS ACCUMULATED AND REMOVE IT FROM THE SITE. THE BARRICADES SHALL THEN BE REPLACED

AT THE APPROPRIATE LOCATION.

4. BARRICADES SHALL BE SPACED 8' MAXIMUM, END TO END, OR AS DIRECTED BY THE ENGINEER.

CONTRACTOR'S SAFETY AND SECURITY REQUIREMENTS

1. UNDERGROUND UTILITY LAYOUT INFORMATION WAS COMPILED FROM AS-BUILT INFORMATION AND EXISTING RECORD PLANS AND IS OFFERED SOLELY FOR THE PURPOSE OF PROVIDING THE CONTRACTOR WITH DATA AVAILABLE TO THE ENGINEER. THE ACTUAL LOCATIONS IN THE FIELD MAY BE DIFFERENT FROM THAT SHOWN. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL UTILITIES AND AIRPORT CABLES IN FIELD PRIOR TO

CONSTRUCTION.

2. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES (SEE SUNSHINE STATE ONE CALL OF FLORIDA NOTE BELOW). IN THE EVENT OF DAMAGE TO EXISTING ELECTRICAL CABLES AND UTILITIES, THE ENGINEER AND AIRPORT MANAGER ARE TO BE NOTIFIED IMMEDIATELY AND THE CONTRACTOR SHALL REPAIR THE DAMAGE, AS DIRECTED BY THE ENGINEER, IMMEDIATELY AND AT THE CONTRACTOR'S EXPENSE. ALL DAMAGED CABLES, WILL BE REPLACED TO THE NEAREST LIGHTING FIXTURES. NO FIELD SPLICES WILL BE PERMITTED.

3. PROPERTY LINES, RIGHT-OF-WAY LINES, AND OWNER NAMES SHOWN ON THE PLANS ARE TAKEN FROM RECORD

MAPS.

4. CONTRACTOR'S ACCESS TO THE AIRPORT SHALL BE LIMITED TO THE ACCESS ROADS SHOWN ON THIS PLAN. THE CONTRACTOR, UPON COMPLETION OF THIS CONTRACT, SHALL REPAIR ANY DAMAGE TO ACCESS ROADS, GATES OR FENCES. ALL EXISTING PAVEMENTS AND DISTURBED GROUND SHALL BE RESTORED TO EXISTING CONDITION OR BETTER AT NO COST TO THE OWNER. ONLY ACTIVE AIRCRAFT PAVEMENTS MARKED ON THIS PLAN MAY BE USED FOR CONTRACTOR ACCESS. CONTRACTOR SHALL MINIMIZE PAVEMENT CROSSINGS AND SHALL CLEAN AND SWEEP ACTIVE AIRCRAFT PAVEMENT AS OFTEN AS NECESSARY, AS ORDERED BY OWNER / ENGINEER, TO KEEP PAVEMENT FREE OF DEBRIS. UTILIZED VEHICLE ROADS SHALL BE SWEPT AT THE END OF EACH WORKING DAY.

5. ALL AREAS DISTURBED SHALL BE FINE GRADED, TOPSOILED, AND SEEDED AND MULCHED. FINE GRADING SHALL BE SHAPED TO ALLOW SURFACE DRAINAGE AND CONFORM TO SMOOTH TRANSITIONS WITH SURROUNDING

GRADE.

6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS NECESSARY FOR THE PROJECT AND FOR

ACCESS TO THE SITE. COST FOR PERMITS TO BE PAID AS PART OF MOBILIZATION.

7. ALL COSTS ASSOCIATED WITH MAINTENANCE OF HAUL ROADS, ACCESS ROADS, RESTORATION OF SURFACES DISTURBED AND ALL BARRICADES AND TEMPORARY AIRPORT MARKINGS SHALL BE INCLUDED IN THE

MAINTENANCE & PROTECTION OF TRAFFIC TECHNICAL SPECIFICATION.

8. THE CONTRACTOR'S SPECIAL ATTENTION IS DIRECTED TO AC 150/5370-2G, OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION, AND THE CONTRACT SPECIAL PROVISIONS SECTION 80, AS THEY RELATE TO SAFETY

REQUIREMENTS AND AFFECT SEQUENCING OF WORK.

9. ANY IRON PINS, CONCRETE MONUMENTS, SURVEY MONUMENTS, OR OTHER ITEMS DEFINING PROPERTY LINES OR BASELINES WHICH ARE DISTURBED SHALL BE PROPERLY TIED AND ACCURATELY RESET UPON COMPLETION OF

WORK BY THE CONTRACTOR AT NO COST TO THE OWNER.

10. ELEVATIONS ARE BASED ON U.S.C. & G.S. DATUM. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING

THESE SITE BENCH MARKS OR MOVING THEM IF THEY ARE IN THE LINE OF CONSTRUCTION.

11. THE ENGINEER SHALL BE NOTIFIED IN WRITING OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK SHALL NOT VARY FROM THE PLANS WITHOUT THE EXPRESSED WRITTEN

APPROVAL OF THE ENGINEER.

12. SITE DRAINAGE SHALL BE MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION.

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFELY MAINTAINING THE CONSTRUCTION SITE THROUGHOUT

THE PERIOD OF CONSTRUCTION.

14. THE CONTRACTOR SHALL NOT LEAVE CONSTRUCTION EQUIPMENT RUNNING OR UNATTENDED.

15. THE CONTRACTOR SHALL KEEP EQUIPMENT NOT NECESSARY FOR THEIR OPERATIONS OUT OF THE EXISTING

TERMINAL AND AIR OPERATIONS AREA.

16. ALL WORK IS INCLUDED UNDER BASE BID UNLESS SPECIFICALLY LABELED OTHERWISE.

17. GATES WITH LOCKS WILL BE MAINTAINED AT CONTRACTOR ACCESS ROUTES. NO ACCESS WILL BE PERMITTED BY ANYONE OTHER THAN AIRPORT EMPLOYEES, CONTRACTOR'S EMPLOYEES AND EQUIPMENT INCLUDING

DELIVERIES, AND THE RESIDENT ENGINEER. NO OPEN GATES WILL BE LEFT UNATTENDED.

18. THE CONTRACTOR IS INSTRUCTED TO COOPERATE WITH ANY AND ALL OTHER CONTRACTORS PERFORMING

WORK ON THIS JOB SITE DURING THE PERFORMANCE OF THIS CONTRACT.

19. ALL WORK SHALL BE DONE IN STRICT COMPLIANCE WITH ALL APPLICABLE NATIONAL, STATE, AND LOCAL

CODES, STANDARDS, ORDINANCES, RULES, AND REGULATIONS.

20. THE ENGINEER RESERVES THE RIGHT TO EXAMINE ANY WORK DONE ON THIS PROJECT AT ANY TIME TO DETERMINE CONFORMANCE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS OF THIS PROJECT, AS

INTENDED AND INTERPRETED BY THE ENGINEER.

21. THE CONTRACTOR SHALL:

A. VERIFY ALL CONDITIONS IN THE FIELD FOUND PRIOR TO COMMENCEMENT OF WORK AND NOTIFY THE

ENGINEER, IN WRITING, OF ANY DISCREPANCIES.

B. EXAMINE THE SITE AND INCLUDE IN HIS WORK THE EFFECT OF ALL EXISTING CONDITIONS ON THE WORK.

C. PROVIDE AND INSTALL ALL MATERIALS AND PERFORM ALL WORK IN ACCORDANCE WITH RECOGNIZED

GOOD STANDARD PRACTICE.

D. HOLD THE OWNER HARMLESS AGAINST ANY AND ALL CLAIMS ARISING FROM WORK DONE BY THE

CONTRACTOR OR HIS SUB CONSULTANTS ON THE SITE.

22. CONTRACTOR PROJECT CLOSE-OUT REQUIREMENTS:

A. THE CONTRACTOR SHALL FULFILL THE REQUIREMENTS AND COMPLETE THE "CONTRACTOR'S PROJECT CLOSEOUT CHECKLIST", INCLUDED IN THE CONTRACT DOCUMENTS, BEFORE FINAL PAYMENT WILL BE ISSUED. THE FINAL 10% OWED TO THE CONTRACTOR (INCLUDING ANY RETAINAGE) WILL NOT BE RELEASED UNTIL ALL

CLOSEOUT CONTRACT DOCUMENTS HAVE BEEN SUBMITTED & APPROVED.

B. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS FOR THE

COMPLETION AND CLOSE-OUT OF THE PROJECT CONSTRUCTION.

C. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER OF RECORD WITH COPIES OF RECORD LOGS, TEST RESULTS, AND SUPPORTING DOCUMENTATION WITHIN 30 DAYS OF THE COMPLETION OF WORK.

D. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL GIVE THE OWNER AND THE ENGINEER OF RECORD A MINIMUM OF THREE (3) DAYS NOTICE PRIOR TO THE SCHEDULED SITE WALK THROUGH.

GENERAL NOTES

SUNSHINE STATE ONE CALL OF FLORIDA:

AT LEAST 48 HOURS BEFORE YOU DIG, EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS, CALL 811 WHEN CALLING FROM FLORIDA AND 1-800-432-4770 WHEN CALLING FROM OUTSIDE FLORIDA. A REPRESENTATIVE WILL COME TO YOUR PROPERTY

TO LOCATE AND MARK PUBLIC UTILITIES. THERE IS NO CHARGE FOR THIS SERVICE.

Project No.

Date

Drawing No.

4730 Casa Cola Way, Suite 200

Saint Augustine, FL 32095

Town/City:

County: State:

Designed by

Project Manager

Phone: (904) 757-6106 www.passero.com

Passero Associates

Client:

Certificate of Authorization # 3428

Stamp:

Matt Singletary, P.E.

Matt Singletary, P.E.

U.S. Forest Service

Lake City

Lake City

Columbia Florida

20192861.0001

June 2020

Pavement Expansion

No.

Revisions

THESE PLANS ARE COPYRIGHT PROTECTED

ADMINISTRATIVE CODE 61G15-27.001 AND FLORIDA STATUTE 471.033(1).

UNAUTHORIZED USE OF THIS DRAWING IS IN VIOLATION OF FLORIDA

c

Date By Description

Client:

U.S. Forest Service

Air Tanker Base at LCQ

475 SE County Rd. 245

Lake City, Florida 32025

Architecture

PASSERO ASSOCIATES

Engineering www.passero.com

BID SET

Air Tanker Base

Designed by Bruce Bradley, EI

July 13, 2020

G1-3

SAFETY,

SECURITY &

GENERAL

NOTES

NOTES:

1. DETAIL BASED ON MULTI-BARRIER* AIRPORT RUNWAY BARRICADE (AR10X96 HDPE SPN) WITH SOLAR POWERED LIGHT.

2. BARRICADES SHALL BE INSTALLED PER CONSTRUCTION PHASING DRAWINGS. TEMPORARY BARRICADES SHALL BE PAID UNDER ITEM M-101, MOBILIZATION. BARRICADES SHALL BE PLACED NO MORE THAN 8 FEET APART.

3. CONTRACTOR SHALL PLACE, MAINTAIN AND REMOVE BARRICADES AS REQUIRED. COST TO MOVE, SET AND MAINTAIN SHALL BE INCIDENTAL.

4. CONTRACTOR SHALL INSPECT AND MAINTAIN BARRICADES ON A DAILY BASIS (TYP.).

G1-3

AIRPORT LOW-PROFILE BARRICADE DETAIL

NOT TO SCALE

RED FLASHING SOLAR

LIGHTS

W/ BATTERIES

(TWO REQUIRED)

(TO BE *PROVIDED AND

MAINTAINED BY

CONTRACTOR)

10" X 10" X 96" LENGTH

ORANGE AND WHITE

HDPE BARRIER

12" X 12" BRIGHT ORANGE

NYLON FLAG WITH 12 GA.

DIAGONAL WIRE STIFFENER

TOP SHALL BE MAX. 24"

ABOVE PAVEMENT (ONE

FLAG PER UNIT)

BARRICADES TO BE FILLED

WITH WATER PROVIDED BY

THE CONTRACTOR (TYP.).

TA

6+

TA

7+

BID ADDITIVE (EAST OF RW 5/23)

10/28-91+00 10/28-92+00 10/28-93+00 10/28-94+00 10/28-95+00 10/28-96+00 10/28-97+00 10/28-98+00 10/28-99+00 10/28-100+00 10/28-101+00 10/28-102+00 10/28-103+00 10/28-104+00 10/28-105+00 10/28-106+00 10/28-107+00 10/28-108+00

B-51+00 B-52+00 B-53+00 B-54+00 B-55+00 B-56+00 B-57+00 B-58+00 B-59+00 B-60+00 B-61+00 B-62+00 B-63+00 B-64+00 B-65+00 B-66+00 B-67+00 B-68+00

6+

7+

8+

9+

+0

+0

+0

+0

+0

+0

+0

+0

+1

G1-4

GENERAL PLAN

Project No.

Date

Drawing No.

4730 Casa Cola Way, Suite 200

Saint Augustine, FL 32095

Town/City:

County: State:

Designed by

Project Manager

Phone: (904) 757-6106 www.passero.com

Passero Associates

Client:

Certificate of Authorization # 3428

Stamp:

Matt Singletary, P.E.

Matt Singletary, P.E.

U.S. Forest Service

Lake City

Lake City

Columbia Florida

20192861.0001

June 2020

Pavement Expansion

No.

Revisions

THESE PLANS ARE COPYRIGHT PROTECTED

ADMINISTRATIVE CODE 61G15-27.001 AND FLORIDA STATUTE 471.033(1).

UNAUTHORIZED USE OF THIS DRAWING IS IN VIOLATION OF FLORIDA

c

Date By Description

BID SET

Client:

U.S. Forest Service

Air Tanker Base at LCQ

475 SE County Rd. 245

Lake City, Florida 32025

Architecture

PASSERO ASSOCIATES

Engineering www.passero.com

BID SET

Air Tanker Base

Designed by Bruce Bradley, EI

July 13, 2020

LEGEND

PROPOSED AIRCRAFT PORTLAND CEMENT CONCRETE

(PCC) PAVEMENT

· 14" P-501 PCC

· 4" P-219 RECYCLED CONCRETE AGGREGATE BASE

PROPOSED FULL DEPTH AIRCRAFT ASPHALT PAVEMENT

(HEAVY-DUTY/TRANSITION AREAS)

· 4" P-401 SURFACE COURSE

· 12" P-219 RECYCLED CONCRETE AGGREGATE

· 12" STABILIZED SUBGRADE

PROPOSED FULL DEPTH AIRCRAFT ASPHALT PAVEMENT

(STANDARD)

· 4" P-401 SURFACE COURSE

· 8" P-219 RECYCLED CONCRETE AGGREGATE

· 12" STABILIZED SUBGRADE

PROPOSED PAVEMENT ADJACENT PIPE INSTALLATION

PAVEMENT REPAIR

· 4" P-401 SURFACE COURSE

PROPOSED STORM SEWER (BASE BID)

PROPOSED CONCRETE PAVEMENT AND

ASPHALT PAVEMENT EXPANSION (BASE BID)

PROPOSED PAVEMENT MARKINGS (BASE BID)

PROPOSED ACCESS

ROAD WIDENING

(BASE BID)

PROPOSED ASPHALT PAVEMENT

EXPANSION (BID ADDITIVE 1)

PROPOSED WEST POND

MODIFICATIONS (BASE BID)

PROPOSED EAST POND

MODIFICATIONS (BASE BID)

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text sb

AutoCAD SHX Text W

AutoCAD SHX Text st

AutoCAD SHX Text W

AutoCAD SHX Text

EV

AutoCAD SHX Text

EV

AutoCAD SHX Text sv

AutoCAD SHX Text sv

AutoCAD SHX Text sv

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50'

50'

TA

6+

TA

7+

TC

5+

TC

6+

RPZ

RPZ

LOW PROFILE BARRICADES (TYP.)

CONTRACTOR

STAGING AREA

CONTRACTOR

ACCESS GATE

G2-1

CONSTRUCTION

SAFETY &

PHASING PLAN

Project No.

Date

Drawing No.

4730 Casa Cola Way, Suite 200

Saint Augustine, FL 32095

Town/City:

County: State:

Designed by

Project Manager

Phone: (904) 757-6106 www.passero.com

Passero Associates

Client:

Certificate of Authorization # 3428

Stamp:

Matt Singletary, P.E.

Matt Singletary, P.E.

U.S. Forest Service

Lake City

Lake City

Columbia Florida

20192861.0001

June 2020

Pavement Expansion

No.

Revisions

THESE PLANS ARE COPYRIGHT PROTECTED

ADMINISTRATIVE CODE 61G15-27.001 AND FLORIDA STATUTE 471.033(1).

UNAUTHORIZED USE OF THIS DRAWING IS IN VIOLATION OF FLORIDA

c

Date By Description

BID SET

Client:

U.S. Forest Service

Air Tanker Base at LCQ

475 SE County Rd. 245

Lake City, Florida 32025

Architecture

PASSERO ASSOCIATES

Engineering www.passero.com

BID SET

Air Tanker Base

Designed by Bruce Bradley, EI

July 13, 2020

1. THE CONTRACTOR SHALL DEVELOP A PHASING PLAN, AS APPLICABLE, MEETING THE BASIC PHASING AND RUNWAY CLOSURE REQUIREMENTS LISTED ON THIS SHEET.

ALTERNATE SEQUENCING OF PHASES AND CONSTRUCTION OPERATIONS MAY BE SUBMITTED TO THE ENGINEER FOR APPROVAL.

2. THE INTENT OF THIS CONTRACT IS TO COMPLETE THE PROJECT WITH A MINIMAL AMOUNT OF OPERATIONAL IMPACT TO THE AIRPORT; I.E. THE SHORTEST AMOUNT OF TIME THAT AIRCRAFT MOVEMENT AREAS & OTHER FACILITIES ARE CLOSED OR IMPACTED DUE TO CONSTRUCTION OPERATIONS. NO RUNWAY, TAXIWAY, APRON, OR AIRPORT ROADWAY SHALL BE CLOSED WITHOUT PRIOR APPROVAL OF THE OWNER, TO ENABLE NECESSARY NOTICES TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR TENANTS. A MINIMUM OF 48 HOURS WRITTEN NOTICE OF REQUESTED CLOSING SHALL BE DIRECTED TO THE ENGINEER, WHO WILL COORDINATE THE REQUEST WITH THE OWNER. PRIOR TO THE RE-OPENING OF THE RUNWAY, TAXIWAY OR APRON THE CONTRACTOR, OWNER, AND RESIDENT ENGINEER SHALL

INSPECT THE PAVEMENT SURFACE TO DETERMINE THAT THE IT IS SUITABLE TO BE OPENED.

3. ALL CONSTRUCTION ACTIVITIES SHALL BE COMPLETED WITHIN THE ALLOTTED CONTRACT TIME. SEE GENERAL PROVISIONS SECTION 80 FOR DETAILS ON CONTRACT TIME

AND LIQUIDATED DAMAGES THAT MAY BE ASSESSED FOR FAILURE TO COMPLETE ON TIME.

4. ALL MILLINGS AND EXCESS EXCAVATED MATERIAL SHALL BECOME THE PROPERTY OF THE CONTRACTOR, WHO SHALL REMOVE ALL SUCH MATERIAL FROM THE

PROPERTY.

5. SEE SAFETY AND SECURITY AND GENERAL NOTES, DWG. NO. 3, FOR ADDITIONAL REQUIREMENTS FOR AIRFIELD WORK.

6. THE CONTRACTOR SHALL STABILIZE, MAINTAIN, AND REMOVE, WHEN NO LONGER NEEDED, ALL TEMPORARY ACCESS AND HAUL ROADS REQUIRED TO FULFILL THE

CONTRACT. THE AFFECTED AREAS SHALL BE RESTORED PRIOR TO FINAL ACCEPTANCE.

7. WHEN AIRFIELD ELECTRICAL CIRCUITS ARE MADE DISCONTINUOUS DUE TO CONSTRUCTION OPERATIONS, TEMPORARY ELECTRICAL JUMPERS WILL BE INSTALLED, AS NECESSARY, TO ENSURE THAT EXISTING AIRFIELD LIGHTING SYSTEMS REMAIN FUNCTIONAL DURING PERIODS WHEN THE ASSOCIATED AIRCRAFT MOVEMENT AREAS ARE ACTIVE. EXISTING LIGHTING CIRCUITS, OUTSIDE WORK AREAS, SHALL REMAIN OPERATIONAL FOR THE DURATION OF CONSTRUCTION. THE COST OF ANY TEMPORARY JUMPER CABLES OR CONNECTIONS SHALL BE INCLUDED IN ITEM M-100, MAINTENANCE OF TRAFFIC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING ALL PRE-CONSTRUCTION AND POST CONSTRUCTION RESISTANCE TESTING FOR ALL LIGHTING CIRCUITS IN ACCORDANCE WITH SPECIFICATION SECTION L-108. THE COST FOR ALL TESTING AND TROUBLESHOOTING SHALL BE INCLUDED IN L-108 ITEMS., OR OTHERWISE THE ITEM THAT L-108 IS INCIDENTAL TO.

8. AT THE COMPLETION OF EACH DAY'S WORK, AND PRIOR TO THE RE-OPENING OF ANY RUNWAY OR TAXIWAY, THE CONTRACTOR SHALL REMOVE ANY EQUIPMENT AND CLEAN AIRFIELD PAVEMENT SURFACES TO REMOVE ANY DEBRIS TO THE SATISFACTION OF THE ENGINEER AND OWNER.

9. LOW PROFILE BARRICADES SHALL BE INSTALLED AS SHOWN OR AS ORDERED BY THE ENGINEER/OWNER (SEE DETAILS).

10. ALL REQUIRED MAINTENANCE AND PROTECTION OF TRAFFIC DEVICES SHALL BE INSTALLED AND APPROVED BY THE ENGINEER PRIOR TO STARTING WORK.

11. FLAGMAN NOTE: FLAGMEN SHALL BE PROVIDED BY THE CONTRACTOR FOR ALL ACTIVE RUNWAY/TAXIWAY CROSSINGS. COST OF FLAGMEN SHALL BE INCLUDED IN

MAINTENANCE & PROTECTION OF TRAFFIC.

12. ALL CONTRACTOR STAGING/STOCKPILE AREAS ARE TO BE CLEARED, CLEANED, AND RESTORED, FREE OF DEBRIS AND MATERIALS.

13. FOR CONTRACTOR'S AIRPORT SAFETY PROCEDURES REFER TO SHEET 3 OF THE PLANS, SAFETY SECURITY AND GENERAL NOTES, AND THE FOLLOWING SAFETY GUIDELINES

(THE LATEST EDITION OF EACH PUBLICATION SHALL APPLY):

150/5370-2 "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION"

150/5200-18 "AIRPORT SAFETY SELF-INSPECTION

150/5210-5 "PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AIRPORT" LEGEND:

LOW PROFILE BARRICADES. (SEE DETAILS).

CONTRACTOR ACCESS / HAUL ROUTE

FLAGMAN

CONTRACTOR STAGING AREA

1. NO RUNWAY CLOSURES DUE TO CONSTRUCTION ARE ANTICIPATED.

2. TAXIWAY B IS PROPOSED FOR HAUL ROUTE ACCESS TO THE PROJECT SITE WITH THE INTENT THAT IT REMAINS OPEN TO THE MAXIMUM EXTENT POSSIBLE. THE CONTRACTOR

SHALL KEEP THE TAXIWAY FREE OF DEBRIS, AVAILABLE FOR AIRCRAFT USE AS NEEDED, AND ALWAYS YIELD TO AIRCRAFT. FLAGMEN SHALL BE PROVIDED AS NECESSARY

DURING HAULING OPERATIONS.

3. LOW PROFILE BARRICADES SHALL BE PROVIDED ADJACENT THE CONSTRUCTION AREA AND APPROXIMATELY ALONG THE TAXIWAY SAFETY AREA TO

DELINEATE/SEPARATE TAXIWAY BRAVO FROM THE WORK AREA.

4. STORAGE OF MATERIALS AND EQUIPMENT SHALL BE OUTSIDE THE TAXIWAY B OBJECT FREE AREA.

G3-1

AutoCAD SHX Text c

AutoCAD SHX Text d

AutoCAD SHX Text s

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text st

AutoCAD SHX Text sb

AutoCAD SHX Text sb

AutoCAD SHX Text sb

AutoCAD SHX Text sb

AutoCAD SHX Text sb

AutoCAD SHX Text sb

AutoCAD SHX Text sb

AutoCAD SHX Text W

AutoCAD SHX Text st

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

EV

AutoCAD SHX Text

EV

AutoCAD SHX Text

RPZ

AutoCAD SHX Text

EV

AutoCAD SHX Text

EV

AutoCAD SHX Text sv

AutoCAD SHX Text sv

AutoCAD SHX Text sv

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

INDUSTRIAL

AutoCAD SHX Text

PARK

AutoCAD SHX Text

HOMES OF MERIT

AutoCAD SHX Text

STATE

AutoCAD SHX Text

RUNWAY 10-28 8002' X 150'

AutoCAD SHX Text

PRICE CREEK ROAD

AutoCAD SHX Text

ROUTE 100

AutoCAD SHX Text

TAXIWAY B

AutoCAD SHX Text

TAXIWAY B1

AutoCAD SHX Text

TW C1

AutoCAD SHX Text

USFS TANKER BASE FACILITY

AutoCAD SHX Text

USFS TANKER BASE ACCESS RD. FACILITY ENTRANCE

AutoCAD SHX Text

PROPOSED PAVEMENT EXPANSION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50'

AutoCAD SHX Text 50'

AutoCAD SHX Text

GENERAL PHASING NOTES:

AutoCAD SHX Text

PROJECT-SPECIFIC PHASING REQUIREMENTS:

Runway 10-28

Ru nw ay 5-

See Detail Below

See Sheet G3-2

See Sheet G3-3

LCQ

Map of Topographic Survey

Range 17 East, Columbia County, Florida "Lake City Gateway Airport -

Lying in Section 35, Township 3 South, Project No.

Date

Drawing No.

4730 Casa Cola Way, Suite 200

Saint Augustine, FL 32095

Town/City:

County:

State:

Designed by

Project Manager

Phone: (904) 757-6106 www.passero.com

Passero Associates

Client:

Certificate of Authorization # 3428

Stamp:

Matt Singletary, P.E.

Matt Singletary, P.E.

U.S. Forest Service

Lake City

Lake City

Columbia Florida

20192861.0001

June 2020

Pavement Expansion

No.

Revisions

THESE PLANS ARE COPYRIGHT PROTECTED

ADMINISTRATIVE CODE 61G15-27.001 AND FLORIDA STATUTE 471.033(1).

UNAUTHORIZED USE OF THIS DRAWING IS IN VIOLATION OF FLORIDA

c

Date By Description

Client:

U.S. Forest Service

Air Tanker Base at LCQ

475 SE County Rd. 245

Lake City, Florida 32025

Architecture

PASSERO ASSOCIATES

Engineering www.passero.com

BID SET

Air Tanker Base

Designed by Bruce Bradley, EI

July 13, 2020

EXISTING

CONDITIONS

AND SURVEY

CONTROL PLAN

G3-1

ENGINEERS NOTE:

THE EXISTING CONDITIONS AND SURVEY CONTROL PLANS ARE

A REPRODUCTION OF A TOPOGRAPHIC SURVEY PREPARED BY

MCMILLEN SURVEYING, INC., DATED DECEMBER 5, 2019.

MCMILLEN SURVEYING, INC., ADDRESS & PHONE NUMBER:

· 15 S.E. 5TH STREET, WILLISTON, FLORIDA, 32696

· OFFICE PHONE 352-528-6277.

McMillen Surveying, Inc.

PROJECT LOCATION

USFS TANKER BASE FACILITY

AutoCAD SHX Text N83°55'07"W 8002.54'(overall)

AutoCAD SHX Text Elevation - 194.16'

AutoCAD SHX Text Easting - 2,576,072.0850'

AutoCAD SHX Text Northing - 435,006.5420'

AutoCAD SHX Text Brass Disk in hinged casing

AutoCAD SHX Text Secondary Airport Control Point

AutoCAD SHX Text Secondary Airport Control Point

AutoCAD SHX Text 1/2" steel rod in hinged casing

AutoCAD SHX Text Northing - 434,816.6740'

AutoCAD SHX Text Easting - 2,577,825.6870'

AutoCAD SHX Text Elevation - 192.59'

AutoCAD SHX Text Elevation - 196.30'

AutoCAD SHX Text Easting - 2,579,861.9294'

AutoCAD SHX Text Northing - 434,815.2660'

AutoCAD SHX Text Nail & Disk Found

AutoCAD SHX Text Runway End Point

AutoCAD SHX Text Runway End Point

AutoCAD SHX Text Nail & Disk Found

AutoCAD SHX Text Northing - 435,663.0761'

AutoCAD SHX Text Easting - 2,571,904.4245'

AutoCAD SHX Text Elevation - 197.99'

AutoCAD SHX Text Elevation - 185.49'

AutoCAD SHX Text Easting - 2,574,979.361'

AutoCAD SHX Text Northing - 433,265.887'

AutoCAD SHX Text Nail & Disk Found

AutoCAD SHX Text Runway End Point

AutoCAD SHX Text Runway End Point

AutoCAD SHX Text Nail & Disk Found

AutoCAD SHX Text Northing - 435,785.026'

AutoCAD SHX Text Easting - 2,578,099.488'

AutoCAD SHX Text Elevation - 194.85'

AutoCAD SHX Text Project Benchmark:

AutoCAD SHX Text 5/8" Iron Rod Found

AutoCAD SHX Text Northing - 435,165.123'

AutoCAD SHX Text Easting - 2,574,271.535'

AutoCAD SHX Text Elevation - 196.58'

AutoCAD SHX Text "Ref Pt L.B. 7055"

AutoCAD SHX Text N84°58'00"W 1807.52'

AutoCAD SHX Text "Lakeport Az. Mk. 1988"

AutoCAD SHX Text marked "31 JA"

AutoCAD SHX Text Project Benchmark:

AutoCAD SHX Text Nail & Disk Set marked

AutoCAD SHX Text Northing - 435,160.714'

AutoCAD SHX Text Easting - 2,572,488.704'

AutoCAD SHX Text Elevation - 195.32'

AutoCAD SHX Text "McMillen PSM 5469 PRM PCP"

AutoCAD SHX Text Project Benchmark:

AutoCAD SHX Text Northing - 435,022.299'

AutoCAD SHX Text Easting - 2,571,409.502'

AutoCAD SHX Text Elevation - 193.00'

AutoCAD SHX Text Nail & Disk Set marked

AutoCAD SHX Text "McMillen PSM 5469 PRM PCP"

AutoCAD SHX Text S89°51'30"W 1782.84'

AutoCAD SHX Text N82°41'29"E 1088.04'

AutoCAD SHX Text N49°18'40"W 770.55'

AutoCAD SHX Text S83°49'14"E 1763.85'

AutoCAD SHX Text S89°57'37"E 2036.24'

AutoCAD SHX Text N51°04'59"E 4010.14'

AutoCAD SHX Text 192.32

AutoCAD SHX Text 191.34

AutoCAD SHX Text 191.33

AutoCAD SHX Text 191.36

AutoCAD SHX Text 191.30

AutoCAD SHX Text 192.3

AutoCAD SHX Text 192.63

AutoCAD SHX Text 192.60

AutoCAD SHX Text 192.58

AutoCAD SHX Text 192.55

AutoCAD SHX Text 192.30

AutoCAD SHX Text 192.20

AutoCAD SHX Text 190.9

AutoCAD SHX Text 192.2

AutoCAD SHX Text 191.9

AutoCAD SHX Text 192.34

AutoCAD SHX Text 192.39

AutoCAD SHX Text 192.41

AutoCAD SHX Text 192.40

AutoCAD SHX Text 192.35

AutoCAD SHX Text 192.38

AutoCAD SHX Text 192.45

AutoCAD SHX Text 192.49

AutoCAD SHX Text 192.46

AutoCAD SHX Text 192.45

AutoCAD SHX Text 192.50

AutoCAD SHX Text 191.4

AutoCAD SHX Text 192.57

AutoCAD SHX Text 192.64

AutoCAD SHX Text 192.69

AutoCAD SHX Text 192.72

AutoCAD SHX Text 192.73

AutoCAD SHX Text 192.63

AutoCAD SHX Text 192.63

AutoCAD SHX Text 191.5

AutoCAD SHX Text 192.4

AutoCAD SHX Text 190.2

AutoCAD SHX Text 190.3

AutoCAD SHX Text 190.9

AutoCAD SHX Text 190.1

AutoCAD SHX Text 189.2

AutoCAD SHX Text 189.2

AutoCAD SHX Text 191.1

AutoCAD SHX Text 191.2

AutoCAD SHX Text 192.31

AutoCAD SHX Text 189.5

AutoCAD SHX Text 189.5

AutoCAD SHX Text 190.9

AutoCAD SHX Text 190.6

AutoCAD SHX Text 191.3

AutoCAD SHX Text 192.36

AutoCAD SHX Text 192.61

AutoCAD SHX Text 192.63

AutoCAD SHX Text 190.5

AutoCAD SHX Text 191.3

AutoCAD SHX Text 192.58

AutoCAD SHX Text 192.68

AutoCAD SHX Text 192.3

AutoCAD SHX Text 190.2

AutoCAD SHX Text 190.1

AutoCAD SHX Text 191.4

AutoCAD SHX Text 189.7

AutoCAD SHX Text 189.8

AutoCAD SHX Text 191.2

AutoCAD SHX Text 191.7

AutoCAD SHX Text 192.0

AutoCAD SHX Text 192.4

AutoCAD SHX Text 192.68

AutoCAD SHX Text

GATE OPENER

AutoCAD SHX Text

PRESSURE SENSOR

AutoCAD SHX Text

ASPHALT ROADWAY

AutoCAD SHX Text

STOP BAR

AutoCAD SHX Text 192.65

AutoCAD SHX Text

"DO NOT ENTER"

AutoCAD SHX Text

OVERHEAD WIRES

AutoCAD SHX Text

DITCH

AutoCAD SHX Text

"STOP" SIGN

AutoCAD SHX Text

ELECTRIC

AutoCAD SHX Text

CABINET

AutoCAD SHX Text

TRANSFORMER

AutoCAD SHX Text 192.42

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text x

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

ASPHALT ROADWAY

AutoCAD SHX Text 189.6

AutoCAD SHX Text 189.6

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5500 MITERED END SECTION

AutoCAD SHX Text

WEST INVERT=189.23'(12"RCP)

AutoCAD SHX Text

5556 MITERED END SECTION

AutoCAD SHX Text

EAST INVERT=188.56'(12"RCP)

AutoCAD SHX Text

SECURITY FENCE

AutoCAD SHX Text

SECURITY FENCE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

LEGEND:

AutoCAD SHX Text

IDENT. = IDENTIFICATION

AutoCAD SHX Text

(R.B.) = REFERENCE BEARING

AutoCAD SHX Text

CMP = CORRUGATED METAL PIPE

AutoCAD SHX Text

ELEV. = ELEVATION

AutoCAD SHX Text

CONC. = CONCRETE

AutoCAD SHX Text

= MITERED END SECTION

AutoCAD SHX Text

= ROUND METAL PLATE (ACCESS COVER)

AutoCAD SHX Text

RCP = REINFORCED CONCRETE PIPE

AutoCAD SHX Text

= 2 COLOR LENZ LIGHT

AutoCAD SHX Text

= BLUE TAXIWAY LIGHT

AutoCAD SHX Text

= FLAT/MOUNTABLE RUNWAY LIGHT

AutoCAD SHX Text

= WHITE RUNWAY LIGHT

AutoCAD SHX Text bc = BACK OF CURB ELEVATION

AutoCAD SHX Text fl = FLOW LINE ELEVATION

AutoCAD SHX Text ep = EDGE OF PAVEMENT ELEVATION

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text NOTES: 1. BEARINGS HEREON ARE REFERRED TO AN ASSUMED VALUE OF NORTH 83°49'14"WEST FOR THE COMPUTED LINE BETWEEN A METAL ROD IN A CONCRETE CASING MARKED "LAKEPORT AZ MK 1988" AND A BRASS DISK IN A CONCRETE CASING MARKED "31 JA 1995" ALONG THE SOUTHERLY EDGE OF RUNWAY 10-28, SAID BEARING IS IDENTICAL WITH THE PUBLISHED STATE PLANE COORDINATES FOR THE FLORIDA NORTH ZONE. 2. NO UNDERGROUND UTILITIES OR IMPROVEMENTS HAVE BEEN LOCATED EXCEPT AS SHOWN. 3. THE FIELD DATA WAS COLLECTED BETWEEN NOVEMBER 09, 2017 AND NOVEMBER 17, 2017. 4. NO INSTRUMENTS OF RECORD REFLECTING EASEMENTS, RIGHTS-OF-WAY, AND/OR OWNERSHIP WERE FURNISHED TO THE SURVEYOR EXCEPT AS SHOWN, AND NO SEARCH OF THE PUBLIC RECORDS HAS BEEN DONE BY THE SURVEYOR. 5. THIS SURVEY DOES NOT REFLECT OR DETERMINE OWNERSHIP. 6. THIS SURVEY IS CERTIFIED ONLY TO THE SURVEY DATE AND NOT THE SIGNING DATE. 7. THIS MAP OF TOPOGRAPHIC SURVEY IS COMPRISED OF THREE SHEETS. ALL THREE SHEETS TOGETHER CREATE SAID MAP OF TOPOGRAPHIC SURVEY AND NO ONE SHEET IS INTENDED TO STAND ALONE.

AutoCAD SHX Text

EV

AutoCAD SHX Text

= ELECTRIC VAULT

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text gs = GROUND SHOT ELEVATION

AutoCAD SHX Text Office: 352 528-6277

AutoCAD SHX Text Williston, Florida, 32696

15 S.E. 5th Street

Map of Topographic Survey

Range 17 East, Columbia County, Florida "Lake City Gateway Airport -

Lying in Section 35, Township 3 South, Project No.

Date

Drawing No.

4730 Casa Cola Way, Suite 200

Saint Augustine, FL 32095

Town/City:

County:

State:

Designed by

Project Manager

Phone: (904) 757-6106 www.passero.com

Passero Associates

Client:

Certificate of Authorization # 3428

Stamp:

Matt Singletary, P.E.

Matt Singletary, P.E.

U.S. Forest Service

Lake City

Lake City

Columbia Florida

20192861.0001

June 2020

Pavement Expansion

No.

Revisions

THESE PLANS ARE COPYRIGHT PROTECTED

ADMINISTRATIVE CODE 61G15-27.001 AND FLORIDA STATUTE 471.033(1).

UNAUTHORIZED USE OF THIS DRAWING IS IN VIOLATION OF FLORIDA

c

Date By Description

Client:

U.S. Forest Service

Air Tanker Base at LCQ

475 SE County Rd. 245

Lake City, Florida 32025

Architecture

PASSERO ASSOCIATES

Engineering www.passero.com

BID SET

Air Tanker Base

Designed by Bruce Bradley, EI

July 13, 2020

EXISTING

CONDITIONS

AND SURVEY

CONTROL PLAN

G3-2

SE

E

SH

EE

T G

3-

ENGINEERS NOTE:

THE EXISTING CONDITIONS AND SURVEY CONTROL PLANS ARE

A REPRODUCTION OF A TOPOGRAPHIC SURVEY PREPARED BY

MCMILLEN SURVEYING, INC., DATED DECEMBER 5, 2019.

MCMILLEN SURVEYING, INC., ADDRESS & PHONE NUMBER:

· 15 S.E. 5TH STREET, WILLISTON, FLORIDA, 32696

· OFFICE PHONE 352-528-6277.

McMillen Surveying, Inc.

AutoCAD SHX Text 194.44

AutoCAD SHX Text 194.34

AutoCAD SHX Text 194.20

AutoCAD SHX Text 194.30

AutoCAD SHX Text 194.1

AutoCAD SHX Text 194.17

AutoCAD SHX Text 194.32

AutoCAD SHX Text 194.31

AutoCAD SHX Text 194.17

AutoCAD SHX Text 193.3

AutoCAD SHX Text 192.9

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.74

AutoCAD SHX Text 193.66

AutoCAD SHX Text 193.47

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.6gs

AutoCAD SHX Text 194.07bc

AutoCAD SHX Text 193.53fl

AutoCAD SHX Text 193.52fl

AutoCAD SHX Text 194.01bc

AutoCAD SHX Text 193.7gs

AutoCAD SHX Text 193.3

AutoCAD SHX Text 193.37

AutoCAD SHX Text 193.37ep

AutoCAD SHX Text 193.88bc

AutoCAD SHX Text 193.4gs

AutoCAD SHX Text 193.35

AutoCAD SHX Text 193.42

AutoCAD SHX Text 193.02

AutoCAD SHX Text 193.03

AutoCAD SHX Text 193.65

AutoCAD SHX Text 193.46

AutoCAD SHX Text 193.59

AutoCAD SHX Text 193.71

AutoCAD SHX Text 193.77

AutoCAD SHX Text 193.78

AutoCAD SHX Text 193.87

AutoCAD SHX Text 193.86

AutoCAD SHX Text 193.89

AutoCAD SHX Text 193.90

AutoCAD SHX Text 193.87

AutoCAD SHX Text 193.3

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.4

AutoCAD SHX Text 194.30

AutoCAD SHX Text 194.20

AutoCAD SHX Text 194.31

AutoCAD SHX Text 194.05

AutoCAD SHX Text 193.4

AutoCAD SHX Text 194.3

AutoCAD SHX Text 193.5

AutoCAD SHX Text 194.27

AutoCAD SHX Text 194.09

AutoCAD SHX Text 193.8

AutoCAD SHX Text 193.8

AutoCAD SHX Text 193.9

AutoCAD SHX Text 193.91

AutoCAD SHX Text 193.64

AutoCAD SHX Text 193.38

AutoCAD SHX Text 192.7

AutoCAD SHX Text 193.40

AutoCAD SHX Text 193.47

AutoCAD SHX Text 193.42

AutoCAD SHX Text 193.39

AutoCAD SHX Text 193.43

AutoCAD SHX Text 193.45

AutoCAD SHX Text 193.39

AutoCAD SHX Text 193.92

AutoCAD SHX Text 193.94

AutoCAD SHX Text 194.00

AutoCAD SHX Text 194.13

AutoCAD SHX Text 194.19

AutoCAD SHX Text 194.23

AutoCAD SHX Text 194.28

AutoCAD SHX Text 193.5

AutoCAD SHX Text 194.0

AutoCAD SHX Text 193.83

AutoCAD SHX Text 194.00

AutoCAD SHX Text 193.81

AutoCAD SHX Text 193.88

AutoCAD SHX Text 193.89

AutoCAD SHX Text 193.89

AutoCAD SHX Text 193.90

AutoCAD SHX Text 193.87

AutoCAD SHX Text 193.90

AutoCAD SHX Text 193.94

AutoCAD SHX Text 193.92

AutoCAD SHX Text 193.94

AutoCAD SHX Text 193.5

AutoCAD SHX Text 194.5

AutoCAD SHX Text 194.3

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.9

AutoCAD SHX Text 193.8

AutoCAD SHX Text 193.2

AutoCAD SHX Text 193.1

AutoCAD SHX Text 193.8

AutoCAD SHX Text 193.3

AutoCAD SHX Text 193.0

AutoCAD SHX Text 192.9

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.0

AutoCAD SHX Text 193.66

AutoCAD SHX Text 193.71

AutoCAD SHX Text 193.71

AutoCAD SHX Text 193.76

AutoCAD SHX Text 193.90

AutoCAD SHX Text 193.98

AutoCAD SHX Text 193.96

AutoCAD SHX Text 193.65

AutoCAD SHX Text 192.9

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.3

AutoCAD SHX Text 192.8

AutoCAD SHX Text 193.68

AutoCAD SHX Text 193.85

AutoCAD SHX Text 193.87

AutoCAD SHX Text 194.02

AutoCAD SHX Text 193.89

AutoCAD SHX Text 193.79

AutoCAD SHX Text 193.76

AutoCAD SHX Text 193.62

AutoCAD SHX Text 192.5

AutoCAD SHX Text 193.0

AutoCAD SHX Text 193.0

AutoCAD SHX Text 192.9

AutoCAD SHX Text 192.2

AutoCAD SHX Text 192.4

AutoCAD SHX Text 192.5

AutoCAD SHX Text 193.57

AutoCAD SHX Text 193.52

AutoCAD SHX Text 193.38

AutoCAD SHX Text 193.26

AutoCAD SHX Text 193.27

AutoCAD SHX Text 193.26

AutoCAD SHX Text 193.23

AutoCAD SHX Text 193.20

AutoCAD SHX Text 193.18

AutoCAD SHX Text 193.20

AutoCAD SHX Text 193.62

AutoCAD SHX Text 193.42

AutoCAD SHX Text 193.1

AutoCAD SHX Text 193.21

AutoCAD SHX Text 193.2

AutoCAD SHX Text 192.6

AutoCAD SHX Text 193.0

AutoCAD SHX Text 193.25

AutoCAD SHX Text 193.27

AutoCAD SHX Text 193.27

AutoCAD SHX Text 193.28

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.1

AutoCAD SHX Text 192.9

AutoCAD SHX Text 193.7

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.29

AutoCAD SHX Text 192.6

AutoCAD SHX Text 192.6

AutoCAD SHX Text 192.6

AutoCAD SHX Text 193.3

AutoCAD SHX Text 192.5

AutoCAD SHX Text 193.3

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.3

AutoCAD SHX Text 192.5

AutoCAD SHX Text 193.0

AutoCAD SHX Text 193.1

AutoCAD SHX Text 193.0

AutoCAD SHX Text 192.9

AutoCAD SHX Text 192.9

AutoCAD SHX Text 192.2

AutoCAD SHX Text 193.00

AutoCAD SHX Text 193.17

AutoCAD SHX Text 193.17

AutoCAD SHX Text 193.08

AutoCAD SHX Text 192.8

AutoCAD SHX Text 192.8

AutoCAD SHX Text 192.95

AutoCAD SHX Text 193.12

AutoCAD SHX Text 193.06

AutoCAD SHX Text 192.93

AutoCAD SHX Text 192.0

AutoCAD SHX Text 192.7

AutoCAD SHX Text 192.8

AutoCAD SHX Text 192.9

AutoCAD SHX Text 192.70

AutoCAD SHX Text 192.0

AutoCAD SHX Text 192.1

AutoCAD SHX Text 192.2

AutoCAD SHX Text 193.2

AutoCAD SHX Text 193.6

AutoCAD SHX Text 194.0

AutoCAD SHX Text 193.9

AutoCAD SHX Text 193.7

AutoCAD SHX Text 193.7

AutoCAD SHX Text 193.7

AutoCAD SHX Text 193.6

AutoCAD SHX Text 193.0

AutoCAD SHX Text 191.8

AutoCAD SHX Text 191.5

AutoCAD SHX Text 191.5

AutoCAD SHX Text 192.1

AutoCAD SHX Text 192.4

AutoCAD SHX Text 192.3

AutoCAD SHX Text 191.8

AutoCAD SHX Text 192.75

AutoCAD SHX Text 192.97

AutoCAD SHX Text 192.96

AutoCAD SHX Text 192.85

AutoCAD SHX Text 192.7

AutoCAD SHX Text 192.65

AutoCAD SHX Text 192.80

AutoCAD SHX Text 192.86

AutoCAD SHX Text 192.72

AutoCAD SHX Text 191.9

AutoCAD SHX Text 194.27

AutoCAD SHX Text 194.27

AutoCAD SHX Text 194.27

AutoCAD SHX Text 194.21

AutoCAD SHX Text 194.09

AutoCAD SHX Text 194.04

AutoCAD SHX Text 193.97

AutoCAD SHX Text 193.90

AutoCAD SHX Text 193.78

AutoCAD SHX Text 193.73

AutoCAD SHX Text 193.66

AutoCAD SHX Text 193.65

AutoCAD SHX Text 193.56

AutoCAD SHX Text 193.58

AutoCAD SHX Text 193.0

AutoCAD SHX Text 193.0

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.5

AutoCAD SHX Text 193.3

AutoCAD SHX Text 191.4

AutoCAD SHX Text 191.1

AutoCAD SHX Text 191.2

AutoCAD SHX Text 192.3

AutoCAD SHX Text 192.0

AutoCAD SHX Text 192.2

AutoCAD SHX Text 190.2

AutoCAD SHX Text 190.2

AutoCAD SHX Text 193.0

AutoCAD SHX Text 192.9

AutoCAD SHX Text 191.2

AutoCAD SHX Text 190.7

AutoCAD SHX Text 192.6

AutoCAD SHX Text 192.6

AutoCAD SHX Text 193.1

AutoCAD SHX Text 193.7

AutoCAD SHX Text 193.6

AutoCAD SHX Text 193.1

AutoCAD SHX Text 192.0

AutoCAD SHX Text 192.2

AutoCAD SHX Text 192.8

AutoCAD SHX Text 193.6

AutoCAD SHX Text 193.4

AutoCAD SHX Text 193.3

AutoCAD SHX Text 193.1

AutoCAD SHX Text 192.87

AutoCAD SHX Text 192.95

AutoCAD SHX Text 192.96

AutoCAD SHX Text 193.15

AutoCAD SHX Text 193.14

AutoCAD SHX Text 193.22

AutoCAD SHX Text 193.26

AutoCAD SHX Text 189.4

AutoCAD SHX Text 189.1

AutoCAD SHX Text 189.4

AutoCAD SHX Text 189.6

AutoCAD SHX Text 189.8

AutoCAD SHX Text 189.5

AutoCAD SHX Text 189.8

AutoCAD SHX Text 192.1

AutoCAD SHX Text sv

AutoCAD SHX Text sv

AutoCAD SHX Text sv

AutoCAD SHX Text

SEWER VALVE

AutoCAD SHX Text

AND SIGN

AutoCAD SHX Text

SEWER VALVE

AutoCAD SHX Text

AND SIGN

AutoCAD SHX Text

SEWER VALVE

AutoCAD SHX Text

AND SIGN

AutoCAD SHX Text

ASPHALT PAVED

AutoCAD SHX Text

TIE DOWN AREA

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

TOP OF BANK

AutoCAD SHX Text

TOP OF BANK

AutoCAD SHX Text 193.39

AutoCAD SHX Text 193.42fl

AutoCAD SHX Text 193.92bc

AutoCAD SHX Text 193.8gs

AutoCAD SHX Text

BOTTOM OF GRATE=191.83'

AutoCAD SHX Text 193.39fl

AutoCAD SHX Text 193.91bc

AutoCAD SHX Text 193.8gs

AutoCAD SHX Text 193.37ep

AutoCAD SHX Text 193.88bc

AutoCAD SHX Text 193.6gs

AutoCAD SHX Text

BOTTOM OF GRATE=191.76'

AutoCAD SHX Text

CONC.

AutoCAD SHX Text

C0NCRETE CURB

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

YELLOW STRIPE

AutoCAD SHX Text

YELLOW STRIPE

AutoCAD SHX Text

WHITE STRIPE

AutoCAD SHX Text 1 inch = ft.

AutoCAD SHX Text

( IN FEET )

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office: 352 528-6277

AutoCAD SHX Text Williston, Florida, 32696

TAXIWAY BRAVO

T A X

IW

A Y B

R A V O

Map of Topographic Survey

Range 17 East, Columbia County, Florida…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .