This Statement of Work outlines DLA Disposition Services' requirement for 14 metal containers for their Armor Cutting Systems (ACS) in Battle Creek, Michigan. The containers must meet specific dimensions (maximum 96"x96"x96" exterior, minimum 88"x88"x83" interior) and include features such as metal doors on all sides with locks, openings of at least 80" wide x 72" vertical, steel roof and floor, two closable vents, 4,000-pound support capacity, fork pockets on all sides, and DOT-compliant tie downs.

The contract is a firm-fixed-price, one-time purchase that requires delivery within 90 days of order. Only new equipment is acceptable, with no remanufactured or "gray market" items permitted. Each container must have DoD Item Unique Identification (IUID) compliance and include digital and hard copy manuals. Delivery will be to Battle Creek Air National Guard Base, with five business days advance notice required. The solicitation is set aside for small businesses under NAICS 332439 with a size standard of 600 employees, and contractors must submit quotes by 2:00 p.m. Eastern Standard Time.

View the file

Other files

File Type Posted
SP451025Q1008-Amend 1.pdf PDF
Attachment 1 Containers Scope of Work Amend 1.docx DOCX document
Attachment 2 Containers Price Schedule .xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

DEFENSE LOGISTICS AGENCY (DLA)

DISPOSITION SERVICES (DLA DS)

BATTLE CREEK, MICHIGAN

ARMORED CUTTING SYSTEMS (ACS) CONTAINERS

TABLE OF CONTENTS

1. INTRODUCTION

2. CLIN 0001 CONTAINERS

3. MANUALS

4. EQUIPMENT DELIVERY AND WARRANTY

5. BASE ACCESS AND SECURITY

6. DESTINATION

7. SPILL RESPONSIBILITY

8. INVOICING

STATEMENT OF WORK (SOW)

1. INTRODUCTION

a. The primary mission of DLA DS is to dispose of Department of Defense (DoD) excess and surplus property generated by the military services. This is accomplished through reutilization to other DoD activities, transfer to other Federal agencies, donation to authorized state and local organizations, sale to the public, or ultimate disposal through abandonment or destruction. DLA DS and Installation Management are headquartered in Battle Creek, Michigan, with a variety of field sites worldwide. The purpose of this contract is to acquire new containers for DLA DS Armor Cutting Systems (ACS).

b. This requirement is for the purchase, and delivery, of 14 containers. The Contractor shall price items on the price schedule to include any packing/shipping charges. All costs associated with the purchase and delivery of the Contract Line-Item Number (CLIN) shall be included in the overall price quoted for the CLIN.

c. This contract is a Firm Fixed Price (FFP), one-time purchase contract.

d. New Equipment ONLY; no remanufactured or “gray market” items.

e. The containers will have a DoD Item Unique Identification (IUID) in compliance with DFARS 252.211-7003 (252.211-7003 Item Unique Identification and Valuation. | Acquisition.GOV).

2. CLIN 0001 CONTAINERS

When CLIN 0001 is ordered, the Contractor shall purchase and deliver 14 Containers with the following salient characteristics per shelter:

1) No larger than 96”x96”x96” exterior dimensions

2) Minimum interior dimensions 88” long x 88”wide x 83”high

3) Metal doors on all sides with method of locking

4) Openings to be a minimum of 80” wide x 72” vertical

5) Steel Roof

6) Heavy Duty Steel Floor

7) Two (2) closable vents

8) Capable of supporting 4,000 pounds

9) Container not to exceed 4,500 pounds

10) Fork pockets on all sides

11) Tie downs to satisfy DOT requirements placed at a minimum on one (1) in every corner per side in the base

12) Container to maintain structural integrity in adverse and transport conditions

3. MANUALS

The Contractor shall provide one (1) digital and one (1) hard copy Manual Guide, and Maintenance and Service Manual for each item delivered as applicable.

4. EQUIPMENT DELIVERY AND WARRANTY

a. For the Contractor to successfully handoff the specified quantity of units ordered and receive payment from the United States Government (USG), they shall at the time of shipping:

1) Provide tracking/shipping information for each shipment

2) Provide the shipping company name

b. DLA DS Battle Creek requires a five (5) business day notification for all visitors. Delivery date for all CLINs shall not exceed 90 days after establishment of a Delivery Order (DO).

c. The Contractor shall complete and sign the provided DD250, Material Inspection and Receiving Report, with USG personnel and attach the completed form in Wide Area WorkFlow (WAWF) prior to acceptance for payment. A picture of the data plate with serial number shall be attached to the invoice prior to Government acceptance.

d. Each piece of equipment shall come with the manufacturer’s standard equipment warranty.

e. All required items must be completed/delivered within 90 days from the date of order, unless otherwise coordinated with and approved by the Contracting Officer (KO). The Contractor shall provide at least five (5) business days advance notice to the Point of Contact (POC). Any variance or extensions must be coordinated with the KO.

f. The delivery under this contract will be performed during normal government working days, Monday through Friday, which are available from the POC. The Contractor shall not schedule delivery on a regular federal holiday (see below), designated by Presidential proclamation, or DLA DS closure, rescheduling shall be at the discretion of the POC.

New Year’s Day
January 1st
Martin Luther King’s Birthday
Third Monday in January
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Juneteenth
June 19th
Independence Day
July 4th
Labor Day
First Monday in September
Columbus Day
Second Monday in October
Veteran’s Day
November 11th
Thanksgiving Day
Fourth Thursday in November
Christmas Day
December 25th

*If The holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.

5. BASE ACCESS AND SECURITY

a. The Contractor shall coordinate base installation access for all their employees. The Contractor shall be familiar with and comply with all Base Command policies regarding security considerations for all Contractor employees.

b. Unscheduled gate closures by the installation security personnel may occur at any time causing all personnel entering or exiting a closed installation to experience a delay; this cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the Contractor employee’s installation driving privileges.

c. Contractor employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All Contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The Contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The USG reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

d. The Contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the POC. The Contractor and all associated employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation security personnel. The Contractor shall ensure compliance with all personal identity verification requirements as directed by DoD and/or local policy. Should the Force Protection Condition (FPCON) change, the USG may require changes in Contractor security matters or processes.

6. DESTINATION

a. The destination for this contract is on Battle Creek Air National Guard Base.

Address: Attn: Brian Davidson BLDG 6917 3511 Falcon AVE.

Battle Creek, MI 49037.

b. The Contractor shall verify the shipping address before shipping.

c. The Contractor shall notify Chad Selby, and Timothy Zweng at least five (5) business days prior to delivery of the plasma cutter to its destination to ensure the site is prepared to accept the machines. The Contractor shall use dladsopsmhe@dla.mil, chad.selby@dla,mil, and Timothy.Zweng@DLA.mil as the official communication link for all issues.

7. SPILL RESPONSIBILITY

The Contractor is solely responsible for all spills or leaks during the performance of this contract, which occurs because of, or is contributed to by the actions of its agents, employees, or subcontractors. The Contractor shall clean up such spills or leaks to the satisfaction of the USG in a manner that complies with applicable Federal, state, and local laws and regulations. The clean-up shall be at no cost to the USG. The Contractor shall report all such spills or leaks, regardless of their quantity, to the POC immediately upon discovery. A written follow-up report shall be submitted to the POC not later than twenty-four hours after the initial telephonic report. The written report shall be in narrative form, and as a minimum shall include the following:

1) Description of item spilled (including identity, quantity)

2) Whether amount spilled is EPA or state reportable, and if so, whether it was reported. Exact time and location of spill including a description of the area involved

3) Containment procedures initiated

4) Summary of any communications Contractor has with press or USG officials other than the POC

5) Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue

6) Description of item spilled (including identity, quantity)

8. INVOICING

The Contractor will invoice through the Department of Defense WAWF system. Invoices must be submitted through WAWF in accordance with DFARS 252.232-7003. Refer to https://wawf.eb.mil for additional information.