DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 179th Airlift Wing

1947 Harrington Memorial Road

Mansfield OH 44903-8049

1.0 PROJECT TITLE. Install WSTI/Thermal removal and install

2.0 CURRENT SITUATION: The 179 SFS is seeking the replacement of their existing thermal camera. Due to the increased AT/FP security concerns, a thermal imager would improve security and observation capabilities in PL

Area. IAW AFI31-101 (6.7.6Detection Enhancement Devices). Our current thermal imager is non-operational and limits the effectiveness of early detection. Replacement is critical and warranted to uphold current and increased security measures.

3.0 STATEMENT OF REQUIREMENT: The contractor shall provide the Government with the following:

3.1 The purpose of this project is to provide a turn-key removal of the existing thermal camera and replacement with the new WSTI and integrate into a new standalone milestone VMS. (NOTE: The camera will be installed on the roof of an aircraft hangar. There is no existing fall protection system available for use by the contractor.

3.1.1 Camera shall meet or exceed the following minimum salient characteristics: Dual sensor, cooled/uncooled, visible light imaging sensor, high speed, and pan-tilt, with zoom with minimum of 30X, outdoor use 640X480 resolution with a remote control module that will be set up in BDOC.

3.1.2 Furnish, install and configure, Power supply, fiber optic cable terminations, network cabling and switches, device installation labor and device configuration labor.

3.1.3 Furnish, install and configure, Desktop server, milestone camera license, system installation labor and system configuration labor

3.1.4 Furnish, 8 hours of system training TBD

3.1.5 Installation shall be turn-key, and result in complete and useable end-product, and shall include start-up/testing/etc., as well as any training necessary for the Government to operate independently.

3.2 Contractor shall state in proposal what requirements (if any) the Government would be responsible for, to ensure proposal viability to implement.

3.3 Existing WSTI will be removed and returned to 179 SFS. Ancillary hardware, cabling, etc. will be removed and disposed of by the contractor.

4.0 All local, state and federal regulations applicable to the manufacturing and installation of this type of equipment, apply to this requirement (EPA, OSHA, etc), as well solicitation provisions and clauses.

5.0 The following will be required of all contractor (prime or sub) personnel who will require base access to perform services related to this requirement:

5.1 Base Access Clearance Process: completion and submission of Security Access Form, which is submitted for background check; clearance is required for base access approval (this is accomplished post-award).

5.2 Antiterrorism Training: See attachment related to antiterrorism training requirements (accomplished post-award).

6.0 Site Visit: while site visit is not required, it is highly encouraged, due to the requirements of this project.

Contractor’s who plan to bid on this project but not attend site visit, should note the following provision applicable to this solicitation: FAR 52.237-1, Site Visit.