Attach-3-Price Sheet.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
WICHITA MTNS NWR-PAVEMENT REPAIRS
Solicitation number
140F0220R0045
Issued by

About this file

This document contains a price sheet attachment for a federal contract solicitation to perform pavement repairs and bridge improvements at Wichita Mountains National Wildlife Refuge. The solicitation was issued by the Department of the Interior Fish and Wildlife Service Region 2. The price sheet lists 19 line items for various repair and improvement tasks including asphalt pavement repair, milling and overlay, crack sealing, traffic striping, bridge masonry cleaning and sealing, bridge railing installation, and traffic control. It also includes costs for insurance, bonds, mobilization, overhead, and profit. The solicitation provides for award of the base requirements as well as optional additions for further road repairs via two alternatives, with the government retaining discretion to award any combination of the base and alternatives depending on available funds. Pricing is solicited for the base and each alternative.

View the file

Other files

File Type Posted
Attach-1-Drawings.pdf PDF
Sol_140F0220R0045.pdf PDF
Attach-2-Specifications.pdf PDF
Attach-4-Past Performanc and Clauses.pdf PDF
Attach-5-DBA Min. Wage Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 Attach-3-RFP 140F0220R0045

NO. ITEM NO. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL COST

1Insurance & Bonds1LS
101Mobilization1LS
Pavement Repairs - #011 Seven Mile Scenic Road and #013 West Gate Road
202Asphaltic Concrete Partial Depth Pavement Repair3,800SF
303Asphaltic Concrete Full Depth Pavement Repair796SF
404Mill & Overlay West Gate Road Sta. 116+16 to Sta. 121+4411,660SF
505Mill & Overlay 7-Mile Scenic Rd Sta. 83+08 to Sta. 88+3611,660SF
606Mill & Overlay 7-Mile Scenic Rd Sta. 151+72 to Sta. 167+5634,980SF
707Crack Seal24,000LNFT
808Traffic Striping1LS
909Traffic Control for Pavement Repairs1LS
Blue Beaver Creek Bridge Improvements
1010Masonry Cleaning – High Pressure, Hot Water, Non-Acidic Detergent1LS
1111Masonry Sealing – Apply Clear Penetrating Weather Proof Coating1LS
1212Masonry Tuckpointing430SQFT
1313Install object marker signs4EACH
1414White reflector button delineators1LS
1515Bridge Railing (Weak Post Side Mounted)125LNFT
1616Approach Guardrail Modifications1LS
1717Traffic Control for Bridge Repairs1LS
TOTAL COST1LS
18O/H
19PROFIT1LS

TOTAL BASE PRICE

ADDED ALTERNATIVE-1
A18Bid Alternatve 1: Mill & Overlay 7-Mile Scenic Rd Sta. 146+44 to Sta.
151+72 and Replace Traffic Striping11,660SF
TOTAL PRICE ALT-2
ALTERNATIVE-2
A19Bid Alternatve 2: Mill & Overlay 7-Mile Scenic Rd Sta. 141+16 to Sta.
146+44 and Replace Traffic Striping11,660SF
TOTAL PRICE ALT-2
TOTAL PRICE BASE PLUS ALT-1 AND ALT-2
NOTE: Govt is only obligated to award the Base.
Govt may award both Alt-1 and-2 or only 1 Alt, No Alt's
in any combination depending of funds availability.

File details come from the government source that posted it. Updated .