Attach I - Lane Closure.pdf

PDF 409 KB Posted

Attached to
OnCall Sidewalk & Catch Basin Clarendon
Solicitation number
5400030083
Issued by
Richland County, South Carolina

About this file

This is a Lane Closure attachment document related to the OnCall Sidewalk & Catch Basin project in Clarendon, South Carolina. The document provides guidance and requirements for managing lane closures during construction activities associated with sidewalk and catch basin work. The attachment establishes procedures for road closure protocols, traffic management considerations, and notification requirements that contractors must follow when work impacts roadways or traffic flow in the project area.

The document specifies operational standards for lane closures, including advance notice requirements, traffic control measures, and coordination procedures with local authorities. Contractors are required to minimize disruption to public access and maintain safety protocols during any lane closure activities. The attachment serves as a reference document to ensure consistent application of closure procedures across the OnCall contract and to protect public safety while allowing necessary construction work to proceed.

View the file

Other files

File Type Posted
Attach D - NEW ZION.pdf PDF
Attach F - ALCOLU.pdf PDF
Attach G - Sec 720.pdf PDF
Solicitation.pdf PDF
Attach E - MANNING.pdf PDF
Attach B - SUMMERTON.pdf PDF
Attch C - PAXVILLE.pdf PDF
Attach A - TURBEVILLE.pdf PDF
Attach J - Vendor Lists.pdf PDF
Attach H - 28 QPL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .