Attachment 0004 - Definitions Acronym List.pdf
PDF 179 KB Posted
- Attached to
- Maintenance Support Services
- Solicitation number
- W58RGZ-25-R-0004
About this file
This document is an Attachment 0004 - Definitions and Acronyms List related to Solicitation W58RGZ-25-R-0004 for Maintenance Support Services for the Royal Saudi Land Forces Aviation Corps (RSLFAC). It provides definitions of key terms and a list of acronyms used throughout the solicitation documents.
The solicitation is for a 5-year contract to provide complete maintenance and logistics support for RSLFAC's fleet of 8 CH-47 Chinooks, 42 AH-64 Apaches, 46 UH-60 Blackhawks, 12 406 Combat Scouts, and Schweizer 333 training aircraft, as well as related aviation ground support equipment. The contractor will also provide personnel for flight and ground operations, backshop support, property and supply management, and procurement. The contract is anticipated to be awarded no later than May 3, 2026 through full and open competition, with the potential for a small business set-aside. The government is seeking responses from interested parties by November 20, 2024 detailing their capability to perform the required services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation
W58RGZ-25-R-0004
Attachment 0004 Definitions and Acronyms List
Maintenance Support Services - RSLFAC August 28, 2024
Definitions & Acronyms List W58RGZ-25-R-0004 Attachment 0004
8/28/24 2
Change History
Revision Date Changes 15 March 2024 Original Issue for RFP.
24 March 2024 Added Qualified Repair Sources definition.
16 April 2024 Post legal review; realigned list.
28 August 2024 Updated formatting and made minor grammatical edits.
8/28/24 3
Reviews & Approvals
Prepared by:
MARCK.DAVID.
W
JR.1074523664
Digitally signed by
MARCK.DAVID.W
JR.1074523664
Date: 2024.08.28 10:50:58 -05'00'
DAVID MARCK JR., CFCM
Contract Analyst Apache Division CENTCOM A Aviation Directorate, SAMD david.w.marck2.civ@army.mil
Digitally signed by
ALMAHDI.GHADA.ABDUL
Approved by: L HAMEED.1517584688 HAMEED.1517584688 Date: 2024.09.03 12:35:02 -05'00'
GHADA ALMAHDI
Branch Chief (Acting) Apache Division CENTCOM A Aviation Directorate, SAMD ghada.a.almahdi.civ@army.mil
ALMAHDI.GHADA.ABDU
mailto:david.w.marck2.civ@army.mil mailto:ghada.a.almahdi.civ@army.mil
8/28/24 4
1 Definitions
Causative Research: An investigation of discrepancies to include a complete review of all transactions occurring since the last completed inventory. The purpose of causative research is to identify, analyze, and evaluate the cause(s) of inventory discrepancies to eliminate repetitive errors. Causative research ends either when the cause is found or after the review of transactions back to the last inventory are reconciled and there have been no conclusive findings identified.
Ceiling Price: Price in the contract or order that the contractor exceeds at its own risk.
Complete: Having all necessary parts, elements and steps fully carried out; concluded;
brought to an end; no other steps remain.
Comprehensive Management Plan (CMP): Contractor plan encompassing the total management approach for achieving the contract requirements and ensuring total contract performance.
Component: A group of physically connected assemblies or parts, which is capable of independent operation but may be externally controlled, or derives its power from another source, and, when combined with other components, assemblies, and parts, forms a functional group or end item.
Consumable Item: Parts or materials which are consumed by usage or have one- time usage, normally losing identity upon application with, and/or assembled into the equipment.
Contracting Officers Representative (COR): A person designated in writing which represents the PCO in the day-to-day operations of the contract. See COR letter for specific authority.
Critical parts: Parts where supply status is received, and the estimated shipping date exceeds the required delivery date.
8/28/24 5
Depot Repair: Maintenance involving the overhaul of economically repairable material to augment the procurement program in satisfying overall requirements when required to provide for repair or material beyond the capability of AVIM maintenance organizations. Depot maintenance includes performance of tests and inspections in support of National Inventory Control Point (NICP) requirements and National
Maintenance Point (NMP) standards.
De-puddling: Is the process of removing residual fuel from cells/tanks after defueling.
Depot Repair: Maintenance involving the overhaul of economically repairable material to augment the procurement program in satisfying overall requirements when required to provide for repair or material beyond the capability of AVIM maintenance organizations. Depot maintenance includes performance of tests and inspections in support of National Inventory Control Point (NICP) requirements and National
Maintenance Point (NMP) standards.
De-puddling: Is the process of removing residual fuel from cells/tanks after defueling.
Field Maintenance: Maintenance performed, consisting of high frequency on or off the aircraft tasks required to retain or return aircraft to a Fully Mission Capable (FMC) condition. Categories of maintenance shall be as identified by the Maintenance
Allocation Chart (MAC) in applicable publications.
Ground Government Flight Representative (GGFR): The Government representative responsible for maintaining surveillance of a Ground and Flight Risk (known as GFRC) for ground operations.
Maintenance Engineering Call (MEC): Used to address deviations from prescribed maintenance procedures and/or inspection criteria, processes, and/or procedures in the appropriate maintenance technical manual (hard copy and electronic media, all versions) for the end item.
Maintenance engineering order (MEO): a change to authorized maintenance
8/28/24 6 practice(s) to ensure continuous airworthiness and serves as a publication change document. It is used to update, correct, or change the current prescribed technical and/or maintenance procedures, inspection criteria, and processes in the appropriate technical manual (hard copy and electronic media, all versions) for the end item.
Maintenance Operational Check (MOC): Checks accomplished on the ground through engine run-up, aircraft taxiing or use of auxiliary power or testing equipment, in such a manner as to simulate, insofar as possible, conditions under which the system is to operate to assure the aircraft systems or components which were disturbed during an inspection or maintenance action, have been repaired, reassembled or adjusted satisfactorily.
Man-Hours (MH): Direct Labor as measured in man-hours is labor expended in direct support of an aircraft/AGSE work order or in direct support of a back shop work order. It does not include indirect or non-productive time.
Material: Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling and special test equipment.
Modification: Any postproduction alteration of a permanent nature done to an end item, component, assembly or support equipment.
One-Time Repair (OTR): An authorization by AMC to provide a maintenance organization with a one-time authorization to perform maintenance to the national maintenance standard on an item of equipment when it is in the Army’s operational and/or readiness interest or critical to mission accomplishment.
Primary Work Site: Base location established by the contract in which the employee is required to perform the work to be accomplished.
8/28/24 7
Procurement Contracting Officer (PCO): A person who either by virtue of his/her position and appointment has the authority to enter into and administer contracts and make determinations and findings with respect thereto. The PCO is the only person with authority to make changes to the contract and bind the Government.
Program Management Review (PMR): Government and Contractor joint meeting to include program management personnel from both sides where recent historical contract performance is analyzed, and actions are taken to resolve issues or enhance future contract performance.
Qualified Repair Source: Sources with documented approval from the Original
Equipment Manufacturer USG repair depots; commercial vendors licensed by the
United States Federal Aviation Administration (FAA) and the European Joint Aviation
Authorities (JAA); commercial vendors licensed by other national authorities internationally recognized to license such repair work; Saudi Arabian commercial vendors licensed by the Presidency of Civil Aviation or one of the previously mentioned licensing authorities; and other repair sources whose repair capabilities have been reviewed and approved by RSLFAC and provided as an update to the COR and shared with the contractor.
Residence: An employee’s "residence is defined as that employee’s residence prior to commencing work at a site.
Safety-of-Flight Condition: One in which failure or malfunction would present a hazardous condition to the end item or personnel during pre-flight, in-flight or post- flight aircraft operations.
Serviceable: Capable of meeting the requirement and performing the function for which it was designed and meets all test requirements established by the Work Specification.
Special Processes: Processes that include but are not limited to Flight-line driving, fuel handling, brush plating, confined space, aircraft flight control rigging by MDS, Fuel
8/28/24 8 system maintenance by MDS, respirator (to include fitting), cold working structural repair process, packaging of HAZMAT for shipment, painting of aircraft, and any other processes requiring work specific training.
Sustainment Level Maintenance: Maintenance performed on material requiring a complete rebuild of parts, assemblies, subassemblies and end items, including the fabrication of parts, modification, testing and reclamation.
Technical Bulletins (TB): A publication used to provide supplementary information to
TMs. TBs may contain such things as maintenance expenditure limits, equipment improvement recommendation material, functional group code information, general information procedures for kit installation or special mission changes to material, warranty information, schematics and/or diagrams to supplement an IETM, ammunition information, and so forth. TBs do not contain operator or maintenance instructions, are not used for quick reference guides or other similarly named publications, are not used in lieu of operator or maintenance manuals or to change them, and do not contain parts information.
Technical Manuals (TM): The Aviation Unit Maintenance (AVUM), Aviation
Intermediate Maintenance (AVIM), Technical Manual -23 series (IETM), Repair Parts and Special Tools List (RPSTL), Supplemental Manuals, Military Standards (MIL-STDS), Modification Work Order (MWO), Air Worthiness Release (AWR), Field Procedures, and
Directives.
Temporary Work Site: A location where the employee is required to perform work on a short-term basis and is required to travel to the work site to accomplish the work, and then return to his/her primary work site.
Uncommon Personal Protective Equipment (PPE): Any PPE that is not required by a majority of the work force in performance of this Contract.
Work Requirement: Negotiated work package described in this document.
8/28/24 9
2 Acronyms
ACC Army Contracting Command
ACO Administrative Contracting Officer
AFCS Automatic Flight Control System
AGSE Aircraft Ground Support Equipment
ALSE Aviation Life Support Equipment
AMAM Aviation Maintenance Advisory Messages
AMCOM Aviation and Missile Command
AMIM Aviation Maintenance Information Message
AOG Aircraft on Ground
AOR Area of Responsibility
AR Army Regulation
ASAM Aviation Safety Advisory Message
ASE Aircraft Survivability Equipment
ATE Automated Test Equipment
ATP Army Techniques Publication
ATSC Advanced Test Program Set Software Changes
AVIM Aviation Intermediate Maintenance
AVUM Aviation Unit Maintenance
BER Beyond Economical Repair
BNCOC Basic Non-Commissioned Officer Course
CDRL Contract Data Requirements List
CFR Code of Federal Regulation
CFSR Contractor Field Service Representative
8/28/24 10
CLIN Contract Line-Item Number
CNE Certified Netware Engineer
COLA Cost of Living Allowance
CONUS Continental United States
DAASC Defense Automated Addressing System Center
DAMES Defense Automated Message Exchange System
DCMA Defense Contract Management Agency
DLA Defense Logistics Agency
DLI Defense Language Institute
DMA Directed Manning Augmentee
DOD Department of Defense
DODD Department of Defense Directive
DA PAM Department of the Army Pamphlets
DSL Document Summary List
DSSA Depot Supply Support Activity
ECP Engineering Change Proposals
EETF Electronic Equipment Test Facility
FAA Federal Aviation Administration
FAR Federal Acquisition Regulations
FEDLOG Federal Logistics Data
FFP Firm Fixed Price
FMS Foreign Military Sales
FOP Flight Operating Procedure
FOUO For Official Use Only
FT Functional Test
8/28/24 11
G&A General and Administrative
GFE Government Furnished Equipment
GFP Government Furnished Property
GOP Ground Operating Procedure
GSSA General Supply Support Activity
HAZMAT Hazardous Material
HQDA Headquarters, Department of the Army
IAW In Accordance With
IETM Integrated Electronic Technical Manuals
ILS Integrated Logistics Services
IP Internet Protocol
JAA Joint Aviation Authority
JTR Joint Travel Regulation
KKMC King Kahlid Military City
KSA Kingdom of Saudi Arabia
LOA Letter of Offer and Acceptance
MEL
MOD
Maximum Expenditure Limit
Ministry of Defense
MODA MOS Ministry of Defense Aviation Military Occupational Specialty
MSS Maintenance Support Services
MTFE Maintenance Test Flight Examiner
MTP Maintenance Test Pilot
MWO Modification Work Orders
NDI Non-Destructive Inspections
NISPOM National Industrial Security Program Operating Manual
8/28/24 12
NOR Notices of Revision
NTE Not to Exceed
NVD Night Vision Devices
OCONUS Outside the Continental US
OJT On-the-Job Training
OEM Original Equipment Manufacturers
PC Production Control
PCO Procurement Contracting Officer
PD Position Description
PDSSF Post Deployment Software Support Facility
PGSE Peculiar Ground Support Equipment
PLL Prescribed Load List
PMO Program Management Office
PMR Program Management Review
POE Port of Entry
PO Purchase Order
POL Petroleum, Oil, and Lubricants
PQDR Product Quality Deficiency Report
PRs Purchase Requests
PSS Personnel Support Services
QAS Quality Assurance Specialist
R&R Repair and Return
RC Recoverability Code
RSLFAC Royal Saudi Land Forces Aviation Corp
SAG Saudi Arabian Government
8/28/24 13
SAMD Security Assistance Management Directorate
SDR Supply Discrepancy Report
SOF Safety of Flight
SOFA Status of Forces Agreement
SOP Standard Operating Procedure
SOW Statement of Work
STTE Special Tools and Test Equipment
SRD Systems Readiness Directorate
SV Saudi Airlines
TAA Technical Assistance Agreement
TAMMS The Army Maintenance Management System
TAT Turn Around Time
TB Technical Bulletins
TCN Third Country National
TCP Transport Control Protocol
TDE Tear-Down-Evaluation
TDY Temporary Duty
TM Technical Manuals
TMDE Test, Measurement, and Diagnostic Equipment
TPS Test Program Set
TSS Technical Support Services
USG United States Government
WEB RoR Web Repair of Repairables
| Prepared by: |
| Approved by: |
File details come from the government source that posted it. Updated .