Att A_Project Overview and General Specs.doc

DOC document 142 KB Posted

Attached to
Lewis & Clark Drawbridge Roof Replacement
Solicitation number
S-73000-00017798
Issued by
Oregon

About this file

This is a Project Overview and General Specifications document prepared by the Oregon Department of Transportation (ODOT) for the Lewis and Clark Drawbridge Roof Replacement Project located at 34119 Old Bridge Lane, Astoria, Oregon. ODOT is seeking a qualified contractor to demolish and remove the existing shingle roof, roof underlayment, and gutters, then install new roof underlayment, metal roofing, and gutters. The project background indicates that the roof has been compromised due to missing shingles caused by the building's location and local wind conditions. The contractor is responsible for obtaining the building permit and scheduling all roof inspections. Substantial completion of work is required by December 1, 2026, with final completion by December 15, 2026. Work shall be performed on weekdays between 7 a.m. and 5 p.m., excluding weekends and state holidays unless approved otherwise by the ODOT Construction Project Manager, Austin VanNette. Contractors must conduct a pre-bid site visit to examine existing conditions and submit any requests for clarification in writing prior to bidding.

The contractor shall provide all labor, materials, and minor components necessary to deliver a complete and functional project, with substitutions requiring prior written approval from ODOT. All materials and equipment must be installed according to manufacturer specifications and in compliance with Oregon OSHA regulations. The contractor is responsible for site cleanup, daily debris removal, proper material storage in ODOT-approved locations, and debris disposal without assistance from ODOT. Prior to final completion, the contractor must provide digital copies of all operations and maintenance information, equipment details including manufacturer and serial numbers, final inspection reports signed by authorities having jurisdiction, marked-up record drawings showing as-built conditions and utility locations, proof that all subcontractors and suppliers have been paid, and signed certification that all project obligations have been satisfied. The contractor shall provide a one-year installation warranty on all workmanship and shall provide all applicable equipment warranties. All special inspections must be completed prior to substantial completion, with ODOT conducting inspections within five business days of the contractor's request.

View the file

Other files

File Type Posted
Map.png PNG image
Att B_Technical Specs.docx DOCX document
Att C_Building Roof Replacement Plans.pdf PDF
00017798_ITB.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A PROJECT OVERVIEW and GENERAL SPECIFICATIONS Oregon Department of Transportation

Lewis and Clark Drawbridge Roof Replacement Project Location:

Lewis and Clark Drawbridge 34119 Old Bridge Ln

Astoria, OR 97103 ODOT Contact:

The ODOT Construction Project Manager (CPM)/ Owner’s Authorized Representative for this project is Austin VanNette.

· E-mail: Austin.van_nette@odot.oregon.gov

· Cell: (503) 507-1394

· Address: Enter Work Address

The CPM may designate, in writing, an additional ODOT contact person or engineer to support with inspections or questions in the field.

Project Background Due to the building location and wind conditions in that area the roof has been compromised due to shingles missing prompting the need for a roof replacement.

Project Description:

Project includes removal of existing shingle roof, roof underlayment, and gutters; and the installation of new roof underlayment, new metal roofing, and new gutters. Contractor is responsible to obtain building permit.

Project Specifications:

See attached drawings and specifications for details.

1. Outline of work:

· Demolish and remove existing shingle roof, roof underlayment, and gutters.

· Install roof underlayment.

· Install metal roof.

· Install gutters.

· Obtain permit , schedule and coordinate roof inspection.

General Construction Notes:

· The Contractor shall make a site visit and examine existing conditions prior to providing a bid. Any discrepancies shall be brought to the attention of ODOT through a request for clarification as set forth in the bid documents.

· Clarifications shall be requested in writing prior to any installation. Incorrect installations shall be corrected at no additional cost to ODOT.

· All work shown is to be by the Contractor unless specifically noted as being by ODOT or by others. All materials shown are to be provided by the Contractor unless specifically noted as existing or provided by ODOT.

· Drawings are schematic in nature; major components and equipment are shown on the drawings. The Contractor shall supply and install all minor components and materials necessary to provide a complete and functional project whether all such components are noted in the drawings and specifications.

· Plans and specifications call out specific, manufacturers, makes and models of equipment in some locations. Substitution requests shall be made during the bid process (see ITB sections C.2.7 and C.3.1 for additional information and instructions). ODOT shall at its sole discretion determine the acceptability of substitutions. No substitutions shall be installed without prior written approval from the ODOT Project Manager.

· All equipment and materials shall be installed in accordance with the manufacturer’s published installation instructions and recommendations.

· The Contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the CPM.

Submittals

The Contractor shall provide the following submittals at a minimum to the CPM. Submittals shall be approved by the CPM prior to the start of on-site construction.

· As detailed in specifications and plans

Scheduling of Contract:

· Substantial completion of the Work shall be no later than 12/1/26. Final completion shall be no later than 12/15/26.

· After award of contract, the Contractor shall contact the CPM to schedule the Work at least ten (10) business days prior to the start of any work/demolition.

· The Work shall be accomplished on weekdays between the hours of 7 a.m. and 5 p.m. Work hours shall exclude weekends and State holidays, unless specifically requested by the Contractor and approved by the CPM.

· Any permits required for the Work are the responsibility of the Contractor. The Contractor shall provide copies of permits to the CPM prior to the start of work. The Contractor shall be responsible for posting all permits on site in accordance with local jurisdiction requirements.

· The Contractor shall submit to the CPM a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.

· Contractor shall coordinate the efforts of all suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.

Clean-Up/Conditions of Site:

· Contractor shall be responsible for keeping the CPM informed of all activity throughout the Work.

· The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each workday and neatly stack materials and debris in an approved location. The Contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the CPM.

· The Contractor shall protect materials subject to damage by temperature or other weather conditions.

· The location for storage of materials, debris, or dumpster on the premises must be approved in advance by the CPM. Disposal facilities, bins, or dumpsters will not be provided by ODOT.

· The Contractor shall notify the CPM at least five (5) days in advance of any major deliveries.

· Contractor shall immediately notify the CPM of any damage done by the Contractor to the premises, grounds, or adjacent State properties. Damage done by the Contractor to the premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.

· ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the premises.

· It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.

· The Contractor shall immediately bring to the attention of the CPM any conflicts or issues between existing utilities and the Work.

Close Out:

· All special inspections must be complete prior to Substantial Completion.

· Inspection of the work by the CPM for establishment of Substantial Completion will be made within five (5) business days after receipt of the Contractor’s email request. At this time, the CPM and the Contractor shall develop a punch list document of any incomplete or deficient work.

· Prior to Final Completion, the Contractor shall complete all items on the punch list.

· The Contractor shall provide final inspection reports for all permits applicable to this Contract signed by authorities having jurisdiction

· The Contractor shall maintain one set of the approved drawings for recording as-built conditions. Contractor shall mark (in red) the actual location of all underground utilities and any changes. At the time of Final Completion, the Contractor shall turn over the one marked-up set of record drawings to the CPM.

· Prior to Final Completion, the Contractor shall provide one (1) digital copy via email of all operations, maintenance, and warranty information to the CPM.

· Prior to Final Completion, Contractor shall provide CPM with information for all equipment provided by the project, including but not limited to: manufacturer, model, serial number, consumables, installation date, purchase date.

· Prior to Final Completion, and as prerequisite for final payment, Contractor shall provide CPM with signed certification that all subcontractors and suppliers have been or will be paid in full and in compliance with all prompt payment requirements. all disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.

· Prior to Final Completion, the Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems.

· Inspection of the work by the CPM for establishment of Final Completion will be made within five (5) business days after receipt of the Contractor’s email request.

Warranty:

· Contractor shall provide a 1 year Installation warranty on all workmanship.

· Contractor shall provide all warranties for equipment applicable to this Contract Revision: 5/7/24