Attach I - Lane Closure.pdf
PDF 409 KB Posted
- Attached to
- OnCall Sidewalk & Catch Basin Clarendon
- Solicitation number
- 5400030083
- Issued by
- Richland County, South Carolina
About this file
This is a Lane Closure attachment document related to the OnCall Sidewalk & Catch Basin project in Clarendon, South Carolina. The document provides guidance and requirements for managing lane closures during construction activities associated with sidewalk and catch basin work. The attachment establishes procedures for road closure protocols, traffic management considerations, and notification requirements that contractors must follow when work impacts roadways or traffic flow in the project area.
The document specifies operational standards for lane closures, including advance notice requirements, traffic control measures, and coordination procedures with local authorities. Contractors are required to minimize disruption to public access and maintain safety protocols during any lane closure activities. The attachment serves as a reference document to ensure consistent application of closure procedures across the OnCall contract and to protect public safety while allowing necessary construction work to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach D - NEW ZION.pdf | ||
| Attach F - ALCOLU.pdf | ||
| Attach G - Sec 720.pdf | ||
| Solicitation.pdf | ||
| Attach E - MANNING.pdf | ||
| Attach B - SUMMERTON.pdf | ||
| Attch C - PAXVILLE.pdf | ||
| Attach A - TURBEVILLE.pdf | ||
| Attach J - Vendor Lists.pdf | ||
| Attach H - 28 QPL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .