Attach-B_materials.pdf

PDF 2 MB Posted

Attached to
Hastings Branch Office Expansion Phase 2
Solicitation number
2026-IFB-LM-0470
Issued by
Los Angeles County, California

About this file

Hastings Branch Office Expansion Phase 2 – Materials Attachment

This materials attachment document supports the City of Pasadena Public Library's General Contractor solicitation for the Hastings Branch Office Expansion Phase 2 project in California. The project consists of enclosing an existing covered outdoor space to create approximately 167 square feet of new conditioned office space. Site work includes minor re-grading for a level surface, construction of a new concrete landing and step, and associated ADA accessibility improvements such as truncated domes, a cane-detection barrier at the sidewalk/parking area interface, and a 6-inch-high yellow warning curb in accordance with California Building Code Section 11B-303.5. The document serves as a materials specification and reference guide for bidders preparing proposals for this expansion project.

The attachment provides detailed material specifications and requirements necessary for contractors to accurately estimate costs and develop comprehensive bids. This reference document ensures that all bidders work from consistent material standards and specifications, facilitating fair competition and accurate project pricing. The materials information contained herein is essential for contractors to understand the scope of work and prepare compliant proposals for the Pasadena Public Library's consideration.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CEILING JOIST

794.00

ROOF LEVEL

802.79

1ST FLOOR

784.50(E) PLANTER TO REMAIN

CEILING JOIST

794.00

ROOF LEVEL

802.79

1ST FLOOR

784.50(E) PLANTER TO REMAIN

ABC

AB

OV

E (E

) P

AR

AP

ET

M

AX

. 2 F

T.

RED THIN BRICK VENEER,

STACKED BOND PATTERN W/ WHITE

GROUT COLOR TO MATCH EXISTING –

MFR TBD DURING BIDDING

A

ALUMINUM FRAMED STOREFRONT,

2 ¼” MIN. X 4 ½” MIN. FRAME, OFFSET GLAZED, 1” MIN.

GLASS, ANODIZED FINISH COLOR TO MATCH EXISTING

BRONZE COLOR – MFR TBD DURING BIDDING

B

EXISTING BRONZE COLOR OF

SOLID DOOR & STOREFRONT

FRAMING OF BUILDING

(EXAMPLE OF COLOR ONLY)

C

CORRUGATED ALUMINUM PANEL, W/ POWER-COATED

PAINT, COLOR TO MATCH EXISTING BRONZE -

MFR TBD DURING BIDDING

D

35" MAX. TALL PANEL

O

N Y

X A rc h it e c ts

In c

M A T E R I A L P A L E T T E

1 7 A P R I L 2 0 2 6

/1

/2

:3

:3

P M

PASADENA HASTINGS BRANCH

LIBRARY TENANT IMPROVEMENT

ONYX P21099.CS05

CDR-01 ELEVATIONS &

MATERIALS

1/8" = 1'-0"

EXISTING COLOR ELEVATION

1/8" = 1'-0"

PROPOSED COLOR ELEVATION

BUILDING FACADE

PROPOSED TO BE

AFFECTED BY

PROJECT

BUILDING FACADE

PROPOSED TO BE

AFFECTED BY

PROJECT

NOTE:

1. REFERENCE SHEET A-00 FOR EXISTING/DEMO SITE PLAN

2. REFERENCE SHEET A-10 FOR EXISTING FLOOR PLAN

3. REFERENCE SHEET A-20 FOR PROPOSED FLOOR PLAN &

ADDITIONAL INFORMATION ON NEW OFFICE ADDITION

4. REFERENCE SHEET A-30 FOR EXISTING/PROPOSED ROOF PLAN

5. REFERENCE SHEET A-50 FOR DOOR & WINDOW SCHEDULE.

NEW ROOFTOP

CONDENSER UNIT W/

SOLID METAL SCREEN

Sheets
CDR-01 - ELEVATIONS & MATERIALS

File details come from the government source that posted it. Updated .