United States Department of the Interior
NATIONAL PARK SERVICE
Golden Gate National Recreation Area Fort Mason, San Francisco, California 94123
PROJECT #: FY20-002.
DATE: July 13, 2020
SUBJECT: Trees and Limbs Removal
LOCATION: East Fort Miley
Located at the corner of Veterans Dr. and E. Fort Miley Road in San Francisco CA, 94121.
(next to the VA Medical Center see attached Map)
PROJECT DESCRIPTION:
This project will consist of the elimination of approx. 13 Dead and partially dead Cypress and Pines trees. NPS inspected these trees and they were considered dangerous due to their location near parking lots, picnic areas and work zones. The trees are directly above pedestrian trails and a City Street
(Clement St.). In the past many branches have fallen off and caused damage to parked cars and can also be very hazardous for traffic on the street.
This project also included the removal of various dead and broken branches and all branches in decline.
Removing unnecessary crossed branches as needed under the tree canopy to reduce in size and create space for better air and light circulation. In addition, tree pruning will be beneficial to the health of the tree. All generated materials must be removed and chipped and transported off-site. (see map for marked pruning area)
These can be split into two projects as needed for available funding.
Tree 1: Tree is dead. Drop, limb and leave in place and cut logs in eight-foot sections.
Tree 2: Tree is 75% dead and overhanging Veteran’s trail. Drop, cut wood in eight sections and leave in place, pile all woodchips into the picnic area.
Tree 3: Tree is dead. Drop and pile chips into the picnic area cut the logs into eight-foot sections and leave in place.
Tree 4 and 5: Trees are dead. Drop and pile woodchips into the picnic area, cut the logs into eight-foot sections and leave them in place.
Tree 6: Dead. Drop, move to Bunker 5 area for chipper access, all woodchips must haul off site, cut the logs into eight-foot sections and leave them in place along trail.
Tree/Area 7: Up to 12 trees in this area need major limbs or trunks branches shall be removed.
Trees 8 and 9 Tree is dead. Drop, all chips haul off site, cut the logs into eight-foot sections and leave them in place along the trail.
Tree 10: Tree is 75% dead. Drop, all chips haul off site, cut the logs into eight-foot sections and leave them in place along the service road.
Tree 11: Tree is dead. Drop, all chips haul off site, cut the logs into eight-foot sections and leave them in place along the service road.
Tree 12: Tree is dead. Drop, all chips haul off site, cut the logs into eight-foot sections and leave them in place along the service road.
Tree 13: Tree is 75% dead and overhanging Clement St. Drop, all chips haul off site, cut the logs into eight-foot sections and leave them in place along the service road (priority).
The Contractor must agree with the following terms.
• The Contractor is required to provide a certificate of Liability insurance (COL) with the
NPS/GGNRA listed as Additional Insured before the start date.
• The contractor shall provide a safety work plan to be approved by the Park CO (Contracting
Officer) and Park Safety Officer prior to the commencement of the work. The safety plan should include all work-related safety procedures and fully identify or address how the contractor will protect the visitors, traffic control, and staff during the contracted work.
• The contractor must provide an approximate work schedule and completion timeline for this project once the start date has been determined.
• All material generated from this project shall be disposal or piled in selected areas as described above.
• The selected trees shall be cut as low is possible to the ground all work must be completed as prescribed above per each tree.
• The contractor will be responsible for managing and develop a plan for the traffic control for pedestrian, vehicles, and bicycles on Clement St. VA Center parking lots and Fort Miley roads.
• The Contractor is responsible for notifying the public for reserve parking spaces along Clement
St or any other parking areas.
• The contractor will provide with all labor, and necessary equipment for the above-mentioned project.
• The contractor shall be responsible to contact USAdig or other entities to mark any utilities on the work area if necessary.
• The contractor shall be responsible to acquire the proper permits from the city of San Francisco for any space used on Clement St. or any space used on the VA Medical Center parking lots.
• The Contractor is responsible for ensuring that all work is done in a safe and responsible manner using the appropriate equipment and techniques. The work to be performed shall be in full compliance with the most current safety standards.
• Any roads, trails, and walkways subject to interference by the work shall be kept open in a manner that provides for safe public use.
• Contractor shall maintain safety and control of the work site at all the time by creating perimeter control through fences or other means approved by the Project Manager.
• The Contractor shall be responsible for the provisions of barricades and safety guards, and any other structures or improvements necessary for the complete protection of the public or structures.
• Any damage done to either the city of San Francisco, Golf course or NPS property shall be the responsibility of the contractor to repair or to make arrangements to repair with the NPS approval. The repairs shall be done prior to final payment of Agreement.
• Noise ordinance will allow work to be conducted between the hours of 8:00am and 5:30pm
Monday to Friday. excluding Saturdays, & Sundays and Official Government holidays. No work, startup/warming up of equipment before 8:00am or after 5:30pm. Work cannot be performed outside of business hours unless approved by NPS representative.
• Contractor must be prepared for proper clean up, mitigate, and remedy, if necessary, for all spills of petroleum products, hazardous materials, or other chemical or biological products release from fleet, or other support vehicles or equipment. Respond in accordance with the
Hazardous Material Spill Prevention Plan for proper disposal.
• This project must be completed outside of bird nesting season between July 31 and March 31.
• East Fort Miley is part of GGNRA and is considered a historic site, additional precautions should be considered and directed by the NPS representative when driving heavy equipment near the Bunkers.
• The contractor is encouraged to conduct a site visit to familiarized with the project details and its location. Contact NPS COR representative for appointments.
• The contractor shall make a final inspection at the end of the project with an NPS representative to verify that the project was completed as directed.
• The contractor shall forward all emergency calls to 911, for any other situations that require law enforcement call the Park Police at the Non-emergency number (415)-561-5505.
• TEN-DAY NOTICE REQUIRED TO START THIS PROJECT UNLESS ALTERNATIVE
TERMS ARE AGREED.
Primary Contact: Reyes Rodriguez, Gardener Supervisor.
Email: reyes_rodriguez@nps.gov
Phone: 415-725-0064
Secondary Contact: Rudy Gustafson, Trails Supervisor.
Email: rudy_gustafson@nps.gov
Phone: 415-635-7493 mailto:reyes_rodriguez@nps.gov mailto:rudy_gustafson@nps.gov tree 1
Tree 2
Tree 3
Trees 4 and 5
Tree 6
Tree Pruning Area 7 (Next 8 Photos)
Trees 8 and 9
Tree 10
Tree 11
Tree 12
Tree 13