Attach 6 - As-Built Drawings.pdf
PDF 38 MB Posted
- Attached to
- Renovate Heritage Room Wall B206
- Solicitation number
- FA449720R0039
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C N
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L O
T
S
A
L E
A P
P R
O V
E D
P R
O J E
A I R
M
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
F
R
E
B
A S
E
D
E L A
W A
R E
SHT
U B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I L
D
A
W I N
G S
G001
COVER SHEET
FLIGHT SIMULATOR
DOVER AIR FORCE BASE, DELAWARE
CN
NNE GI
U
IREE NG
E
I
EDT
TA
ST RIA
SE
O R
F
A
T L A
N
T
E
A
N
SUSSEX COUNTY
LAUREL
SCALE IN MILES
OF CONTRACT
REHOBOTH BEACH
GENERAL LOCATION
MILFORD
BRIDGEVILLE
COUNTY
KENT
M D
DOVER
ODESSA
NEW
COUNTY
CASTLE
MIDDLETOWN
SMYRNA
GEORGETOWN
L
E
W
E
S
C
A
P
Y
R
R
Y
D
E
L
A
W
A
Y
STATE OF DELAWARE
WILMINGTON
VICINITY MAP
10 20
LOCATION MAP
LOCATION MAP
ACCESS
AREA OF WORK
ROUTE
FACILITY 206
PROJECT NORTH TRUE NORTH
29 SEPTEMBER 2014
ASBESTOS ADVISORY:
THIS FACILITY CONTAINS ASBESTOS WHICH SHALL BE
REMOVED UNDER THIS CONTRACT. THE ASBESTOS VINYL
ASBESTOS FLOOR TILE AND MASTIC, AND DRYWALL JOINT
COMPOUND AND FRIABLE DUCT, PIPE, FITTING, AND
EQUIPMENT INSULATION AND DUCT FLEXIBLE CONNECTIONS
LOCATED IN AND ON BLDG 206 SHALL BE CONSIDERED
ASBESTOS-CONTAINING MATERIAL. ALL OF THESE MATERIALS
MUST BE HANDLED AND DISPOSED OF IN STRICT
CONFORMANCE WITH SECTION 02 82 14.00 10 OF THE
SPECIFICATIONS.
LEAD ADVISORY:
PAINT AND/OR PROTECTIVE COATINGS IN AND ON BLDG 206
CONTAIN LEAD. IT MUST BE HANDLED IN STRICT
ACCORDANCE WITH THE DEPARTMENT OF LABOR
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
(OSHA) 29 CFR PART 1926. NOTE IN PARTICULAR SUBPART "D"
NEW SECTION 1926.62 CONCERNING EMPLOYEE PROTECTION
REQUIREMENTS FOR CONSTRUCTION WORKERS EXPOSED TO
LEAD. THE ACTION LEVEL FOR LEAD EXPOSURE IS 30
MICROGRAMS PER CUBIC METER OF AIR AS AN 8 HOUR
TIME-WEIGHTED AVERAGE. HANDLE AND DISPOSE OF LEAD
CONTAMINATED WASTE IN STRICT ACCORDANCE WITH THE
RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) AND
STATE OF DELAWARE REGULATIONS GOVERNING
HAZARDOUS WASTE (DHW).
ISSUE FOR CONSTRUCTION
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
G d w g
A M
Solicitation Number: FA449720R0039 Attachment 6
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
G002
SHEET INDEX,
ABBREVIATIONS,
AND LEGENDS
SHEET NO. TITLE
GENERAL
1 G001 TITLE AND INDEX
2 G002 SHEET INDEX, ABBREVIATIONS, AND LEGENDS
3 G003 PHASING PLANS
4 G004 PHASING PLANS
LIFE SAFETY
5 LS101 OVERALLL FIRE LIFE SAFETY PLAN
HAZARDOUS MATERIALS
6 H101 HAZARDOUS MATERIALS ABATEMENT
CIVIL
7 CD101 SITE EXISTING CONDITIONS & DEMOLITION PLAN
8 C101 SITE PLAN
ARCHITECTURE
9 AD101 AREA B FIRST FLOOR DEMOLITION PLAN
10 AD102 AREA C FIRST FLOOR DEMOLITION PLAN
11 AD103 AREA D FIRST FLOOR DEMOLITION PLAN
12 AD104 AREA B, C SECOND FLOOR DEMOLITION PLAN
13 AD105 ROOF DEMOLITION PLAN
14 A101 AREA B FIRST FLOOR PLAN
15 A102 AREA C FIRST FLOOR PLAN
16 A103 AREA D FIRST FLOOR PLAN
17 A104 AREA B & C SECOND FLOOR PLAN
18 A105 ROOF PLAN
19 A106 AREA B FIRST FLOOR REFLECTED CEILING PLAN
20 A107 AREA C FIRST FLOOR REFLECTED CEILING PLAN
21 A108 AREA D FIRST FLOOR REFLECTED CEILING PLAN
22 A109 AREA C SECOND FLOOR REFLECTED CEILING PLAN
23 A201 ELEVATIONS
24 A301 SECTIONS
25 A401 ENLARGED PLANS
26 A601 DOOR SCHEDULE
27 A602 FINISH SCHEDULE
28 A603 SIGNAGE SCHEDULE & DETAILS
29 A604 PARTITION SCHEDULE
STRUCTURAL
30 S001 STRUCTURAL GENERAL NOTES
31 S002 STRUCTURAL GENERAL NOTES
32 S101 STRUCTURAL SCOPE OF WORK
33 S202 FOUNDATION PLAN - AREA B
34 S203 FOUNDATION PLAN - AREAS C & D
35 S212 MEZZANINE - AREA B
36 S223 FRAMING PLAN - AREAS C & D
37 S401 AT/FP SECTIONS AND DETAILS
38 S402 AT/FP SECTIONS AND DETAILS
39 S403 AT/FP SECTIONS AND DETAILS
40 S404 AT/FP SECTIONS AND DETAILS
41 S405 OPENING/INFILL ELEVATIONS
42 S406 OPENING/INFILL ELEVATIONS
43 S501 DETAILS
MECHANICAL
44 M001 MECHANICAL SYMBOLS AND ABBREVIATIONS
45 M002 MECHANICAL NOTES
46 MHD101 AREA B HVAC DEMOLITION PLAN
47 MHD102 AREA C FIRST FLOOR HVAC DEMOLITION PLAN
48 MHD103 AREA D HVAC DEMOLITION PLAN
49 MHD104 AREA C SECOND FLOOR HVAC DEMOLITION PLAN
50 MPD101 AREA B MECHANICAL PIPING DEMOLITION PLAN
51 MPD102 AREA C FIRST FLOOR MECHANICAL PIPING
DEMOLITION PLAN
52 MPD103 AREA D MECHANICAL PIPING DEMOLITION PLAN
53 MH101 AREA B HVAC PLAN
54 MH102 AREA C FIRST FLOOR HVAC PLAN
55 MH103 AREA D HVAC PLAN
56 MH104 AREA C SECOND FLOOR HVAC PLAN
57 MH105 AREA B ROOF MECHANICAL PLAN
58 MH106 AREA C AND D ROOF MECHANICAL PLAN
59 MP101 AREA B MECHANICAL PIPING PLAN
60 MP102 AREA C FIRST FLOOR MECHANICAL PIPING PLAN
61 MP103 AREA D MECHANICAL PIPING PLAN
62 MP104 AREA C SECOND FLOOR MECHANICAL PIPING PLAN
63 M401 ENLARGED MECHANICAL PLANS
64 M501 MECHANICAL DETAILS
65 M502 MECHANICAL DETAILS
66 M601 MECHANICAL SCHEDULES
67 M602 MECHANICAL SCHEDULES
68 M701 MECHANICAL CONTROLS SEQUENCES
69 M702 MECHANICAL CONTROLS SCHEMATICS
70 M703 MECHANICAL CONTROLS SCHEMATICS
PLUMBING
71 P001 PLUMBING SYMBOLS, ABBREVIATIONS AND NOTES
72 PD101 AREA B PLUMBING DEMOLITION PLAN
73 PD102 AREA C PLUMBING DEMOLITION PLAN
74 PD103 AREA D PLUMBING DEMOLITION PLAN
75 PD401 ENLARGED PLUMBING DEMOLITION PLANS
76 P101 AREA B PLUMBING PLAN
77 P102 AREA D PLUMBING PLAN
78 P103 ENLARGED PLUMBING PLANS
79 P401 ENLARGED PLANS
80 P501 PLUMBING DETAILS
81 P601 PLUMBING SCHEDULES
82 P901 PLUMBING ISOMETRICS DIAGRAMS
FIRE PROTECTION
83 FA001 FIRE ALARM GENERAL NOTES AND DETAILS
84 FA002 OVERALL FIRE ALARM PLAN
85 FAD100 AREA A FIRST FLOOR FIRE ALARM DEMOLITION PLAN
86 FAD101 AREA B FIRST FLOOR FIRE ALARM DEMOLITION PLAN
87 FAD102 AREA C FIRST FLOOR FIRE ALARM DEMOLITION PLAN
88 FAD103 AREA D FIRST FLOOR FIRE ALARM DEMOLITION PLAN
89 FAD104 AREA C SECOND FLOOR FIRE ALARM DEMOLITION PLAN
90 FA100 AREA A FIRST FLOOR FIRE ALARM PLAN
91 FA101 AREA B FIRST FLOOR FIRE ALARM PLAN
92 FA102 AREA C FIRST FLOOR FIRE ALARM PLAN
93 FA103 AREA D FIRST FLOOR FIRE ALARM PLAN
94 FA104 AREA C SECOND FLOOR FIRE ALARM PLAN
95 FX002 OVERALL FIRE PROTECTION PLAN
96 FX100 AREA A FIRST FLOOR FIRE PROT. PLAN
97 FX101 AREA B FIRST FLOOR FIRE PROT. PLAN
98 FX102 AREA C FIRST FLOOR FIRE PROT.PLAN
99 FX103 AREA D FIRST FLOOR FIRE PROT. PLAN
100 FX104 AREA C SECOND FLOOR FIRE PROT.PLAN
ELECTRICAL
101 E001 ELECTRICAL LEGEND AND GENERAL NOTES
102 ESD101 ELECTRICAL SITE DEMOLITION PLAN
103 ELD101 AREA B FIRST FLOOR LIGHTING DEMO. PLAN
104 ELD102 AREA C FIRST FLOOR LIGHTING DEMO. PLAN
105 ELD103 AREA D FIRST FLOOR LIGHTING DEMO. PLAN
106 ELD104 AREA B AND C SECOND FLOOR LIGHTING DEMOLITION
PLANS
107 EPD101 AREA B FIRST FLOOR POWER AND SYSTEMS DEMO. PLAN
108 EPD102 AREA C FIRST FLOOR POWER AND SYSTEMS DEMO. PLAN
109 EPD103 AREA D FIRST FLOOR POWER AND SYSTEMS DEMO. PLAN
110 EPD104 AREA B AND C SECOND FLOOR POWER AND SYSTEMS
DEMO. PLANS
111 ED601 ELECTRICAL ONE-LINE DIAGRAM DEMO.
112 ES101 ELECTRICAL SITE PLAN
113 EL101 AREA B FIRST FLOOR LIGHTING PLAN
114 EL102 AREA C FIRST FLOOR LIGHTING PLAN
115 EL103 AREA D FIRST FLOOR LIGHTING PLAN
116 EL104 AREA B AND C SECOND FLOOR LIGHTING PLANS
117 EP101 AREA B FIRST FLOOR POWER PLAN
118 EP102 AREA C FIRST FLOOR POWER PLAN
119 EP103 AREA D FIRST FLOOR POWER PLAN
120 EP104 AREA B AND C SECOND FLOOR POWER PLANS
121 ET101 AREA B FIRST FLOOR SYSTEMS PLAN
122 ET102 AREA C FIRST FLOOR SYSTEMS PLAN
123 ET103 AREA D FIRST FLOOR SYSTEMS PLAN
124 ET104 AREA C SECOND FLOOR SYSTEMS PLAN
125 E501 ELECTRICAL DETAILS AND SCHEDULES
126 E601 ELECTRICAL ONE-LINE DIAGRAM
127 E701 ELECTRICAL SCHEDULES
128 E702 PANELBOARD SCHEDULES
129 E703 PANELBOARD SCHEDULES
SECURITY
130 TY001 SECURITY NOTES AND DETAILS
131 TY101 AREA C FIRST FLOOR PLAN
132 TY102 AREA C SECOND FLOOR PLAN
SHEET NO. TITLE
U.S.
UTIL
V
VA
VAC
VAR
VAV
VB
VC
VCT
VD
VDC
VEL
VENT.
VERT
VEST.
VFD
VHF
VIB
VIF
VIN
VLT
VM
VOL
VR
VS
VT
VTR
VWC
W
W/
W/O
WA
WAS
WB
WC
WD
WDO
WFD
WG
WH
WHA
WHS
WI
WL
WM
WP
WPF
WS
WST
WT
WTR
WTS
WWF
XARM
XFMR
XFR
XMTR
YD
YHYD
URINAL SCREEN
UTILITY
VOLTAGE, VOLT, VENT, VALVE
VOLT-AMPERE
VACUUM, VOLTS AC
VOLT-AMPERE REACTIVE
VARIABLE AIR VOLUME
VAPOR BARRIER
VERTICAL CURVE
VINYL COMPOSITION TILE
VOLUME DAMPER
VOLTS DC
VELOCITY
VENTILATE
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VERY HIGH FREQUENCY
VIBRATION
VERIFY IN FIELD
VINYL COMPOSITION TILE
VAULT
VOLTMETER
VOLUME
VAPOR RETARDER
VERTICAL SLOT
VINYL TILE
VENT THRU ROOF
VINYL WALL COVERING
WEST, WATT, WIDE, WIRE, WATER
MAIN OR SERVICE LINE
WITH
WITHOUT
WAINSCOT
WASTE ACTIVATED SLUDGE
WET BULB, WIND BEAM
WATER CLOSET
WOOD, WIDTH
WINDOW
WATER FLOW DETECTOR
WATER GAGE
WALL HYDRANT
WATER HAMMER ARRESTER
WELDED HEAD STUD
WROUGHT IRON
WIND LOAD, WATER LINE
WATER METER
WORKING POINT, WEATHERPROOF
WATERPROOFING
WATER SURFACE, WATERSTOP
WASTE
WEIGHT
WATER
WELDED THREADED STUD
WELDED WIRE FABRIC
(WELDED WIRE REINFORCEMENT)
CROSS ARM
TRANSFORMER
TRANSFER
TRANSMITTER
YARD
YARD HYDRANT
POB
POL
PPH
PR
PRC
PREFIN
PRESS.
PRI
PRL
PROP.
PROV
P.R.S.
PRV
PS
PSC
PSF
PSI
PSIG
PT
PTN
PVC
PVI
PVMT
PVT
PWR
QT
Ø
R
R/W
RA
RAD
RAF
RAS
RBR
RCP
RCPT
RCVG
RCVR
RD
RDCR
REC
RECIR
RECT
RED.
REF
REFL
REFR
REINF
REM
REQD
RESIL
REV
RF
RFG
RFH
RFI
RL
RM
RND
RO
RPM
RR
RTE
S
SA
SAN
SCFM
SCHED
SD
SEC
SECT
SF
SFP
SH
SHV
SIM
SK
SLP
SMR
S/N
SNT
SOG
SP
SPD
SPEC
SPKR
SPMR
SPR
SPRT
SPS
SQ
SS
SSD
SSK
SSMR
SST
ST
STA
STD
STER
STIF
STIR.
STL
STOR
STR
STRL
STRUC
SUBSTA
SUP
SURF.
SUSP
SV
SVCE
SW
SWBD
SWGR
SYMM
SYS
T
T&B
T&G
T&P
TAF
TBM
TC
TDC
TEL
TEMP
TER
TERM.
TFE
TG
THERM.
THK
THKNS
THR
TKBD
TLSD
TMV
TOC
TOF
TOS
TOT.
TP
T.O.W.
TR
TRANSV
TRTD
TS
TSD
TSP
TST
T'STAT
TU
TV
TYP
UC
UF
UFD
UG
UH
UHF
UL
ULT
UNIF
UNO
UPS
UR
POINT OF BEGINNING
POLISH, POINT ON LINE
POUNDS PER HOUR
PAIR
POINT OF REVERSE CURVE
PREFINISHED
PRESSURE
PRIMARY
PARALLEL
PROPOSED
PROVIDED
PRESSURE REDUCING STATION
PRESSURE REDUCING VALVE, POWER ROOF
VENTILATOR
PRESSURE SWITCH, PERMANENT SEEDING,
POINT OF SWITCH
PRESTRESSED CONCRETE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAGE
POINT OF TANGENT, POTENTIAL TRANSFORMER
PARTITION
POINT OF VERTICAL CURVE, POLYVINYL
CHLORIDE
POINT OF VERTICAL INTERSECTION
PAVEMENT
POINT OF VERTICAL TANGENT, PRIVATE
POWER
QUARRY TILE
ROUND (DIAMETER), PHASE
RISER, RIGHT, RADIUS
RIGHT OF WAY
RETURN AIR
RADIUS
RAISED ACCESS FLOOR
RETURN ACTIVATED SLUDGE
RUBBER
REINFORCED CONCRETE PIPE,
RECEPTACLE
RECEIVING
RECEIVER
ROOF DRAIN, ROAD
REDUCER
RECESS
RECIRCULATING
RECTANGLE, RECTANGULAR
REDUCING
REFERENCE
REFLECTED
REFRIGERATOR
REINFORCE, REINFORCEMENT, REINFORCED
REMAINDER
REQUIRED
RESILIENT
REVISION
ROOF, RADIO FREQUENCY
ROOFING
ROOF HATCH
RADIO FREQUENCY INTERFERENCE
ROOF LEADER, REFRIGERANT LIQUID
ROOM
ROUND
ROUGH OPENING
REVOLUTIONS PER MINUTE
RIPRAP, RAILROAD
ROUTE
SOUTH, SANITARY, SEWER, SPEAKER,
SWITCH, SUPPLY
SUPPLY AIR
SANITARY
STANDARD CUBIC FEET PER MINUTE
SCHEDULE
STORM DRAIN, SMOKE DETECTOR
SECONDARY
SECTION
SILT FENCE
SPRAYED FIRE PROTECTION
SHEET
SHELVING
SIMILAR
SKETCH
SLOPE
SURFACE METAL RACEWAY
SOLID NEUTRAL
SEALANT
SLAB ON GRADE
SPACE, SPACES, STATIC PRESSURE
STATIC PRESSURE DROP
SPECIFICATION
SPEAKER
SINGLE-PLY MEMBRANE ROOF
SPRINKLER
SUPPORT
STATIC PRESSURE SENSOR
SQUARE
SANITARY SEWER, SOLID SURFACING
SUBSURFACE DRAIN
SOIL STACK
STANDING SEAM METAL ROOF
STAINLESS STEEL
STREET, STORY, STEAM, SEDIMENT TRAP
STATION
STANDARD CUBIC FEET PER MINUTE
STERILIZER
STIFFENER
STIRRUP
STEEL
STORAGE
STRAIGHT, STARTER
STRUCTURAL
STRUCTURE
SUBSTATION
SUPPLY
SURFACE
SUSPENDED
SHEET VINYL, STEAM VENT
SERVICE
SHORT WAY, SWITCH, SIDEWALK
SWITCHBOARD
SWITCHGEAR
SYMMETRICAL
SYSTEM
TREAD, TOP, TANGENT, TELEPHONE, THICKNESS
TOP AND BOTTOM
TONGUE AND GROOVE
TEMPERATURE AND PRESSURE
TROWEL APPLIED FINISH
TEMPORARY BENCH MARK
TOP OF CURB, TIME CLOCK
TURNED DOWN CURB
TELEPHONE
TEMPERATURE, TEMPERED, TEMPORARY
TERRAZZO
TERMINAL
TETRAFLUOROETHYLENE
TOP GRILLE
THERMOMETER
THICK
THICKNESS
THRESHOLD
TACKBOARD
TOP LINEAR SLOT DIFFUSER
THERMAL MIXING VALVE
TOP OF CONCRETE
TOP OF FOOTING
TOP OF STEEL
TOTAL
TREE PROTECTION
TOP OF WALL
TOP REGISTER, TOP OF RAIL
TRANSVERSE
TREATED
TEMPERATURE STEEL, TIME SWITCH, TAMPER
SWITCH, TEMPERATURE SWITCH, THICKENED
SLUDGE, TEMPORARY SEEDING, TRAVERSE
STATION
TEMPORARY SLOPE DRAIN
TWISTED SHIELDED PAIR
TWISTED SHIELDED TRIPLE
THERMOSTAT
TERMINAL UNIT
TELEVISION, TELEVISION OUTLET
TYPICAL
UNDERCUT
UNDERFLOOR
UNDER FLOOR DUCT
UNDERGROUND
UNIT HEATER
ULTRAHIGH FREQUENCY
UNDERWRITERS' LABORATORY
ULTIMATE
UNIFORM
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
REFLECTED CEILING PLAN
I
IC
ID
IG
IMC
IN.
INCAND
INCL
INCR
IND
INFL
INSTL
INSUL
INT
INTMD
INV
IP
IPF
IR
ISOL
J
JB
JC
JCT
JST
JT
K
KCM
KCP
kg kg/S kHZ km kN
KO
kPa
KSF
KSI
kV kVA kVAR
KW
kWH
L
LA
LAB
LAM
LAT
LAV
LB
LCG
LDG
LF
LG
LIQ
LKR
LL
LLH
LLV
LOC
LONG.
LPS
LPT
LR
LS
LT
LTG
LV
LVR
LW
LWC
LWL
L.W.T.
M m
MACH
MAG
MATL
MATV
MAX
MBH
MBR
MCB
MCC
MECH
MEMB
MET.
MFR
M/G
MGD
MH
MHZ
MID
MIN
MISC
MJ
MK
MKBD
MLO
mm
MO
MON
MP
MPa
MPH
MR
MSL
MT
MTD
MTG
MTR
MTZ
MU
MUL
MUTCD
MWP
N
NA
N.C.
N & D
NEC
NEUT
NFPA
NIC
N.O.
NO., NOS
NOM
NPRN
NPW
NRS
NS
NST
NTS
O TO O
OA
OC
OD
O.F.
OFCI
OH
OP
OPNG
OPP
OS&Y
OVHD
OZ
P
PA
Pa
PB
PC
PCC
PCP
PCSP
PD
PED
PEJ
PF
P.F.
PG
PH
PI
PIV
PL,
PLAM
PLAS
PLATF
PLF
PLYWD
PNL
PNLBD
PNT
INTERCOM
INTERRUPTING CAPACITY
INSIDE DIAMETER
ISOLATED GROUND
INTERMEDIATE METAL CONDUIT
INCH
INCANDESCENT
INCLUSIVE
INCREMENT
INDUCTION
INFLUENT
INSTALL, INSTALLATION
INSULATION, INSULATED, INSULATOR,
INSULATING
INTEGRATED, INTERIOR
INTERMEDIATE
INVERT, INVERSE
IRON PIN, STORM DRAIN INLET PROTECTION
IRON PIN FOUND, IRON PIPE FOUND
IRRIGATION
ISOLATOR
JOULE
JUNCTION BOX
JANITOR'S CLOSET
JUNCTION
JOIST
JOINT
KEY OPERATED, KIP
THOUSAND CIRCULAR MILS
KEENE'S CEMENT PLASTER
KILOGRAM
KILOGRAM PER SECOND
KILOHERTZ
KILOMETER
KILONEWTON
KNOCKOUT
KILOPASCAL
KIPS PER SQUARE FOOT
KIPS PER SQUARE INCH
KILOVOLT
KILOVOLT-AMPERE
KILOVOLT-AMPERE REACTIVE
KILOWATT
KILOWATT HOUR
LEFT, LENGTH OF CURVE, LONG
LIGHTNING ARRESTER
LABORATORY
LAMINATE
LATITUDE, LATERAL
LAVATORY
POUND
LACING
LOADING
LINEAR FOOT, LINEAR FEET
LENGTH, LONG
LIQUID
LOCKER
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LOCATE
LONGITUDINAL
LOW PRESSURE SODIUM
LOW POINT
LONG RADIUS, LINEAR REGISTER
LUMP SUM, LIMIT SWITCH
LIGHT
LIGHTING
LOW VOLTAGE
LOUVER
LONG WAY, LIMIT OF WORK
LIGHTWEIGHT CONCRETE
LOW-WATER LINE
LEAVING WATER TEMPERATURE
MICROPHONE, MANUAL
METER
MACHINE
MAGNETIC
MATERIAL
MASTER ANTENNA TELEVISION
MAXIMUM
1000 BTU PER HOUR
MEMBER
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MECHANICAL
MEMBRANE
METAL
MANUFACTURER
MOTOR/GENERATOR
MILLION GALLONS PER DAY
MANHOLE, MOUNTING HEIGHT, METAL HALIDE
MEGAHERTZ
MIDDLE
MINIMUM
MISCELLANEOUS
MECHANICAL JOINT
MARK
MARKER BOARD
MAIN LUGS ONLY
MILLIMETER
MASONRY OPENING
MONUMENT
MEDIUM PRESSURE
MEGAPASCAL
MILES PER HOUR
MOP RECEPTOR
MEAN SEA LEVEL
MOUNT
MOUNTED
MOUNTING
MOTOR
MOTORIZED
MULCHING
MULLION
MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES
MEMBRANE WATERPROOFING
NORTH
NOT APPLICABLE
NORMALLY CLOSED
NAIL AND DISC
NATIONAL ELECTRICAL CODE
NEUTRAL
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NORMALLY OPEN
NUMBER, NUMBERS
NOMINAL
NEOPRENE
NONPOTABLE WATER
NONRISING STEM
NEAR SIDE
NONSLIP TREAD
NOT TO SCALE
OUT TO OUT
OVERALL, OUTSIDE AIR
ON CENTER
OUTSIDE DIAMETER
OUTSIDE FACE
OWNER-FURNISHED CONTRACTOR-INSTALLED
OVERHEAD, OPPOSITE HAND
OUTLET PROTECTION
OPENING
OPPOSITE
OUTSIDE SCREW AND YOKE
OVERHEAD
OUNCE
POLE, POWER, PUMP
PIPE ANCHOR
PASCAL
PUSH BUTTON, PANELBOARD
POINT OF CURVE, PIECE
POINT OF COMPOUND CURVE, PRECAST
CONCRETE
PRECAST CONCRETE PANEL
PRECAST CONCRETE SANDWICH PANEL
PRESSURE DROP
PEDESTAL
PREMOLDED EXPANSION JOINT
POROUS FILL
POWER FACTOR
PIPE GUIDE, PAGE
PHASE, PENTHOUSE
POINT OF INTERSECTION
POST INDICATOR VALVE
PLATE, PROPERTY LINE
PLASTIC LAMINATE
PLASTER
PLATFORM
POUNDS PER LINEAR FOOT
PLYWOOD
PANEL
PANELBOARD
PAINT, PAINTED
DEM
DEPR
DEPT
DET
DF
DH
DI
DIA
DIAG
DIFF
DIM.
DIP.
DIR
DISC.
DISCH
DISP
DIV
DK
DL
DMH
DML
DMPR
DN
DR
DS
DSD
DTWH
DUP
DVTL
DW
DWD
DWEL
DWG
DWL
DWV
DX
E
EA
E.A.T.
ECMT
EF
EFIS
EFL
EJ
EL
ELEC
ELEV
EM
EMER
EMT
ENCL
ENG
ENGR
ENT
ENTR
EOL
EP
EQL
EQPT
ER
ESMT
E TO E
EV
EW
EWC
E.W.T.
EXC
EXH
EXP
EXPN
EXST
EXT
EXTN
F
°F
F&T
F TO F
FA
FAB
FABL
FACP
FC
FD
FDC
FDN
FDR
FE
FEC
FES
FGL
FH
FHC
FHYD
FIG.
FIN.
FL
FLEX.
FLG
FLSH
FLUOR
FOB
FPM
FR
FRICT
FRT
FRZR
FS
FT
FTG
FUR
FURN
FUT
FWC
FXTR
G
GA
GAL
GALV
GC
GCMU
GDR
GEN
GFE
GFECI
GFI
GFM
GHZ
GI
GL
GND
GOVT
GPH
GPM
GR
GRAD
GRL
GRT
GRS
GSU
GTV
GVL
GWB
GYP
H
HB
HBD
HC
HD
HDPE
HDR
HDW
HDWD
HDWL
HGR
HGT
H.I.D.
HM
HOA
HORIZ
HP
HPF
HPS
HPT
HR
HS
HTG
HTR
HV
HW
HWC
HWL
HYD
HZ
DEMOUNTABLE
DEPRESSED
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DUCT HEATER, DOOR HOLDER
DROP INLET, DUCTILE IRON
DIAMETER
DIAGRAM, DIAGONAL
DIFFUSER
DIMENSION
DUCTILE IRON PIPE
DIRECTION, DIRECT
DISCONNECT
DISCHARGE
DISPENSER
DIVISION
DECK
DEAD LOAD
DROP MANHOLE
DEMOLITION, DEMOLISH
DAMPER
DOWN
DOOR, DRIVE
DOWNSPOUT, DRIP STATION, DIGESTED SLUDGE
DUCT SMOKE DETECTOR
DUAL TEMP WALL HYDRANT
DUPLICATE
DOVETAIL
DUMBWAITER
DRINKING WATER DISPENSER
DWELLING
DRAWING
DOWEL
DRAIN, WASTE, AND VENT
DUPLEX, DIRECT EXPANSION
EAST, EMERGENCY (CIRCUIT)
EACH
ENTERING AIR TEMPERATURE
ENCASEMENT
EACH FACE
EXTERIOR FINISH INSULATION SYSTEM
EFFLUENT
EXPANSION JOINT
ELEVATION
ELECTRIC, ELECTRICAL
ELEVATOR
EXPANDED METAL
EMERGENCY
ELECTRICAL METALLIC TUBING
ENCLOSE, ENCLOSURE
ENGINE
ENGINEER
ENTERING
ENTRANCE
END OF LINE
EXPLOSION-PROOF, EDGE OF PAVEMENT
EQUAL
EQUIPMENT
EXISTING TO REMAIN
EASEMENT
END TO END
EVERGREEN
EACH WAY, END WALL
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
EXCAVATE, EXCAVATION
EXHAUST
EXPOSED
EXPANSION
EXISTING
EXTERIOR, EXTERNAL
EXTENSION
FUSED, FAN
DEGREES FAHRENHEIT
FLOAT AND THERMOSTATIC
FACE TO FACE
FIRE ALARM
FABRICATE
FIRE ALARM BELL
FIRE ALARM CONTROL PANEL
FOOTCANDLE, FAN COIL UNIT
FLOOR DRAIN, FIRE DAMPER
FIRE DEPARTMENT CONNECTION
FOUNDATION
FEEDER
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FLARED END SECTION
FIBERGLASS
FIRE HOSE
FIRE HOSE CABINET
FIRE HYDRANT
FIGURE
FINISH
FLOOR, FLASHING
FLEXIBLE
FLANGE
FLASHING
FLUORESCENT
FACE OF BRICK, FRONT OF BUILDING
FEET PER MINUTE
FRAME, FROM
FRICTION
FIRE RETARDANT TREATED
FREEZER
FAR SIDE, FULL SIZE, FLOW SWITCH
FOOT
FOOTING
FURRED, FURRING
FURNISH
FUTURE
FABRIC WALL COVERING
FIXTURE
GAS MAIN OR SERVICE LINE
GAGE, GAUGE
GALLON
GALVANIZE, GALVANIZED
GROUND COUNTERPOISE
GLAZED CONCRETE MASONRY UNIT
GUARDRAIL
GENERATOR
GOVERNMENT FURNISHED EQUIPMENT
GOVERNMENT FURNISHED EQUIPMENT,
CONTRACTOR INSTALLED
GROUND FAULT INTERRUPTER
GOVERNMENT FURNISHED MATERIAL
GIGAHERTZ
GALVANIZED IRON
GLASS
GROUND
GOVERNMENT
GALLONS PER HOUR
GALLONS PER MINUTE
GRADE
GRADUATED
GRILLE
GROUT
GALVANIZED RIGID STEEL
GLAZED STRUCTURAL UNITS
GATE VALVE
GRAVEL
GYPSUM WALLBOARD
GYPSUM
HIGH
HOSE BIBB
HARDBOARD
HANDICAPPED
HEAD, HEAT DETECTOR
HIGH DENSITY POLYETHYLENE
HANDRAIL
HARDWARE
HARDWOOD
HEADWALL
HANGER
HEIGHT
HIGH-INTENSITY DISCHARGE
HOLLOW METAL
HAND-OFF-AUTOMATIC
HORIZONTAL
HORSEPOWER, HEAT PUMP
HIGH POWER FACTOR
HIGH-PRESSURE SODIUM, HIGH PRESSURE
STEAM
HIGH POINT
HOUR
HORIZONTAL SLOT
HEATING
HEATER
HIGH VOLTAGE, HEATING-VENTILATING UNIT
DOMESTIC HOT WATER
DOMESTIC HOT WATER CIRCULATING
HIGH-WATER LINE
HYDRANT
HERTZ
A
AASHTO
AB
ABT
ABUT.
ABV
AC
ACI
ACM
ACMU
ACS
ACST
A.C.T
ACV
ADD.
ADH
ADJ
ADMIN
AFF
AFFF
AFMS
AGGR
AH
AHR
AIC
AISC
AL
ALT
AM.
AMP
ANSI
AP
APPR
APPROX
APS
ARCH.
AREMA
ASB
ASPH
ASSY
ASTM
ASYM
ATS
AUTO.
AUX
AV
AVG
AWG
AWS
AWWA
B
BAL
B&B
B TO B
BC
BD
BDL
BEJ
BET.
BF
BG
BITUM
BL,
BLDG
BLK
BLW
BM
BOL
BOT
B.O.W.
BP
BR
BRG
BRK
BRKT
BSMT
BTU
BTUH
BU
BUR
BW
C
°C
C TO C
C&G
C&R
CAB.
CANTIL
CAP.
CATV
CB
CCTV
CD
CE
CEM
CENT.
CF
CFM
CFS
CG
CH
CHAM
CHBD
CHEM
CHIS
CHKR
CI
CIP
CIRC
CJ
CKT
CL,
CLF
CLG
CLJ
CLO
CLOS
CLPR
CLR
CLSD
CLSR
CM
CMP
CMPSN
CMU
CND
CNDCT
CNDS
CO
C.O.G.
COL
COMB.
COMP
CONC
COND
CONN
CONST
CONT
CONTR
COORD
COP
COR
CORR
COV
CP
CPT
CR
CSD
CT
CTR
CTRL
CTSK
CTWT
CU
CULV
CV
CW
CWB
D
DB
DBL
DC
DEC
DEFL
DEG
AMPERE, AIR COMPRESSED AIR
AMERICAN ASSOCIATION OF STATE HIGHWAY
AND TRANSPORTATION OFFICIALS
ANCHOR BOLT
ABOUT
ABUTMENT
ABOVE
ALTERNATING CURRENT, AIR CONDITIONING
UNIT, ACRE
AMERICAN CONCRETE INSTITUTE
ASBESTOS CONTAINING MATERIAL
ACOUSTICAL CONCRETE MASONRY UNITS
ACCESS
ACOUSTIC, ACOUSTICAL
ACOUSTIC CEILING TILE
ALARM CHECK VALVE
ADDITIONAL
ADHESIVE
ADJACENT
ADMINISTRATIVE
ABOVE FINISH FLOOR
AQUEOUS FILM FORMING FOAM
AIRFLOW MEASURING STATION
AGGREGATE
AIR HANDLING, AIR-HANDLING UNIT
ANCHOR
AMPERE INTERRUPTING CAPACITY
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALUMINUM
ALTERNATE
AMMETER
AMPERE
AMERICAN NATIONAL STANDARDS INSTITUTE
ACCESS PANEL
APPROVED
APPROXIMATE
ALARM PRESSURE SWITCH
ARCHITECTURAL
AMERICAN RAILWAY ENGINEERING AND
MAINTENANCE-of-WAY ASSOCIATION
ASBESTOS
ASPHALT
ASSEMBLY
AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ASYMMETRICAL
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AUXILIARY
AIR VENT, AUDIOVISUAL
AVERAGE
AMERICAN WIRE GAUGE
AMERICAN WELDING SOCIETY
AMERICAN WATER WORKS ASSOCIATION
BATTERY
BALANCE
BALL AND BURLAP
BACK TO BACK
BOLT CIRCLE, BOTTOM OF CURB
BOARD
BUNDLE
BRICK EXPANSION JOINT
BETWEEN
BLIND FLANGE
BOTTOM GRILLE
BITUMINOUS
BUILDING LINE, BASE LINE
BUILDING
BLOCK, BLOCKING
BELOW
BEAM, BENCH MARK, SOIL
STABILIZATION/BLANKETS & MATTING
BEGINNING OF LINE
BOTTOM
BOTTOM OF WALL
BASE PLATE, BACKFLOW PREVENTER,
BEARING PLATE
BARE ROOT, BOTTOM REGISTER
BEARING
BRICK
BRACKET
BASEMENT
BRITISH THERMAL UNIT
BTU PER HOUR
BUILT-UP
BUILT-UP ROOF(ING), BURIED
BOTH WAYS
COURSE, CONVECTOR
DEGREES CELSIUS
CENTER TO CENTER
CURB AND GUTTER
CUT AND REPLACE
CABINET
CANTILEVER
CAPACITY
CABLE TELEVISION
CATCH BASIN, CIRCUIT BREAKER
CLOSED CIRCUIT TELEVISION
CEILING DIFFUSER, ROCK CHECK DAM
CONSTRUCTION ENTRANCE
CEMENT
CENTRIFUGAL
CELLULAR FLOOR
CUBIC FEET PER MINUTE
CUBIC FEET PER SECOND
CORNER GUARD, CHANGE OF GRADE,
CEILING GRILLE
CABINET HEATER, CHORD
CHAMFER
CHALKBOARD
CHEMICAL
CHISELED
CHECKER, CHECKERED
CAST IRON
CAST IN PLACE, CULVERT INLET PROTECTION
CIRCULAR, CIRCUMFERENCE
CONSTRUCTION JOINT
CIRCUIT
CENTER LINE
CHAIN LINK FENCE
CEILING
CONTROL JOINT
CLOSET
CLOSURE
CALIPER
CLEAR
CEILING LINEAR SLOT DIFFUSER
CEILING LINEAR SLOT RETURN
CENTIMETER
CORRUGATED METAL PIPE
COMPOSITION
CONCRETE MASONRY UNITS
CONDUIT
CONDUCTIVE
CONDENSATE, CONDUITS
CLEANOUT, COUNTY
CHANGE OF GRADE
COLUMN
COMBINATION
COMPRESSION, COMPRESSED
CONCRETE
CONDUCTOR, CONDUCTIVE, CONDENSER
CONNECT, CONNECTION
CONSTRUCTION
CONTINUOUS, CONTINUATION
CONTRACT, CONTRACTOR
COORDINATE
COPPER
CORNER
CORRIDOR, CORRUGATED
COVER
CEMENT PLASTER, CONDENSATE PUMP
DISCHARGE
CARPET
CEILING REGISTER, HOT CONDENSER WATER
CELLULAR STEEL DECK
CERAMIC TILE, CURRENT TRANSFORMER
CENTER
CONTROL
COUNTERSUNK
COUNTERWEIGHT
CUBIC, COPPER
CULVERT
CONVERTER
DOMESTIC COLD WATER
CAPILLARY WATER BARRIER
DEPTH, DEGREE OF CURVE, DIMMER
SWITCH, DRAINLINE, MOUNTED IN DUCT
DRY BULB, DIRECT BURIAL, DUCT, DEEP
BANK, DECIBELS, DEED BOOK
DOUBLE
DIRECT CURRENT
DECIDUOUS
DEFLECT, DEFLECTION
DEGREE
A B B R E V I A T I O N S
B
C
P
EARTH
BRICK
STEEL
CONCRETE MASONRY UNITS
CONCRETE
CRUSHED STONE
BUILDING MATERIALS
PLYWOOD
FINISH WOOD
ROUGH WOOD
ACOUSTICAL TILE
COMPRESSIBLE FILLER
RIGID INSULATION
BATT INSULATION
PLASTER OR GWB
L E G E N D
SHEET TYPE
DISCIPLINE DESIGNATION
A401
SEQUENCE
SHEET NUMBERING
PLAN SHEET
STATUS (D FOR DEMOLITION)
AD101A
LEVEL OR FLOOR
KEYPLAN AREA
PLAN SHEET NUMBERING
DISCIPLINE DESIGNATION
DRAWING CONVENTIONS
ELEVATIONS DETAIL
NUMBER
SHEET WHERE DRAWN
SHEET(S) WHERE TAKEN
SPACE NUMBER
ROOM
SPACE
FLOOR NUMBER
COMMUNITY
G GENERAL
LS LIFE SAFETY
H HAZARDOUS MATERIALS
C CIVIL
A ARCHITECTURAL
S STRUCTURAL
M MECHANICAL
P PLUMBING
FA FIRE ALARM
FX FIRE PROTECTION
E ELECTRICAL
SM SOUND MASKING
TY SECURITY
(1 OR 2 CHARACTERS)
SECTION
A101 A401
A101 A201
EXTERIOR
INTERIOR
A101 A501
A102
A101 A201
DOOR NUMBER
SHEET INDEX
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
G d w g
A M
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
G003
PHASING PLAN
N
N N
SCALE:
SCALE:
SCALE:
GENERAL NOTES
1. DURING ALL PHASES RESTROOM ACCESS SHALL
BE MAINTAINED TO THE MAXIMUM EXTENT
POSSIBLE.
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
G d w g
A M
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
G004
PHASING PLANS
N
SCALE:
GENERAL NOTES
1. DURING ALL PHASES RESTROOM ACCESS SHALL
BE MAINTAINED TO THE MAXIMUM EXTENT
POSSIBLE.
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
G d w g
A M
EXIT 24
EXIT 25
C N
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
N
LS101
OVERALL LIFE
SAFETY PLAN
N
DEAD END, COMMON PATH OF TRAVEL, AND TRAVEL DISTANCE REQUIREMENTS
OCCUPANCY
DEAD END
(FT)
COMMON PATH OF TRAVEL
(FT)
TRAVEL DISTANCE
(FT)
ASSEMBLY
BUSINESS
ROOM DESCRIPTION
EXIT 1
EXIT 2
EXIT 3
EXIT 4
EXIT 5
EXIT 6
EXIT 7
EXIT 8
EXIT 10
EXIT 11
EXIT 12
EXIT 13
EXIT 14
EXIT 15
EXIT 16
EXIT 17
EXIT 18
EXIT 19
EXIT 20
EXIT 21
EXIT 22
EXIT 23
EXIT 26
EXIT A
EXIT B
EXIT C
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
AVAILABLE CAPACITY [1,2]
(PERSONS)
DOOR CLEAR WIDTH
(INCHES)
STAIR WIDTH
(INCHES / PERSON)
REQUIRED CAPACITY
(PERSONS)
BUILDING 206 - FIRST FLOOR
EGRESS CAPACITY SUMMARY
EGRESS CAPACITY BASED ON 0.20 INCHES OF CLEAR EGRESS WIDTH PER PERSON FOR DOORS, RAMPS, AND LEVEL
COMPONENTS.
EGRESS CAPACITY BASED ON 0.30 INCHES OF CLEAR EGRESS WIDTH PER PERSON FOR STAIRS.
[1]
[2]
20/75
BUILDING 206 - SECOND FLOOR
EXIT 24
EXIT 25
TOTAL
N/A
N/A
14511
OCCUPANT LOAD CALCULATIONS FOR THIS AREA ARE BASED
ON BUSINESS OCCUPANCY WITH THE EXCEPTION OF THE
LOUNGE AND KITCHENETTE AREA WHICH IS BASED ON
ASSEMBLY-USE. EXIT CALCULATIONS ASSUME EQUAL
OCCUPANT DISTRIBUTION TO THE THREE EXIT DOORS TO THE
EXTERIOR, AND THROUGH THE CORRIDOR TO THE B THROUGH
E PORTIONS OF THE BUILDING. REFER TO SHEET LS002
APPENDIX A FOR THE OCCUPANT LOAD CALCULATIONS.
KEY NOTES:
1 HOUR FIRE RESISTANCE RATING
2 HOUR FIRE RESISTANCE RATING
EXISTING FIRE WALL
PATH OF EGRESS TRAVEL
TRAVEL DISTANCE
COMMON PATH OF TRAVEL
REQUIRED CAPACITY (PERSONS)
PROVIDED CAPACITY (PERSONS)
LIFE SAFETY LEGEND
SCALE:
SCALE:
SCALE: 1/8" = 1'-0"
0 4' 8' 12'2' 20' d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
L S d w g
A M
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
N
H101
HAZARDOUS
MATERIALS
ABATEMENT
GENERAL NOTES - ASBESTOS REMOVAL
1. THIS CONTRACT INVOLVES THE ABATEMENT OF
ASBESTOS-CONTAINING MATERIALS (ACM) FROM THE AREAS INDICATED
ON CONTRACT DRAWING. MATERIALS TO BE REMOVED INCLUDE THE
FOLLOWING: ACM FLOOR TILE/FLOOR TILE MASTIC AND ANY EXISTING
CARPET OVER ACM FLOOR TILE TO BE REMOVED. REFER TO
SPECIFICATIONS SECTION 02 82 14.00 10 "ASBESTOS HAZARD CONTROL
ACTIVITIES” FOR ADDITIONAL DETAILS. ASBESTOS ABATEMENT WORK
SHALL BE PERFORMED AS SPECIFIED IN SPECIFICATION SECTION 02 82
14.00 10 AND THE CONTRACT DRAWING (COLLECTIVELY, THE CONTRACT
DOCUMENTS).
2. ALL WORK ACTIVITIES ASSOCIATED WITH THIS CONTRACT SHALL BE
COMPLETED AS DEFINED IN THE CONTRACT DOCUMENTS. CHANGES IN
THE PROJECT SCHEDULE MUST BE PETITIONED IN WRITING TO THE
ENVIRONMENTAL CONSULTANT/CONSTRUCTION MANAGER AT LEAST 48
HOURS IN ADVANCE. APPROVAL MUST BE OBTAINED PRIOR TO ANY
DEVIATION(S).
3. THE DRAWINGS ASSOCIATED WITH THIS PROJECT WERE
REPRODUCED FROM AVAILABLE PLANS PROVIDED BY THE ARCHITECT.
ACCORDINGLY, VARIATIONS WITHIN THE DEMARCATED WORK AREAS
ARE POSSIBLE AND SHALL HAVE NO IMPACT ON THE CONTRACT PRICE
OR SCHEDULE.
4. THE CONTRACT DRAWINGS DO NOT SHOW ALL EXISTING
MECHANICAL/ELECTRICAL/PLUMBING SYSTEMS PRESENT WITHIN THE
WORK AREAS. MATERIALS SPECIFIED FOR REMOVAL AND DISPOSAL
ARE ESTIMATED QUANTITIES AND ARE LISTED IN THE MATERIAL
SCHEDULES, AND/OR INDICATED ON THE DRAWING. CONTRACTOR IS
RESPONSIBLE FOR COORDINATION OF HIS WORK WITH OTHER TRADES.
CONTRACTOR SHALL VERIFY CONFLICTS THROUGH EXAMINATION OF
ALL CONTRACT DRAWINGS FOR THIS PROJECT.
5. MOVABLE OBJECTS, WITHIN THE WORK AREA WILL BE REMOVED BY
THE OWNER TO FACILITATE ACM ABATEMENT ACTIVITIES, UNLESS
SPECIFIED OTHERWISE WITHIN THE CONTRACT DOCUMENTS.
6. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COMPLETION OF ASBESTOS MATERIAL REMOVAL AND DISPOSAL AS
DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION,
SUPERVISION, AND MANAGEMENT TO COMPLETE THE WORK. THE
CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND
COORDINATE THEIR WORK WITH THE OWNER, OTHER CONTRACTORS,
AND THEIR REPRESENTATIVES. THE CONTRACTOR IS RESPONSIBLE
FOR, AND SHALL COORDINATE, BUILDING/POWER/HVAC ISOLATION WITH
THE BUILDING OWNER.
7. THE ASBESTOS ABATEMENT WORK SHALL BE CONDUCTED BY A
LICENSED ASBESTOS ABATEMENT CONTRACTOR IN ACCORDANCE WITH
ALL APPLICABLE CODES, RULES, AND REGULATIONS.
8. THE ABATEMENT CONTRACTOR SHALL EMPLOY ONLY CERTIFIED
ASBESTOS SUPERVISORS AND HANDLERS. THE CONTRACTOR SHALL
PROVIDE THE APPROPRIATE QUANTITY OF CERTIFIED PERSONNEL TO
WORK AS MANY SHIFTS AND AS MANY HOURS AS NEEDED TO COMPLETE
EACH PHASE OF THE WORK WITHIN THE SPECIFIED TIME PERIOD AS
SCHEDULED.
9. THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE ALL
SPECIFIED ASBESTOS-CONTAINING MATERIALS AS INDICATED ON THE
CONTRACT DRAWING IN ACCORDANCE WITH ALL APPLICABLE
REGULATIONS.
10. THE CONTRACT DRAWING INDICATES THE EXTENT OF THE REMOVAL
AND IS TO BE USED AS A GUIDELINE. AT A MINIMUM, MATERIALS
IDENTIFIED ON THE DRAWINGS ARE TO BE REMOVED AND DISPOSED.
THE ABATEMENT CONTRACTOR IS ENCOURAGED TO REFER TO, AT A
MINIMUM, THE ARCHITECT'S RENOVATION PLAN DRAWINGS FOR A
DETAILED REPRESENTATION OF THE GENERAL LAYOUT OF THE WORK
AREAS. THE ABATEMENT CONTRACTOR SHALL FIELD VERIFY ALL
QUANTITIES AND LOCATIONS OF ASBESTOS-CONTAINING MATERIALS TO
BE REMOVED AND DISPOSED UNDER THIS PROJECT.
11. ALL PROPOSED DECONTAMINATION CHAMBER LOCATIONS, POWER
AND WATER SOURCES, AND STAGING AREAS SHALL BE SUBMITTED BY
THE ABATEMENT CONTRACTOR TO THE OWNER AND THEIR
REPRESENTATIVE FOR APPROVAL PRIOR TO INSTALLATION AND/OR USE.
12. THE ABATEMENT CONTRACTOR SHALL CONDUCT OR OTHERWISE
PROVIDE FOR PERSONAL AIR SAMPLING OF ALL ASBESTOS ABATEMENT
PERSONNEL EMPLOYED ON THE PROJECT, INCLUDING DAILY 8-HOUR
TIME-WEIGHTED AVERAGE AND 30-MINUTE SHORT TERM EXCURSION
LIMIT AIR SAMPLING, AS REQUIRED BY OSHA 29 CFR PART 1926.1101.
13. THE ABATEMENT CONTRACTOR SHALL PROTECT ARCHITECTURAL
FINISHES, FURNISHINGS, AND EQUIPMENT OUTSIDE THE ABATEMENT
WORK AREA AND ALL ADJACENT NON-WORK AREAS FROM DAMAGE AND,
IF ANY DAMAGE OCCURS, THE ABATEMENT CONTRACTOR SHALL BE
HELD LIABLE FOR ALL COSTS RELATED TO THE REPAIR, RESTORATION,
OR REPLACEMENT OF THE DAMAGED FIXTURES AS CAUSED BY THE
CONTRACTOR.
14. THE ABATEMENT CONTRACTOR SHALL COORDINATE THE PHASING
OF THE ASBESTOS REMOVAL WITH THE OWNER AND OTHER
CONTRACTORS IN SUCH A MANNER AS THE OWNER OR HIS
CONSTRUCTION MANAGER MAY DIRECT.
15. THIS CONTRACT INVOLVES THE DISTURBANCE OF LEAD-BASED
PAINT. THE ABATEMENT CONTRACTOR SHALL CONDUCT WORK THAT
MAY IMPACT LEAD-BASED PAINT AS SPECIFIED IN SPECIFICATION
SECTION 02 83 13.00 20 AND THE CONTRACT DOCUMENTS AND BID HIS
WORK ACCORDINGLY. THE ABATEMENT CONTRACTOR MAY REFERENCE
THE OWNER'S HAZARDOUS MATERIALS SURVEY REPORT DATED 3/4/11
FOR ADDITIONAL DETAILS.
16. THIS CONTRACT INVOLVES THE REMOVAL AND DISPOSAL OF
LIGHTING BALLASTS AND LAMPS CONTAINING PCBS AND MERCURY. THE
ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF LIGHTING
BALLASTS AND LAMPS IN ACCORDANCE WITH SPECIFICATION SECTION
02 84 16. THE ABATEMENT CONTRACTOR SHALL REMOVE ALL LIGHTS IN
THEIR ENTIRETY AS DELINEATED ON DRAWINGS ED-101, ED-102, ED-103
AND ED-104. THE ABATEMENT CONTRACTOR MAY REFERENCE THE
OWNER'S HAZARDOUS MATERIALS SURVEY REPORT DATED 3/4/11 FOR
ADDITIONAL DETAILS.
17. THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL
CARPET INSTALLED OVER ACM FLOOR TILE AND MASTIC SCHEDULED
FOR REMOVAL. THE GENERAL CONTRACTOR SHALL REMOVE AND
DISPOSE NON-ACM COVE BASE IN AREAS SCHEDULED FOR ACM
FLOORING REMOVAL.
LEGEND
ASBESTOS-CONTAINING FLOOR TILE TO BE REMOVED AND
DISPOSED. MASTIC IS NON-ACM. GENERAL CONTRACTOR
SHALL REMOVE NON-ACM MASTIC AS NEEDED TO ACCEPT
NEW FLOOR FINISHES.
NO WORK IN THIS AREA
ESTIMATED
QUANTITY
MATERIAL
ASBESTOS-CONTAINING FLOOR TILE AND
FLOOR TILE MASTIC
381 SQUARE FEET
REMARKS
ASBESTOS-CONTAINING FLOOR TILE AND MASTIC TO BE
REMOVED AND DISPOSED
15,829 SQUARE FEET
ASBESTOS-CONTAINING FLOOR TILE
MASTIC IS NON-ACM
MAINTENANCE ROOM #27
SCALE:
SCALE: 1/16" = 1'-0"
0 4' 10' 20' 30' 40'
N
SCALE:
NON-FRIABLE ASBESTOS HAS BEEN FOUND IN AREA D ROOFS
AS INDICATED IN DETAIL 2/H101. TREAT IN AN APPROVED
MANNER PER REPORTING AGENCY AND JURISDICTIONAL
AUTHORITY REQUIREMENTS. REFER TO ENVIRONMENTAL
TESTING, INC. REPORT DATED 07.17.2014
DRAWING PROVIDED FOR REFERENCE
ONLY AND BASED ON INFORMATION
PROVIDED BY OTHERS UNDER SEPARATE
COVER. REFERENCE REPORTS PROVIDED
BY AECOM 65% DOCUMENTATION AND
ENVIROMENTAL TESTING, INC. DATED
07/17/2014 d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
H d w g
A M
GM
S
S
S
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
EXCAVATE AREA
WITH CAUTION
X
X
X
X
CAUTION: CHILLER
PIPE CROSSING
( HAND DIG )
X
X
CAUTION: GAS
REGULATOR
XX
X
X
X
X
X
J3-020 TO
REMAIN
X
X X
S4-090 TO
REMAIN
ETR
J4-110 TO
REMAIN
C
D
C D
CD101
N
C N
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
KEYPLAN
N
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
R H
R R
H R
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
SCALE:
CD101 -
0 20' 40'
SCALE: 1" = 20'-0"
DEMOLITION NOTES:
1. SEE SECTION 2.5 UTILITIES OF THE DAFB DESIGN
GUIDE FOR UTILITY REMOVAL LIMITS.
2. CONDUITS UNDER PAVED AREAS MAY REMAIN.
CABLES SHALL BE REMOVED.
3. DEMOLITION NOTES ARE FOR REFERENCE ONLY.
CONTRACTOR SHALL VERIFY ALL UTILITIES AND
REMOVALS.
4. REFER TO 2/CD101 FOR REMOVAL AND
REPLACEMENT REQUIREMENTS.
NOTE BY SYMBOL:
REMOVE EXISTING CONCRETE PAD. REMOVE ASSOCIATED
PIPING AND ELECTRICAL UNDERGROUND.
REMOVE EXISTING CONCRETE PAD. REMOVE ASSOCIATED
UNDERGROUND CONDUIT AND WIRING.
REMOVE EXISTING CONCRETE PAD.
REMOVE EXISTING EMPTY ELECTRICAL CONDUIT. REFER TO
ESD101 FOR ELECTRICAL PRIMARY WIRING REMOVAL.
EXISTING ELECTRICAL EMPTY CONDUIT TO REMAIN UNDER
EXISTING STRUCTURES OR PAVED AREAS.
REMOVE EXISTING CONCRETE SUPPORTS.
REMOVE EXISTING CONCRETE ENCASED
CONDUITS, AND DUCT SPACERS AS
SHOWN ON DEMOLITION PLAN
FINISH GRADE
NEW SOD ALONG TRENCH AND
DISTURBED GRASS AREAS
A
P P
R O
X I M
A T
E
D
E P
T H
REMOVE EXISTING WARNING TAPE
AND/OR TRACER WIRE
TOP 12 - INCH LIFT TO BE COMPACTED
TO 95% MAXIMUM DENSITY
4" TOPSOIL
NATIVE BACKFILL
SCALE:
CD101 -
NOTES:
1. NATIVE BACKFILL SHALL BE EXCAVATED NATIVE GRANULAR
MATERIAL FREE OF ICE, CLAY, DEBRIS, ORGANIC MATTER AND ROCK
LESS THAN 4" ACROSS THEIR GREATEST DIMENSION.
2. NATIVE SOIL BACKFILL SHALL BE PLACE IN 12 - INCH LOOSE LIFTS
AND COMPACT EACH LIFT TO 90% MAXIMUM DENSITY, UNLESS
NOTED OTHERWISE.
CD101
SITE EXISTING
CONDITIONS &
DEMOLITION
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
C D d w g
A M
Y
W
V
S
GM
S
S
S
E x
E x
E x
E x
Y
W
V
S
GM
S
S
S
E x
E x
E x
E x
EXISTING DX DRY
COOLER AND PAD
RE: MPD103
EXISTING J4-110
ON CONC. PAD
NEW TRANSFORMER
T-206 - RE: ES101
EXISTING S4-090
EXISTING J3-020
EXISTING FEEDER
TO REMAIN
IT-1 CHILLER
ICE TANKS
CH-1
CH-2
NEW CONCRETE
PAD - RE: S202
BOLLARDS
RE: 1 / S002
3- BOLLARDS
SPACED AT 6' OC
RE: 1 / S002
NEW DUCTBANK
5- BOLLARDS
SPACED AT 6' OC
RE: 1 / S002
NEW DUCTBANK
RE: 2 / C101
C
CH-3
NEW CONCRETE
PAD - RE: S203
4- BOLLARDS
SPACED AT 6' OC
RE: 1 / S002
C
NEW DUCTBANK
RE: 3 / C101
C101
N
SITE PLAN
C N
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
KEYPLAN
N
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
R H
R R
H R
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
SCALE:
C101 -
0 20' 40'
SCALE: 1" = 20'-0"
TOP 12 - INCH LIFT TO BE COMPACTED
TO 95% MAXIMUM DENSITY
NEW SOD ALONG TRENCH AND
DISTURBED GRASS AREAS
POWER CONDUITS REFER
TO ELECTRICAL SHEET
E601 FOR SIZE AND QUANTITY
CONCRETE ENCASEMENT 3000 PSI AT
28 DAY COMPRESSION STRENGTH
WARNING TAPE ( 5.0 MIL, MIN. ) WITH TRACER
WIRE LABELED "ELECTRICAL POWER"
FINISH GRADE
DUCT SPACER SIZE FOR
RACEWAYS USED. TYPICAL
T
Y P
I C
A L
4" TOPSOIL
NATIVE BACKFILL
SCALE:
C101 -
NOTES:
1. NATIVE BACKFILL SHALL BE EXCAVATED NATIVE GRANULAR MATERIAL FREE
OF ICE, CLAY, DEBRIS, ORGANIC MATTER AND ROCK LESS THAN 4" ACROSS
THEIR GREATEST DIMENSION.
2. NATIVE SOIL BACKFILL SHALL BE PLACE IN 12 - INCH LOOSE LIFTS AND
COMPACT EACH LIFT TO 90% MAXIMUM DENSITY, UNLESS NOTED
OTHERWISE.
3. STAKE DOWN CONDUITS TO AVOID FLOAT.
4. COORDINATE DEPTHS WITH OTHER UTILITIES.
WARNING TAPE ( 5.0 MIL, MIN. ) WITH TRACER
WIRE LABELED "ELECTRICAL POWER"
TYPE B ASPHALT
DUCT SPACER SIZE FOR
RACEWAYS USED. TYPICAL
POWER CONDUITS REFER TO ELECTRICAL
SHEET E601 FOR SIZE AND QUANTITY
SAND ENCASEMENT COMPACTED
TO 95% MAXIMUM DENSITY
NEW SOD ALONG TRENCH AND
DISTURBED GRASS AREAS
FOR NON-PAVED AREAS
MATCH
GRADE
FLUSH
PAVED AREANON-PAVED AREA
T
Y P
I C
A L
4" TOPSOIL
FINISH GRADE
NON-PAVED AREAS: NATIVE BACKFILL
SCALE:
C101 -
1. REFER TO DOVER AFB GENERAL REQUIREMENTS SECTION 1 FOR ALL
CONSTRUCTION REGULATIONS FOR WORK PERFORMED ON BASE.
2. THE CONTRACTOR SHALL CONTACT MISS UTILITY AND OBTAIN A MISS UTILITY
TICKET NUMBER AND INCLUDE THAT INFORMATION ON THE SUBMITTED FORM.
THE GOVERNMENT INSPECTOR WILL PROVIDE THE CONTRACTOR WITH THE MISS
UTILITY GRID MAP PAGE NUMBER, GRID COORDINATES, AND NEAREST
INTERSECTION INFORMATION.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH, AND
OBTAIN CLEARANCE FROM, MISS UTILITY (PHONE 1-800-282-8555) FOR UTILITY
SERVICES NOT OWNED BY DOVER AFB (I.E. CHESAPEAKE UTILITY’S STEEL GAS
LINES, VERIZON COMMUNICATION LINES, COMCAST CABLEVISION LINES, AND
KENT COUNTY SANITARY SEWER LINES). CALL MISS UTILITY PRIOR TO
SUBMITTING THE REQUEST TO THE GOVERNMENT INSPECTOR. ADEQUATELY
DESCRIBE THE EXACT LOCATION AND TYPE OF EXCAVATION WORK INVOLVED
AND THE JOB TITLE TO MISS UTILITY. THE GOVERNMENT PROCESS MAKES THIS
COMMUNICATION SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
4. THE CONTRACTOR SHALL MARK PROPOSED EXCAVATION LOCATIONS IN THE
FIELD IN WHITE PAINT PRIOR TO SUBMISSION OF THE WORK CLEARANCE
REQUEST. PAINT MARKINGS MUST BE WITHIN 18 INCHES OF THE PROPOSED
EXCAVATION. IF THE LOCATION OF EXCAVATION CHANGES THE WORK
CLEARANCE REQUEST PROCESS FOR THE NEW LOCATIONS MUST BE
REACCOMPLISHED AND REAPPROVED. THE CONTRACTOR IS RESPONSIBLE FOR
PROTECTING THE UTILITY MARKINGS MADE BY THE GOVERNMENT AND/OR MISS
UTILITY. IF THE UTILITY MARKINGS DISAPPEAR OR BECOME UNREADABLE, ALL
WORK WILL STOP UNTIL ALL REMARKING HAS BEEN ACCOMPLISHED.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAND DIGGING WITHIN 24
INCHES OF EITHER SIDE OF GOVERNMENT MARKED UTILITY LINES. IN THE
EVENT ANY DAMAGE OCCURS TO A UTILITY, NOTIFY THE GOVERNMENT
INSPECTOR IMMEDIATELY.
6. UTILITY OUTAGES AND ROAD CLOSURES: APPROVAL IS REQUIRED TO BE
OBTAINED FROM THE GOVERNMENT PRIOR TO INITIATING ANY UTILITY OUTAGE,
ROAD OR LANE CLOSURE, OR PARKING LOT CLOSURE IN ACCORDANCE WITH A
PREVIOUSLY ARRANGED SCHEDULE. THE CONTRACTOR IS RESPONSIBLE FOR
NOTIFYING THE BASE CIVIL ENGINEER AT LEAST 21 DAYS IN ADVANCE OF THE
INTENDED OUTAGE OR CLOSURE.
GENERAL NOTES:
NOTES:
1. NATIVE BACKFILL SHALL BE EXCAVATED NATIVE GRANULAR
MATERIAL FREE OF ICE, CLAY, DEBRIS, ORGANIC MATTER AND
ROCK LESS THAN 4" ACROSS THEIR GREATEST DIMENSION.
2. NATIVE SOIL BACKFILL SHALL BE PLACE IN 12 - INCH LOOSE LIFTS
AND COMPACT EACH LIFT TO 90% MAXIMUM DENSITY, UNLESS
NOTED OTHERWISE.
3. STAKE DOWN CONDUITS TO AVOID FLOAT.
4. COORDINATE DEPTHS WITH OTHER UTILITIES.
3" 7.5" 3"
3" 7.5"
TYPICAL
3"
MATCH EXISTING
ASPHALT PAVEMENT
DEPTH (8" MIN.)
92-97% DENSITY
PAVED AREAS: SELECT SUBGRADE
FLOWABLE BACKFILL FULL DEPTH
12" MIN.
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
C d w g
A M
B110
OFFICE
B139
VEST.
B130
CORR.
B111
CLASSROOM
B112
TRAINER
B113
CLASSROOM
B114
BREAKROOM
B140
VEST.
B126
CORR.
B115A
OFFICE
B115
BREAK
ROOM
B116
CLASSROOM
B117
CLASSROOM
B118
COMPUTER
LAB
B119
OFFICE
B135
BOILER
ROOM
B133
DOLLY / EQUIP.
STORAGE
B125
CLASSROOM
B124
CLASSROOM
B123
CLASSROOM
B122
CLASSROOM
B136
JANITOR
B109
CLASSROOM
B108
CLASSROOM
B107
CLASSROOM
B106
CLASSROOM
B101
OFFICE
B100A
OFFICE
RECEPTION
B100B
MSGT
B100C
CC
B100D
CONFERENCE
B102
CLASSROOM
B103
CLASSROOM
B127
CORR.
B129
CORR.
B128
CORR.
B121
TRAINER
B120
TRAINER
B131
POWER
ROOM
B105
TRAINER
B104
TRAINER
B104A
TRAINER
C128
CORR.
C135
CORR.
B138
WOMEN'S
B137
MEN'S
1 5
21 10
2 1 5
1 5
1 5
1 5
3 5
3 5
3 5
3 5
1 5
1 5 1 5
1 5 1 5
2 2
1 5 1 5
1 5 1 5 1 5 1 5
1 51 51 51 5
3 5
2 2
2 2
2 2 2
8 9
8 9
26 19
5 12
1 5
6 21
6 21
2 2 2 2
2 222
1 5 1 5 1 5 1 5
7 8
MATCHLINE - REFER TO AD102 FOR AREA C
C N
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
KEYPLAN
N
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
N
AD101
AREA B FIRST
FLOOR
DEMOLITION PLAN
DEMO GENERAL NOTES
1. REMOVE ALL EXISTING WINDOW TREATMENTS AT
EXISTING WINDOWS.
2. ALL WORKSTATIONS, FURNITURE AND TRAINING
EQUIPMENT TO BE REMOVED DURING WORK AND
REINSTALLED UPON COMPLETION.
3. TRAINING DEVICES IN AREA “B” ROOMS 4, 4A, 5, 20,
AND 21 SHALL NOT BE REMOVED DURING WORK.
4. TRAINING DEVICES IN AREA “D” ROOMS 2 AND 8
SHALL NOT BE REMOVED DURING WORK.
5. FLIGHT SIMULATORS IN AREA “C” SHALL NOT NEED
TO BE REMOVED DURING WORK.
6. EXISTING SMARTBOARDS, WHITEBOARDS, AND
CEILING MOUNTED PROJECTORS IN AREA
“B” CLASSROOMS 1, 1A, 2, 3, 4, 4A, 5 - 13, 16 - 25
SHALL BE REMOVED AND REINSTALLED UPON
COMPLETION.
7. EXISTING FIRE ALARM EQUIPMENT SHALL BE
MAINTAINED FULLY OPERATIONAL UNTIL THE NEW
EQUIPMENT HAS BEEN TESTED AND ACCEPTED BY
THE CONTRACTING OFFICER. AS NEW EQUIPMENT
IS INSTALLED, IT SHALL BE LABELED "NOT IN
SERVICE" UNTIL THE NEW EQUIPMENT IS
ACCEPTED. ONCE THE NEW SYSTEM IS
COMPLETED, TESTED, AND ACCEPTED BY THE
GOVERNMENT, IT SHALL BE PLACED IN SERVICE
AND CONNECTED TO THE STATION FIRE ALARM
SYSTEM. NEW EQUIPMENT SHALL HAVE TAGS
REMOVED AND THE EXISTING EQUIPMENT SHALL
BE TAGGED "NOT IN SERVICE" UNTIL REMOVED
FROM THE BUILDING.
EXISTING WALL TO BE
REMOVED
CONSTRUCTION LEGEND
EXISTING DOOR AND
FRAME TO BE REMOVED
EXISTING WALL TO REMAIN
NO WORK AREA
T H
C
U M
E N
T
E
L I M
I N
A R
Y
T
U R
E
A
N D
N
G
N E
D
A
A
L E
D
D
O C
U M
E N
T
SCALE:
N
SCALE:
REMOVE EXISTING STUD
WALL CONSTRUCTION
COORDINATE WITH FIRE
PROTECTION DRAWINGS
FOR EXTENT OF DEMOLITION
SCALE: 1/8" = 1'-0"
0 4' 8' 12'2' 20'
1. REMOVE EXISTING CARPET FINISH.
2. REMOVE EXISTING RUBBER WALL BASE PREP
WALL FOR NEW FINISH PER FINISH
MANUFACTURES RECOMMENDATION.
3. REMOVE EXISTING RESILIENT TILE SYSTEMS.
4. REMOVE EXISTING RUBBER SHEET FLOORING.
5. REMOVE EXISTING ACP AND CEILING SYSTEM.
6. REMOVE EXISTING WALL COVERING.
7. REMOVE EXISTING CERAMIC TILE FLOORING
SYSTEM.
8. REMOVE EXISTING CERAMIC TILE WAINSCOT
SYSTEM.
9. REMOVE EXISTING TOILET PARTITION TYP.
10. EXISTING BASE AND WALL CABINETS TO REMAIN.
11. REMOVE EXISTING RUBBER STAIR TREAD/NOSING
STRIPS.
12. REMOVE EXISTING LAMINATE WOOD FLOOR.
13. REMOVE EXISTING STOREFRONT SYSTEM IN
ENTIRETY.
14. REMOVE EXISTING WINDOW SYSTEM.
15. REMOVE EXISTING DOOR AND FRAME.
16. REMOVE EXISTING EXTERIOR TYPE THRESHOLD.
17. REMOVE EXISTING FIXTURE, TYP.
18. REMOVE EXISTING COUNTER TOP.
19. REMOVE EXISTING WALL PANEL FINISH SYSTEM
AT WOOD WALL CONSTRUCTION REMOVE
EXISTING 1/2" GYPSUM BOARD AT CORRIDOR SIDE
ONLY.
20. REMOVE EXISTING WINDOW TREATMENT.
21. REMOVE EXISTING WOOD BASE AND CHAIRRAIL.
22. REMOVE EXISTING WOOD PANEL WAINSCOT
SYSTEM.
23. REMOVE EXISTING ACCORDION PARTITION
SUPPORT/CLOSURE SYSTEM.
24. REMOVE EXISTING CMU PARTITION SYSTEM TO
ACCOMMODATE NEW DOOR AND FRAME AS
SCHEDULED.
25. REMOVE EXISTING CMU PARTITION SYSTEM TO
ACCOMMODATE NEW 8'-0" OPENING.
26. REMOVE EXISTING GWB PARTITION SYSTEM.
PREP EXISTING CMU WALL FOR NEW FINISH.
27. REMOVE EXISTING METAL PANEL INFILL SYSTEM IN
ENTIRETY.
28. REMOVE EXISTING CMU PARTITION SYSTEM.
29. REMOVE EXISTING EXTERIOR CMU WALL WITH
FLUTED CMU VENEER WALL SYSTEM TO
ACCOMMODATE NEW DOOR AND FRAME AS
SCHEDULED.
30. REMOVE EXISTING COPING TO ACCOMMODATE
INSTALLATION OF THE NEW ROOF SYSTEM.
31. REMOVE EXISTING GUTTER AND DOWNSPOUT
SYSTEM.
32. REMOVE EXISTING BUILT-UP ROOF SYSTEM TO
ACCOMMODATE INSTALLATION OF THE NEW ROOF
SYSTEM.
33. GRAVITY ROOF VENTS TO BE REMOVED,
COORDINATE WITH MECHANICAL DEMOLITION
DRAWINGS.
34. REMOVE PORTIONS OF THE EXISTING STANDING
SEAM FASCIA TO THE EXTENT REQUIRED TO
ACCOMMODATE INSTALLATION OF THE NEW ROOF
SYSTEM. BOTTOM OF FASCIA SHALL FOLLOW
EXISTING ROOF SLOPE.
35. EXHAUST FAN TO BE REMOVED, COORDINATE
WITH MECHANICAL DEMOLITION DRAWINGS.
36. REMOVE EXISTING ACCORDION PARTITION AND
SUPPORT/CLOSURE SYSTEM.
37. REMOVE EXISTING EXTERIOR WALL SYSTEM TO
ACCOMMODATE NEW LOUVER SYSTEM. REFER TO
ELEVATIONS FOR LOCATIONS OF NEW LOUVERS.
38. REMOVE EXISTING LOUVER SYSTEM IN ITS
ENTIRETY.
39. REMOVE EXISTING REPLACEMENT RAISED FLOOR
TILE THAT DOES NOT MATCH THE EXISTING COLOR
AND PATTERN. REPLACE RAISED FLOOR TILE WITH
NEW TO MATCH EXISTING COLOR SCHEME.
40. REMOVE EXISTING ACCESS LADDER.
41. REMOVE PORTION OF EXISTING WALL FOR
MECHANICAL EQUIPMENT ACCESS.
42. REMOVE PORTION OF EXISTING MEZZANINE
GRATING AND HANDRAIL. PREP WALL BELOW FOR
NEW 2 HOUR FIRE WALL.
43. REMOVE AND REPLACE EXISTING EXPANSION
JOINT.
44. GRAVITY ROOF VENTS TO REMAIN, PREP ROOF
VENT FOR NEW ROOF SYSTEM, COORDINATE WITH
MECHANICAL DEMOLITION DRAWINGS.
45. EXHAUST FAN TO REMAIN, PREP FAN FOR NEW
ROOF SYSTEM, COORDINATE WITH MECHANICAL
DEMOLITION DRAWINGS.
46. REMOVE EXISTING LOUVER PREP WALL FOR NEW
CMU INFILL. INFILL TO MATCH ADJACENT
MATERIAL.
47. REMOVE EXISTING GYPSUM BOARD CEILING.
48. EXISTING PANEL BOARD TO BE REMOVE. PREP
OPENING FOR INFILL CONSTRUCTION.
49. REMOVE EXISTING PANEL BOARD COVER. PREP
EXISTING PANEL BOARD ENCLOSURE FOR NEW
COVER.
50. REMOVE EXISTING LOUVER PREP OPENING FOR
NEW LOUVER AND EXTERIOR WALL INFILL.
51. GRAVITY ROOF VENT TO BE REMOVED, REMOVE
EQUIPMENT CURB, PREP AREA FOR NEW ROOF
SYSTEM, EQUIPMENT CURB, AND GRAVITY ROOF
VENT.
DEMO KEYNOTES
d o v c e s e n g P C
A s
B u i l t
D r a w i n g s
A D d w g
A M
MECHANICAL
YARD
C128
CORR.
C135
CORR.
C136
CORR.
C134
CORR.
C133
CORR.
C122
OFFICE
C123
OFFICE
C124
OFFICE
C126
OFFICE
C125
OFFICE
C127
MAINTENANCE
C129
CORR.
C130
MECH.
ROOM
MECHANICAL
YARD
C106
FLIGHT
SIMULATOR
C105
FLIGHT
SIMULATOR
A
STAIR
C120
COMPUTER
ROOM
C117
COMPUTER
ROOM
C116
OFFICE
B
STAIR
C132
MECH.
ROOM
C131
ELEC./ TELECOM
ROOM
C107
HYDRAULIC
PUMP ROOM
MATCHLINE - REFER TO AD101 FOR AREA B
M A
T C
H L I N
E
R
E F
A
D
F
E
A
D
19 2
1 5
1 5
1 5
3 5
4 5
3 5
3 5
15 15
39 39
14 14 14
1 5
23 5
ABOVE
DOOR
DEMO EXIST.
LOUVER
C N
C S
D E
S C
R I P
T I O
N
R E
V D
A T
E D
R A
W N
T I T
L E
S U
B M
I T
T E
D
D A
T E
A P
P R
D
D E
S I G
N E
D
B
Y
F J X
T
D R
A W
N
B
Y
A P
P R
O V
E D
P L
A
L E
A P
P R
O V
E D
P R
O J E
A
B
I L I T
Y
C
O M
M A
N D
D O
V E
R
A
R
S
E
D
E L A
W A
R E
SHT
B
M I S
S I O
N
R E
N O
V A
T I O
N
O
F
T
R A
I N
I N
G
F
A C
I L
I T
Y
S T
E P
H E
N
B
U R
G I N
S B
KEYPLAN
N
CYNTERGY ARCHITECTURE, PLLC
CYNTERGY ENGINEERING, PLLC
810 SOUTH CINCINNATI, 2ND FLOOR
TULSA, OK 74119
918-877-6000
T
E D
C
K
C
H E
C K
F I N
A L
R
E V
I E
W
S
E T
I S
S U
E
F
N
S T
R U
C T
I O
N
A S
B
U I
A
W I N
G S
N
AD102
AREA C FIRST &
SECOND FLOOR
DEMOLITION PLAN
DEMO GENERAL NOTES
1. REMOVE ALL EXISTING WINDOW TREATMENTS AT
EXISTING WINDOWS.
2. ALL WORKSTATIONS, FURNITURE AND TRAINING
EQUIPMENT
TO BE REMOVED DURING WORK AND
REINISTALLED UPON
COMPLETION.
3. TRAINING DEVICES IN AREA “B” ROOMS 4, 4A, 5, 20,
AND 21
SHALL NOT BE REMOVED DURING WORK.
4. TRAINING DEVICES IN AREA “D” ROOMS 2 AND 8
SHALL NOT BE REMOVED DURING WORK.
5. FLIGHT SIMULATORS IN AREA “C” SHALL NOT NEED
TO BE REMOVED DURING WORK.
6. EXISTING SMARTBOARDS, WHITEBOARDS, AND
CEILING
MOUNTED PROJECTORS IN AREA
“B” CLASSROOMS 1, 1A, 2,
3, 4, 4A, 5 - 13, 16 - 25 SHALL BE REMOVED AND
REINSTALLED
UPON COMPLETION.
7. ACCORDIAN FOLDING PARTITIONS TO REMAIN,
UNLESS NOTED OTHERWISE.
8. EXISTING FIRE ALARM EQUIPMENT SHALL BE
MAINTAINED FULLY OPERATIONAL UNTIL THE NEW
EQUIPMENT HAS BEEN TESTED AND ACCEPTED BY
THE CONTRACTING OFFICER. AS NEW EQUIPMENT
IS INSTALLED, IT SHALL BE LABELED "NOT IN
SERVICE" UNTIL THE NEW EQUIPMENT IS
ACCEPTED. ONCE THE NEW SYSTEM IS
COMPLETED, TESTED, AND ACCEPTED BY THE
GOVERNMENT, IT SHALL BE PLACED IN SERVICE
AND CONNECTED TO THE FIRE ALARM SYSTEM.
NEW EQUIPMENT SHALL HAVE TAGS REMOVED
AND THE EXISTING EQUIPMENT SHALL BE TAGGED
"NOT IN SERVICE" UNTIL REMOVED FROM THE
BUILDING.
EXISTING WALL TO BE
REMOVED
CONSTRUCTION LEGEND
EXISTING DOOR AND
FRAME TO BE REMOVED
EXISTING WALL TO REMAIN
NO WORK AREA
SCALE:
SCALE: 1/8" = 1'-0"
0 4' 8' 12'2' 20'
1. REMOVE EXISTING CARPET FINISH.
2. REMOVE EXISTING RUBBER WALL BASE PREP
WALL FOR NEW FINISH PER FINISH
MANUFACTURES RECOMMENDATION.
3. REMOVE EXISTING RESILIENT TILE SYSTEMS.
4. REMOVE EXISTING RUBBER SHEET FLOORING.
5. REMOVE EXISTING ACP AND CEILING SYSTEM.
6. REMOVE EXISTING WALL COVERING.
7. REMOVE EXISTING CERAMIC TILE FLOORING
SYSTEM.
8. REMOVE EXISTING CERAMIC TILE WAINSCOT
SYSTEM.
9. REMOVE EXISTING TOILET PARTITION TYP.
10. EXISTING BASE AND WALL CABINETS TO REMAIN.
11. REMOVE EXISTING RUBBER STAIR TREAD/NOSING
STRIPS.
12. REMOVE EXISTING LAMINATE WOOD FLOOR.
13. REMOVE EXISTING STOREFRONT SYSTEM IN
ENTIRETY.
14. REMOVE EXISTING WINDOW SYSTEM.
15. REMOVE EXISTING DOOR AND FRAME.
16. REMOVE EXISTING EXTERIOR TYPE THRESHOLD.
17. REMOVE EXISTING FIXTURE, TYP.
18. REMOVE EXISTING COUNTER TOP.
19. REMOVE EXISTING WALL PANEL FINISH SYSTEM
AT WOOD WALL CONSTRUCTION REMOVE
EXISTING 1/2" GYPSUM BOARD AT CORRIDOR SIDE
ONLY.
20. REMOVE EXISTING WINDOW TREATMENT.
21. REMOVE EXISTING WOOD BASE AND CHAIRRAIL.
22. REMOVE EXISTING WOOD PANEL WAINSCOT
SYSTEM.
23. REMOVE EXISTING ACCORDION PARTITION
SUPPORT/CLOSURE SYSTEM.
24. REMOVE EXISTING CMU PARTITION SYSTEM TO
ACCOMMODATE NEW DOOR AND FRAME AS
SCHEDULED.
25. REMOVE EXISTING CMU PARTITION SYSTEM TO
ACCOMMODATE NEW 8'-0" OPENING.
26. REMOVE EXISTING GWB PARTITION SYSTEM.
PREP EXISTING CMU WALL FOR NEW FINISH.
27. REMOVE EXISTING METAL PANEL INFILL SYSTEM IN
ENTIRETY.
28. REMOVE EXISTING CMU PARTITION SYSTEM.
29. REMOVE EXISTING EXTERIOR CMU WALL WITH
FLUTED CMU VENEER WALL SYSTEM TO
ACCOMMODATE NEW DOOR AND FRAME AS
SCHEDULED.
30. REMOVE EXISTING COPING TO ACCOMMODATE
INSTALLATION OF THE NEW ROOF SYSTEM.
31. REMOVE EXISTING GUTTER AND DOWNSPOUT
SYSTEM.
32. REMOVE EXISTING BUILT-UP ROOF SYSTEM TO
ACCOMMODATE INSTALLATION OF THE NEW ROOF
SYSTEM.
33. GRAVITY ROOF VENTS TO BE REMOVED,
COORDINATE WITH MECHANICAL DEMOLITION
DRAWINGS.
34. REMOVE PORTIONS OF THE EXISTING STANDING
SEAM FASCIA TO THE EXTENT REQUIRED TO
ACCOMMODATE INSTALLATION OF THE NEW ROOF
SYSTEM. BOTTOM OF FASCIA SHALL FOLLOW
EXISTING ROOF SLOPE.
35. EXHAUST FAN TO BE REMOVED, COORDINATE
WITH MECHANICAL DEMOLITION DRAWINGS.
36. REMOVE EXISTING ACCORDION PARTITION AND
SUPPORT/CLOSURE SYSTEM.
37. REMOVE EXISTING…