Francis Marion & Sumter National Forests, Long Cane Ranger District FATS Skinny Trail Maintenance
SECTION C. STATEMENT OF WORK
DIVISION 1 – GENERAL REQUIREMENTS
01010 – SUMMARY OF WORK
Complete maintenance on FATS Skinny Trail, per description below, and attached work items list and drawings.
This work is to be completed by a professional trail construction and maintenance contractor with the experience and abilities which include a minimum of three years of professional trail construction/maintenance experience and successful completion of at least three trail construction/maintenance contracts.
Total trail maintenance length is approximately 6.6 miles and includes a connector trail to parking lot. The trail tread will be restored to single track tread with approximate width of 2 feet.
The work includes heavy, moderate, and light maintenance activities as described below:
Heavy maintenance consists of using machines, such as a mini-excavator, to install earthen water diversion structures. These structures consist of rolling grade dips and knicks (grade dips), used to divert water off existing trails to reduce erosion. The structures are constructed with native soil harvested using borrow pits within the 10 foot-wide trailway. Seeps and other wet areas of the tread will be surfaced with crushed slate or rock armored using the pitched stone method. Some problem locations will be repaired with a trail realignment, within the exiting trail prism. Two trail reroutes are also required, outside the trail prism. Abandoned trail segments will require obliteration. Wood decking is to be replaced on two small bridges.
Moderate maintenance consists of clearing berms and existing drains with a machine. Re-grade existing tread and backslopes to establish proper sustainable slope angles, and trail grade.
Light maintenance consists of hand crew following behind machine operators and performing finish work on trails. Finish work includes raking, shoveling, and compacting and shaping soil. Naturalize the area by placing leaf litter, branches, and other forest debris in areas outside of the tread impacted by machine work.
Location: Forest Service FATS (Forks Area Trail System) Trailhead on Woodlawn Road, in Edgefield County, SC. There is no street address.
See attached location map
Additional directions:
From I-20 Exit 1 (North Augusta): Drive north on SC 230 for approximately 5.5 miles and turn left onto Woodlawn Road (S-19-53). The parking area is 3.8 miles on the left.
From Augusta: Drive north on SC 28 for approximately 8.5 miles and turn right onto Hopewell Church Road/Deep Step Road (S-33-112). Drive 3.3 miles and turn right onto Woodlawn Road and the parking area is on the right.
Latitude/Longitude of parking lot: 33.608061, -82.079694
01300 – SUBMITTALS
Submittals shall include the following unless otherwise required in the specification:
| 1. | Dates and revision dates. |
| 2. | Project name and contract number. |
| 3. | Names of contractor, subcontractor, supplier and manufacturer. |
| 4. | Contractor's stamp, initial or signature, certifying the review of submittal. |
| 8. | Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification. |
The following submittals are required:
| Title |
| Applicable Contract clause or Specification |
| Time for Government Approval After Submittal |
| Proposed Progress Schedule |
| Schedules for Construction Contracts |
[FAR 52.236-15]
7 days
| Designation of Contractor's Representative |
| Superintendence by the Contractor |
[FAR 52.236-6]
7 days
| Drug Free Workplace Policy |
| Drug-Free Workplace |
[FAR 52.223-6]
7 days
| SF1413 - Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorship Subcontractors [not required for material suppliers] |
| Subcontracts (Labor Standards) |
[FAR 52.236-11]
Before "Notice to Proceed" is issued.
| Submit specifics on materials to be used on the project: slate aggregate type, rock for armoring, decking boards. |
| Section |
Submit to COR for concurrence before purchasing materials
01510 – TEMPORARY UTILITIES
A. Electricity – Contractor shall plan to use a portable generator if power is needed.
B. Water –Contractor shall plan to bring water for crew drinking water needs. A trailhead handpump is currently operational.
C. Sanitary – Vault toilets are located at the trailhead.
01635 – PROTECTION OF ADJACENT AREAS
A. The Contractor is responsible for repairing all damage to areas caused by their activities or equipment at no additional cost to the government as directed by the Contracting Officer (CO).
Relevant Standard Forest Service Specifications for Trail Construction / Maintenance:
Section 910—Trailways
Section 911 - Trail and Prism Description
911.00.01 This work consists of constructing trails, restoration of existing trails or obliteration of abandoned trails. The earthwork and associated trail tread and prism work may be covered by one or more of the following subsections:
| 911.10. | Excavation and Embankment |
| 911.20. | Borrow |
| 911.30. | Existing Trail Restoration |
| 911.40. | Slide Maintenance |
| 911.50. | Slough and Berm Removal |
| 911.60. | Obliteration of Abandoned Trails |
| 911.70. | Retainers |
Measurement
911.00.02 Measures will follow the Summary of Work, work items list, and drawings.
Payment
911.00.03 Payments will be Lump Sum Quantity per the Schedule of Items and section 911.00.02. Partial payments can be approved by the Contracting Officer’s Representative (COR) for materials delivered and work completed.
911.10 - Excavation and Embankment Description
911.10.01 This work consists of the excavation and placement of excavated material, regardless of its nature, from within the trailway or from other sources, except for material included under other pay items SHOWN IN THE SCHEDULE OF ITEMS.
Includes excavation, embankment, and backfill construction required to shape and finish the trailbed, ditches, backslopes, fill slopes, drainage dips, trail passing sections, and turnouts. Also includes excavation and embankment work required to construct culverts, trail bridges, shallow stream fords and gully crossings, talus and rubble rock sections, and climbing turns.
Materials
911.10.02 Materials. Use materials meeting the requirements of the following sections:
| Rock, Grid Pavement Units, and Aggregate | 991 | ||
| Geosynthetics | 994 | ||
| Material for Timber Structures | 995 |
Construction
911.10.03 Use and Disposal of Excavated Material. Conserve and use all suitable material for specified work. Conserve excess excavated rock suitable for specified project work and use in place of materials from designated sources.
Remove all duff and debris from within trailway limits and uniformly spread outside the clearing limits, not more than 4 inches in depth (unless otherwise SHOWN ON THE PLANS). Do not obstruct drainage or create piles, berms, or windrows of debris.
Place excess and unsuitable excavation beyond the downslope edge of the trailbed Do not obstruct drainage and spread to a depth not exceeding 4 inches. This includes any material removed in the grubbing operation and deposited in the same area.
Place rocks over 4 inches in greatest dimension not used in construction beyond the hinge point on the downslope side. Place rocks so that the tops are at least 6 inches lower than the trailbed surface. Ensure that no blockage of drainage or creation of a windrow effect occurs.
911.10.04 Trailway Excavation and Embankment. Minor deviations of ± 12 inches in vertical alignment and 36 inches in horizontal alignment with smooth transitions of at least 30 feet on each side of the deviation are acceptable unless otherwise SHOWN ON THE PLANS.
Construct embankments with suitable compacted material. Compact all disturbed soil within the trailbed area.
Remove any rock within or above the backslopes that is unstable. Use or dispose of rock in accordance with Subsection 912.03.
Leave the finished slope in a uniform and roughened condition.
Make necessary adjustments of horizontal or vertical alignment, within the tolerances specified in this subsection, to produce the designed trailway section and balance earthwork. Such adjustments shall not be considered as changes.
911.10.05 Trailbed Finish. Fill holes with suitable material, compact, and cut high points to provide a uniform trailbed finish.
911.10.07 Ditches. Construct ditches to be free of loose rocks, roots, sticks, and other obstructions.
911.10.08 Geosynthetics. Where SHOWN ON THE PLANS, place geosynthetics flat and parallel to centerline of the trail before placing embankment. Overlap geosynthetics a minimum of 24 inches. Install anchors or fasteners as recommended by the geosynthetic manufacturer.
911.20 - Borrow Description
911.20.01 This work consists of placing select borrow material on the trailbed.
Materials
911.20.02 Requirements. Obtain borrow materials from locations SHOWN ON THE PLANS or DESIGNATED ON THE GROUND. Obtain CO's approval before using borrow from other locations. Suitable material from slough and berm removal may also be used as borrow material. Use suitable borrow material and aggregate under 2 inches in the greatest dimension.
Construction
911.20.03 General. On sideslopes where water can drain away from the trailbed, provide a sufficient depth of borrow material to obtain the outslope as SHOWN ON THE PLANS.
Across meadows and on turnpike sections, provide a sufficient depth of borrow material to produce a crowned trailbed as SHOWN ON THE PLANS.
Compact all material placed. Compact borrow material placed on the approaches of bridges and puncheon to provide a smooth surface and a smooth transition from the structure to the adjoining trail tread surface.
Cover any culvert surfaces that have become exposed with a minimum depth of 6 inches of suitable material over the full length of the exposed culvert and of sufficient length along the trail to present a uniform trail grade.
Provide free-draining borrow sites and backslopes no steeper than 1 1/3:1.
911.30-Existing Trail Restoration Description
911.30.01 This work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring drainage and other trail structures, constructing check dams, and removing protruding rocks, roots, stumps, slough, and berms.
Construction
911.30.03 Clearing and Grubbing. Clear and grub in accordance with the requirements of section 912 and as SHOWN ON THE PLANS.
911.30.04 Excavation and Embankment. Excavate and place all excavated material in accordance with the requirements of section 911.10.04 and as SHOWN ON THE PLANS.
911.30.05 Rock and Root Removal. Uniformly scatter the removed rocks and roots below the trailway and distribute to ensure no blockage of watercourses or creation of a windrow. Fill holes with suitable material and compact.
911.30.06 Slough and Berm Removal and Excess Material. Use suitable slough and berm material within the trailway to restore the trailbed as SHOWN ON THE PLANS. Place all unsuitable and excess material beyond the downslope edge of the trailbed and uniformly spread to a depth not exceeding 4 inches and so as not to obstruct drainage or interfere with the drainage of outsloped tread.
Remove berm when daylight can be obtained within a distance of 5 feet from the outslope edge of finished tread unless otherwise DESIGNATED ON THE GROUND or SHOWN ON THE PLANS.
911.30.07 Fill Material and Borrow. Use suitable material to fill ruts, troughs, and potholes in the tread that cannot be leveled and outsloped through performance of work in Subsection 915.06. Compact and shape as SHOWN ON THE PLANS.
Obtain borrow from areas SHOWN ON THE PLANS or DESIGNATED ON THE GROUND.
911.30.08 Drainage. Restore drainage dips and ditches to reestablish drainage as SHOWN ON THE PLANS by removing obstructions such as rocks, roots, and sticks to make ditches and culverts free draining.
Restore rock spillways in accordance with section 923 and as SHOWN ON THE PLANS.
911.30.09 Stream Channel Cleaning. Clean channel of obstructions in areas SHOWN ON THE PLANS. Remove debris and rocks from the stream channel and scatter outside of the side slopes of the stream channel and beyond the clearing limits.
911.30.10 Check Dams. When constructing check dams for gullies, use dimensional lumber, sound peeled logs, or a row of stones placed across the gully in the subgrade with the ends securely embedded in the banks as SHOWN ON THE PLANS and at locations STAKED ON THE GROUND.
Use suitable material for backfill as SHOWN ON THE PLANS. Place and compact backfill to meet the density of the existing trailbed and to form a smooth tread.
911.30.11 Switchbacks. Restore switchbacks in accordance with section 914 and as SHOWN ON THE PLANS.
911.30.12 Waterbars. Restore waterbars in accordance with section 922 and as SHOWN ON THE PLANS. Reestablish drainage by removing accumulated material and replacing loose or missing rocks, unsuitable logs, and deteriorated rubber belting.
911.30.13 Turnpikes. Restore turnpikes in accordance with section 913 and as SHOWN ON THE PLANS by replacing missing, rotten, or loose retainer logs and stakes, or missing or loose retainer rocks. Backfill with suitable material.
911.30.14 Trail Structures. Restore all trail structures at locations SHOWN ON THE PLANS or DESIGNATED ON THE GROUND.
911.30.15 Reshaping and Finishing Trailbed and Backslopes. Provide a firm and uniformly finished trailbed in accordance with cross-sections SHOWN ON THE PLANS.
Provide a uniform and roughened surface on disturbed backslopes in accordance with cross-sections SHOWN ON THE PLANS. Cut all roots flush.
911.50 - Slough and Berm Removal Description
911.50.01 This work consists of the removal and disposal of slough and berm material that has accumulated on the trailway.
Construction
911.50.02 Slough and Berm Removal and Excess Material. Remove all slough material within the trailway. Remove all material from the trailbed when daylight can be obtained within a distance of 4 feet from the outsloped edge of the finished tread unless otherwise DESIGNATED ON THE GROUND or SHOWN ON THE PLANS. Conserve and use suitable material to restore the trail tread as SHOWN ON THE PLANS.
Place all excess and unsuitable material beyond the downslope edge of the trailbed. Uniformly spread to a depth not exceeding 4 inches and do not obstruct drainage or interfere with the drainage of outsloped tread.
911.60 - Obliteration of Abandoned Trails Description
911.60.01 This work consists of removal and disposal of existing structures, including turnpikes, walkways, bridges, culverts, signs and posts, and other material within the trailway, above or below ground. Work also includes salvaging DESIGNATED materials and backfilling the resulting trenches, holes, and pits.
Section 912 - Clearing Limits Description
912.00.01 This work consists of clearing, grubbing, trimming, removing, and treating trees, logs, limbs, branches, brush, plants, and other vegetation along with removal of rocks, undermined roots and hazard trees within the clearing limits. Clearing and removal of trees, vegetation and rocks may be covered by one or more of the following subsections:
| 912.10. | Clearing and Grubbing |
| 912.20. | Brush Cutting |
| 912.30. | Logging Out |
| 912.40. | Hazard Tree Removal (primarily applicable to this contract) |
| 912.50. | Loose Rock Removal |
| 912.60. | Rock and Root Removal |
Measurement
912.00.02 Measures will follow the Summary of Work, work items list, and drawings.
Payment
912.00.03 Payments will be Lump Sum Quantity per the Schedule of Items and section 911.00.02. Partial payments can be approved by the Contracting Officer’s Representative (COR) for materials delivered and work completed.
912.10 - Clearing and Grubbing Description
912.10.01 This work consists of clearing, grubbing, trimming, removing, and treating trees, logs, limbs, branches, brush, plants, and other vegetation within the clearing limits. Work includes the felling and treatment of designated trees outside the clearing limits. Also, included are the protection from injury or defacement of trees and other objects not designated for removal and treatment of damaged trees.
Construction
912.10.02 Clearing Limits. Clear to the dimensions SHOWN ON THE PLANS or 12 inches beyond the fill and backslope catch points, whichever is greater.
912.10.03 Material to Be Cleared. Remove and dispose of trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits, except for the following:
a) Live, sound, and firmly rooted trees of the size SHOWN ON THE PLANS.
b) Live brush, herbaceous plants, and trees between the trailway and the clearing limits that are less than 12 inches in height and less than ½ inch in diameter at ground line.
Except as provided above, cut all limbs and branches more than ½ inch in diameter that extend into the clearing limits. Cut limbs flush with the tree trunks or stems or cut at the ground surface as SHOWN ON THE PLANS.
Fall and limb designated trees.
912.10.04 Damaged Trees. When felling, cutting, or trimming, do not cause bark damage to standing timber. If damage does occur to standing trees, treat the injured trees as SHOWN ON THE PLANS. Remove and dispose of trees with major roots exposed by construction that are rendered unstable.
912.10.05 Removal of Stumps. Remove all stumps within the trailbed. Remove stumps located between the edge of the trailbed and the edge of the trailway that cannot be cut flush with the finished slope or that are not tightly rooted.
912.20 - Brush Cutting Description
912.20.01 This work consists of removing brush, trees less than 4 inches in diameter, and shrubs within the clearing limits.
Construction
912.20.02 General. Remove all limbs of shrubs and trees that extend across or into the clearing limits as SHOWN ON THE PLANS. Saw or cut limbs flush with the tree trunk. Make cuts in a manner that will not tear or strip bark from the trees.
Cut and remove from the clearing limits all woody plants exceeding ½ inch in stem diameter or 12 inches in height. The maximum size material to be cut under this specification is 4 inches in diameter when measured at a height of 6 inches above the ground on the uphill side of the stump.
Cut all brush and small, woody plants as near flush to the ground surface as possible. When impractical to cut plants flush, the maximum stem length shall be 2 inches.
Remove all woody material for a minimum of 3 inches below the trail tread surface. Fill holes in the trail tread caused by removing woody material with suitable material.
Scatter the clearing debris removed from the clearing limits outside and below the clearing limits. Do not place materials in stream channels, drainage ways, ditches, culvert inlets, or other locations where they would prevent the free flow of water away from the trailbed.
912.30 - Logging Out Description
912.30.01 This work consists of removing brush, logs, and down trees from the clearing limits.
Construction
912.30.02 Clearing Out. Cut and remove all logs that extend across or into the clearing limits. The portions of cut logs that remain on the upper side of the trail shall be either firmly anchored to prevent sliding or rolling onto the trailway or moved across the trail to the lower side and scattered outside the clearing limits.
Fell all trees over 4 inches in diameter that are leaning into the clearing limits and that are within 10 feet above the trailbed. Stump height of leaning trees that are cut outside the clearing limits shall not exceed 12 inches as measured on the uphill side of the stump. Disposal and payment for the leaning trees described above will be the same as for down logs and trees.
Remove roots and stumps from trees within the trailway that have been uprooted.
Rerouting the trail around windfalls, uprooted trees, and other obstacles will not be permitted. Ramp or reroute sections of the trail tread that have been damaged by uprooted stumps as necessary to provide safe passage on the trail. Payment for such work will be incidental to the specified work item, and no extra payment will be made.
Remove sticks or wood chunks exceeding 2 inches in diameter and 12 inches in length that have fallen onto the trailbed.
Scatter the down trees on the lower side of the trailway outside the clearing limits. Do not place such materials in stream channels, drainage ways, ditches, culvert catch basins or other locations where they would prevent the free flow of water away from the trailbed.
912.40 - Hazard Tree Removal Description
912.40.01 This work consists of felling, bucking, and limbing trees and scattering slash.
Construction
912.40.02 Hazard Trees. Remove trees and snags that are broken off or that are in a leaning, unstable position over the trailway to designated areas as SHOWN ON THE PLANS. Cut designated danger trees so that stump heights do not exceed 12 inches as measured on the uphill side of the stump. Maximum stump height of designated trees within 4 feet of the trail centerline is 4 inches. Do not leave felled trees parallel with the trail unless there are sufficient barriers to keep them from rolling or sliding onto the trail. Lop limbs to reduce slash concentration and scatter the clearing debris outside and below the clearing limits. If the trunk or a portion thereof, falls within the trailway, remove that portion within 4 feet of either side of the trail centerline and scatter a minimum distance of 4 feet beyond and below the trail centerline.
991.06 Crushed Aggregate for Base or Surface Course. Use crushed slate aggregate shown on drawings and work items list. Submit proposed aggregate mix to COR for approval prior to purchase.
994.06 Fasteners. Use anchors or fasteners of the design recommended by the manufacturer, and install per manufacturer's specifications.
995.04 Treated Structural Timber and Lumber. Furnish wood according to Subsection 995.01. Incise all wood and make all dimensional cuts and holes in the wood before pressure treatment. Use wood preservative treatment methods meeting the requirements of AASHTO M 133 as SHOWN ON THE PLANS. Treat dimensional lumber, sawn timber and glued laminated timber members according to AWPA Standards as SHOWN ON THE PLANS.
All treated stringers, decking, running planks, and handrails shall be treated after fabrication in accordance with AWPA U1, Use Category System, using Pentachlorophenol or Copper Naphthenate (CuN) in Light Oil, (Type C Solvent) for Use Category UC3B. [COR Note: this section is out of date; treatment type will be commercially available for outdoor decking] Treat timber members shall comply with the requirements of the current edition of WWPI’s Best Management Practices for the Use of Treated Wood in Aquatic Environments.
Except for pine, incise before treatment all surfaces greater than 2 inches in width and all Douglas fir and western larch surfaces. Field treat all cuts, abrasions, drilled holes, and recesses that occur after initial preservative treatment in accordance with the requirements specified in AWPA standard M4, Standard for the Care of Pressure-Treated Wood Products. Plug all unused holes with preservative-treated plugs. Perform all field-applied preservation treatment with necessary precautions so as to prevent soil and/or water contamination.
All treated timber members must have an approved American Lumber Standards Committee quality mark, individually or sealed pallets, assuring that treatment conforms to the appropriate AWPA standards.
Handle treated timber according to the Consumer Information Sheet published by AWPA. Do not cut, frame, or bore treated timber after treatment unless approved by the CO. Handle treated timbers carefully and do not drop, damage outer fibers, or penetrate the surface with tools. Do not use cant dogs, hooks or pike poles. In coastal waters, do not cut or bore timber below the highwater mark.
END OF SECTION C