Attachment 0002 - Tritium Data Requirements.pdf
PDF 10 KB Posted
- Attached to
- Indicator, Range
- Solicitation number
- W56HZV-22-R-0131
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Performance/Data Requirements 29Sep11
Lamp Brightness
The specified brightness data for the lamps being purchased is called out on the drawings referred to by the contract instrument.
1. The contractor shall furnish actual lamp brightness data of the lot received, and the date it was measured. This data shall be known as “initial lamp brightness data” and shall be obtained from the lamp vendor’s data prior to their shipment, or measured when the sources arrive at the assembly facility. The obtained data shall be recorded and maintained till the end process is completed.
2. Upon completion of assembly processes prior to shipment, and not less than 30 days from the initial brightness measurements, the contractor shall again measure actual lamp brightness, record the data and date it was measured. Lamp brightness measurements shall be within drawing specifications.
3. This end state date, the initial data, and final Wipe Test results required by the contract shall be submitted IAW the Contract Data Requirements List (CDRL).
4. The above procedure applies only to the lamp brightness requirements notes on the drawing.
5. All records of obtained actual data shall be available for audit by the Government.
Other Drawing notes and requirements
All other drawing notes and requirements shall be complied with and certified via COC by the assembly producer.
All references to lamp illumination measurement data stated in accompanying QAPs are rescinded and replaced by the above requirements.
File details come from the government source that posted it. Updated .