Attachment 02_Apendix A Manhole Sealing Drawings.pdf
PDF 31 MB Posted
- Attached to
- Red River Wastewater Solenoid
- Solicitation number
- 1282B123Q0156
- Issued by
-
Department of Agriculture Forest Service
About this file
This file is an appendix containing manhole sealing drawings related to solicitation number 1282B123Q0156 from the Department of Agriculture Forest Service. The solicitation is for Red River Wastewater Solenoid services. The 31MB appendix includes detailed drawings related to manhole sealing but does not specify any required products, response dates, pricing terms, or other salient contracting information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i w I
1s i w ii:
w o;:
(Y)
(0 a, L--------------------------"' ill. Revised _ SRG_ Dote3/25/23 £ Revised Dote Lh Revised Dote
PREPARED BY:
. rO-lMORRISON c:dJ MAIERLE,INC, ,fo .lmp(oi,,re-Ownlld t'lnn.JC"'lt'
-N-l o 2 r
SCALE IN FEET
RED RIVER RANGER STATION
WASTEWATER COLLECTION AND TREATMENT PROJECT
SANITARY SEWER KEY PLAN
Designed _ _Bjyl __ Oesign Checked __ IM__
REGION ONE Drown __ ¥_Q/i__Orawing Checked_Ji'!! __
DRAWINGNO. G-3
SHEET 3 OF 24
6. USE FLEXIBLE EPOXY LINER TO SEAL FOUR MANHOLES, A LIFT STATION, AND A SEWER METER VAULT AS
DESCRIBED IN THESE DRAWINGS TO PREVENT GROUND WATER INFILTRATION.
7. THE FEATURES TO BE LINED ARE HIGHLIGHTED ON THIS DRAWING.
MANHOLE D3
SEWER METER VAULT
MANHOLE SMH AB
MANHOLE D3
MANHOLE D3
sgraves Highlight sgraves Highlight sgraves Highlight sgraves Highlight sgraves Highlight sgraves Highlight
Provide Flexible Epoxy Liner
Highlight sgraves Highlight
20+00
I I r---: :
23+00
PROFILE
Scale: H· 1,, v: 1" 40' . = 10'
SMH-AB
REPEAT
SMH-BC
SMH-Bl
NOT DIMENSIONED
NOTES:
Use flexible epoxy liner to seal sides of SMH-BC
Excavate waterline valve box 10 feet from the Manhole SMH-BC install two 2" unions and 2" Drinking Water Valves and valve boxes on existing galvanized steel waterlines to the south and southwest of the tee in the waterline.
SRG 3/20/23
sgraves Highlight sgraves Highlight sgraves Highlight sgraves Highlight sgraves Highlight
PLAN
Scale: H: 1" = 40'
L-
SCALE IN FEET
-,------------------- M
-- � I ----------t------- ------------- -------------+ ------ - - - - -----------------------> --------------------------------+------- -- oo - -----------
SMH-D2
------------ ·------ --- -- m ------- + o -------s-----e-----------------------"---------------------------- -�----------------------------c----------u�.�1-----+------------------------- --------4- ----------------------------------,------------------� �--------+---------------- ---------- ----------,------------------- ----------------,--------------------------------+--------------------------------� r
I! = n
54+50 55+00 56+00
··· · · · · I � --+------- ----------------------------i--c. ... ---=------------- - -- -r----------------------:1--------------;--------------------------------------j----------------------------i-1--i-1 ------,-------------------�=-======-:=: ::==:=
---1 4325
_ Cl) ll:'. _ _ ___ ,.,..-_-··- ________________ I I
PROFILE
Scale: H: 1" = 40'
V: 1" = 10'
-141.74 LF of6" HOPE@ 1.00%
57+00
9.07'
58+00
Lh Revised. _ _ �Date __ £ Revised Date __ & Revised Date __
PREPARED BY:
. J:hM0RRIS0N a:iJMAIERLE,INC.
.An hlpl.�OwnriCbm�n�
SC£/fr'-!S
S!lfCE11HS
I CONTINUED ON
- I -------------------------� DWG SS-7
11- ---- - - =r.:- LF of 6" HOPE @ 1.00% =- ------�----- 4320
I L--
59+00 60+00
RED RIVER RANGER STATION
WASTEWATER COLLECTION AND TREATMENT PROJECT
LINE D SEWER PLAN & PROFILE
Designed _ _II __ Design Checked __ [M__ DRAWING NO. SS-6
REGION ONE Drawn __ �fi_Drawing Checked_�'!{__ SHEET 9 OF 24
NOTE:
Excavate Manhole SMH-D2 and seal exterior of manhole with epoxy or mastic sealer.
sgraves Highlight sgraves Highlight
,I <If
I
:1::; 4325 z ffi C> 4320 rB i5
Cl w fl.
UJ
vi UJ z
� 4300
UJ :c 6 4295
I
I
c) 69+50 Cl UJ
PLAN
Scale: H: 1" = 40'
1--------�-----------,----------r------------,-, --------,--------------r-- t--------r----
70+00 71+00
EXISTING GROUND PROFILE
OVER PROPOSED ALIGNMENT
72+00
PROFILE
Scale: H: 1" = 40'
V: 1" 10'
& Revised ___ Date =- £ Revised Date __ � Revised Date
PREPARED BY:
- ,.Q-, MORRISON
o:iJ MAIERLE,INC.
.Ani'mpl���p:,ni, 3)1-IN.!ll..t, �lll$t!l::l!•l'k:n:;(�� fliq40J}�*i-1)1
L- 2:°
SCALE IN FEET
REPEAT
SMH-El
SMH-E2
SMH-E3
RED RIVER RANGER STATION
WASTEWATER COLLECTION AND TREATMENT PROJECT
LINE E SEWER PLAN & PROFILE
Designed_.lI __ Design Checked __ [f.l_ DRAWING NO. SS-8
REGION ONE Drawn MOH Drawing Checked_�:{!__ SHEET 11 OF 24 L-------------------------------------------------------------------"""""'----------L----------------L-----------'
NOTE: Repair bottom of Manhole SMH-E2 at the bottom of the Channel on the North side of the manhole.
Leak at the pipe seal and low on the channel allows high ground water in into the Manhole during Spring highwater (see highlighted area). Grind area down and apply epoxy repair to bottomo f channel. See Next Page.
sgraves Highlight sgraves Highlight
MANHOLE STEPS
6" MN
MANHOLE STEPS
VARIES
4'-0" MAX
6" FLOOR
CONCRETE COLLAR DETAIL THIS SHEET
PRECAST MONOLITHIC
ECCENTRIC CONE SECTION
SEAL ALL LEAKING JOINTS
PLAN
4' ID _______ __.-1-----1--5• WALLS
SECTION A
PRECAST CONCRETE MANHOLE-
BARREL SECTION - SEAL THESE JOINTS
MANHOLE COLLAR
Scale: N.T.S.
liQIES:.
1. PROVIDE MANHOLE CONCRETE PRIMING AND SEALING AT
JOINTS TO PREVIENT HIGHGROUNDWATER INFILTRATION. REFER
TO DIVISION 9950 FLEXIBLE EPOXY COATING.
SANITARY SEWER MANHOLE DETAIL
Scale: N.T.S.
PLAN
COVER
RED RIVER RANGER STATION
WASTEWATER COLLECTION AND TREATMENT PROJECT
MANHOLE DETAILS
L1 Revised _SRG _ Date 3/25/2023
Sheet 6 of 24 sgraves Highlight
| RedRiverWastewaterSheets1thru11 3 |
| RedRiverWastewaterSheets1thru11 4 |
| RedRiverWastewaterSheets1thru11 5 |
File details come from the government source that posted it. Updated .