This is a requirement note page document from Defense Logistics Agency (DLA) Energy containing contract texts and provisions that apply to all line items under solicitation SPE60225R0700. The document outlines detailed delivery conditions and requirements for various transportation modes including tank cars, boxcars, trucks, transport trucks, tank wagons, pipeline, and lighters.

Key provisions include delivery timeframes (48-hour notice for most deliveries, 15 days for pipeline, 24 hours for ships' bunkers), quantity determination methods, laytime calculations, and demurrage terms for tanker/barge operations. The contract period runs from date of award through March 31, 2026, with deliveries beginning April 1, 2025. The government agrees to purchase at least 60% of the total estimated contract volume. The document specifies maximum load quantities for various delivery locations, such as DFSP Charleston (281,000 BBLS), DFSP Jacksonville (282,000-295,000 BBLS), and others. For tanker operations, a daily evaluation rate of $69,500 will be used, with vessels of approximately 48,900 Metric Tons Deadweight considered standard for evaluation purposes.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Energy Bulk Petroleum - JPTS, newest first.
File Type Posted
JPTS_JA_Redacted .pdf PDF
SPE60225R0700 0003.pdf PDF
Att 2 - Fillable OSP AMD 0002.pdf PDF
SPE60225R0700 0002.pdf PDF
SPE60225R0700 0001.pdf PDF
Att 3 - Fillable Clauses.pdf PDF
SPE60225R0700.pdf PDF
Att 8 - Map Coordinate Desk Guide.pdf PDF
Attachment 2 - Fillable OSP.pdf PDF
Att 7- FAR 52.212-1 Addenda.pdf PDF
Att 6 - FAR 52.212-4 Addenda.pdf PDF
Att 4 - Subcontracting Plan.pdf PDF
Attachment 1 - QAPs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI Page 1 of 25

CUI

Defense Logistics Agency Energy Requirement Note Page

REFERENCE NO. OF DOCUMENT BEING CONTINUED: SPE60225R0700

Unless otherwise stated in the schedule, the following DLA Energy Contract Texts apply to all line items

Contract Texts are internal notes and guidance information provided here to assist with the acquisition.

F1 DELIVERY CONDITIONS FOR TANK CARS, BOXCARS, TRUCKS, TRANSPORT

TRUCKS, TRUCKS AND TRAILERS, TANK WAGONS, PIPELINE, AND LIGHTERS (DLA

ENERGY JAN 2012)

(a) On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b. tank car, boxcar, truck, transport truck, truck and trailer, tank wagon, pipeline, or lighter--

(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made upon the day specified in the order provided that the Contractor shall have received the order at least 48 hours prior to the day so specified, except for deliveries--

(i) By pipeline (other than into vessel, dredge, or barge for use as ships' bunkers) for which the Contractor shall be given 15 days' notice prior to the date so specified; and

(ii) Into vessel, dredge, or barge by any means of delivery including pipeline for use as ships' bunkers, for which deliveries the Contractor shall be given 24 hours' notice prior to the specific time delivery is to be made.

(3) All packaged or drummed material to be delivered f.o.b. boxcar, truck, or lighter shall be loaded (braced and blocked where necessary) by the Contractor as follows:

(i) RAIL SHIPMENTS IN CONTINENTAL UNITED STATES AND ALASKA.

(A) In accordance with the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract text.

(B) To the extent there is no conflict between the standards mentioned in paragraph (a) of the LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS contract text, when a freight advantage to the Government would result, the Contractor will load boxcars to maximum capacity, including multiple tiering.

(ii) TRUCK SHIPMENTS IN THE UNITED STATES. In accordance with ICC Regulations and best commercial practices.

(iii) RAIL SHIPMENTS AND TRUCK SHIPMENTS - OVERSEAS, POSSESSIONS AND TERRITORIES. In accordance with best commercial practices and local regulations, or as indicated in the Schedule.

(iv) LIGHTER. In accordance with best commercial practices.

(4) Except for supplies delivered f.o.b. boxcar, truck, or lighter, title to the supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving conveyance. Title to supplies delivered f.o.b. boxcar, truck, or lighter, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car, truck, or lighter is released to, and accepted by, the carrier.

(b) On items calling for delivery f.o.b. destination by means of tank car, boxcar, truck, transport truck, truck and trailer, tank wagon, pipeline, or lighter--

(1) Supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination and by means of the transportation equipment specified in the Schedule or, if no specific destination is indicated in the Schedule, to the destination specified in the order. Delivery shall be accomplished at Contractor's expense into Government storage or into the type of receiving equipment

CUI Page 2 of 25 otherwise specified in the Schedule or in the order, except for--

(i) Delivery by tank car which shall be accomplished by spotting the car alongside the unloading manifold connection at the specified destination;

(ii) Delivery by boxcar which shall be accomplished at the specified destination as follows:

(A) If such activity has a railroad siding, by spotting the car alongside the unloading platform or elsewhere at such destination as may be designated by the receiving activity;

or

(B) If such activity does not have a railroad siding at the unloading platform of the railroad siding serving such activity, and if the freight tariff provides for free pickup and delivery service, delivery shall be made to the activity specified in the order;

(iii) Delivery by truck which shall be accomplished by spotting the truck at the unloading platform at the specified destination and by placing the drummed or packaged supplies at the tailgate of the truck; and

(iv) Delivery by lighter which shall be accomplished as indicated in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries by tank car or boxcar shall be made within 24 hours from the time specified in the order, provided that such order shall have been received by the Contractor at least 120 hours prior to the time so specified; all other deliveries, except as hereinafter indicated, shall be made on the day specified in the delivery order and unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that such order shall have been received by the Contractor at least 48 hours prior to the days so specified.

Pipeline deliveries (except those into vessel, dredge, or barge) shall be made on the day specified in the delivery order, provided the order shall have been received by the Contractor at least 15 days prior to the day so specified. Delivery into vessels, dredges, or barges from a marine service station or by means of transport truck, truck and trailer, tank wagon, or pipeline shall be made at the specific time specified in the order, provided that such order shall have been received by the Contractor at least 24 hours prior to the specific time such delivery is required to be made.

(3) The Contractor shall not be required to deliver by transport truck or truck and trailer a quantity less than a full load nor into more than one storage tank, with the following exceptions:

(i) An order placed under an item of this contract calling for delivery by transport truck of motor gasoline, fuel oil, diesel fuel, or kerosene, or, if this procurement is for Central America only, jet fuel, may require delivery of a quantity as low as 5,200 gallons whenever the activity is restricted either by a tank capacity or by a directive from receiving a larger quantity; and

(ii) Where the Schedule provides for multiple drop delivery, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer is the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.

(4) The Contractor shall not be required to deliver by tank wagon a quantity of less than 575 liters (or 150 gallons) but, at the Government's option, may be required to deliver into more than one storage tank.

(5) When delivery of fuel oil or lubricating oil is made by tank car, such car shall be equipped with steam coils, if specified in the order, to facilitate the unloading of such product.

(6) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.

(7) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility--

(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor's delivery personnel who have not exercised reasonable care and delivery equipment which is poorly maintained, may be refused entrance to the installation by the installation Commander.

(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

(8) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.

(9) Except for supplies delivered by tank car, boxcar, truck, or lighter, title to supplies delivered, and risk of loss thereof, shall pass from the Contractor to the Government when the supplies pass into the receiving facilities. Title to supplies delivered by tank car or boxcar, and risk of loss thereof, shall pass from the Contractor to the Government at the time the car is released by the carrier for unloading.

CUI Page 3 of 25

Title to supplies delivered by truck, and risk of loss thereof, shall pass from the Contractor to the Government when the drummed or packaged supplies are removed from the truck. Title to supplies delivered by lighter, and risk of loss thereof, shall pass from the Contractor to the Government at the time the receiving vessel's tackle is attached to the supplies to be unloaded.

F1.08 DELIVERY AND CONTRACT PERIODS FOR PIPELINE AND TANK CAR

DELIVERIES (DOMESTIC BULK) (DLA ENERGY JAN 2018)

(a) The period of this contract during which the Ordering Officer may order, pursuant to the contract text DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT, is from date of award through March 31, 2026.

(b) Notwithstanding (a) above, except at its option, the Contractor shall not be required to make delivery hereunder prior to April 1, 2025.

(c) Insofar as practicable, the Government will attempt to lift in approximately equal monthly quantities. Except at its option, a supplier which offered product over the period April 1, 2025 through March 31, 2026 shall not be required to--

(1) Make deliveries of any grade of product at a daily rate in excess of the contract quantity of such grade of product for delivery at or shipment from each designated refiner or bulk plant location divided by 365 days; or

(2) Accumulate any such product at any such location and to subsequently make deliveries in excess of 8.33% in any one month of the contract quantity of the applicable grade of product; provided, however, that where the maximum quantity available for individual deliveries as specified in the contract is greater than 8.33% percent per month, the supplier will accumulate any such product at any such location and subsequently make deliveries equal to the specified maximum quantity available for individual deliveries and, provided further, that the supplier will be required to make delivery in excess of 8.33% per month if the delivery is to be made f.o.b. tanker at origin and no other quantities have been ordered for delivery during the applicable month and the 30,000 barrels minimum, under (d) below, is greater than such 8.33% quantity.

F1.08-1 DELIVERY AND CONTRACT PERIODS FOR TANK TRUCK DELIVERIES

(DOMESTIC BULK) (DLA ENERGY JAN 2018)

(a) The period of this contract during which the Ordering Officer may order pursuant to the DELIVERY-ORDER LIMITATIONS - SCOPE OF CONTRACT contract text is from date of award through March 31, 2026.

(b) Notwithstanding (a) above, except at its option, the Contractor shall not be required to make delivery hereunder prior to April 1, 2025.

(c) Insofar as practicable, the Government will attempt to lift in approximately equal monthly quantities. Except at its option, a supplier which offered product over the period April 1, 2025 through March 31, 2026 shall not be required to--

(1) Make deliveries of any grade of product at a daily rate in excess of the contract quantity of such grade of product for delivery at or shipment from each designated refiner or bulk plant location divided by 365 days; or

(2) Accumulate any such product at any such location and to subsequently make deliveries in excess of 8.33% in any one month of the contract quantity of the applicable grade of product; provided, however, that where the maximum quantity available for individual deliveries as specified in the contract is greater than 8.33% per month, the supplier will accumulate any such product at any such location and subsequently make deliveries equal to the specified maximum quantity available for individual deliveries and, provided further, that the supplier will be required to make delivery in excess of 8.33% per month if the delivery is to be made f.o.b. tanker at origin and no other quantities have been ordered for delivery during the applicable month and the 30,000 barrels minimum, under (d) below, is greater than such 8.33% quantity.

Fl.09 DETERMINATION OF QUANTITY (DLA ENERGY AUG 2015)

Quantity. The quantity of supplies furnished under this contract shall be determined as follows:

Free on Board (f.o.b.) origin. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

CUI Page 4 of 25

Deliveries into tanker or barge.

On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tanker or barge, the quantity shall be determined (at the Contractor's option) on the basis of calibrated meter; or Shipping/shore tank measurement.

Deliveries into pipeline.

On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a pipeline, the quantity shall be determined (at the Contractor's option) on the basis of calibrated meter; or shipping tank measurements.

Deliveries into rail tank car.

On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter; or, using calibrated scales; or certified capacity table for the rail tank car.

Deliveries into tank truck, truck and trailer, or tank wagon.

On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into a tank truck, truck and trailer or tank wagon, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter; or weight, using calibrated scales; or certified capacity table for the conveyance or container.

Deliveries into intermodal container.

On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis into an intermodal container, the quantity shall be determined (at the Contractor's option) on the basis of calibrated loading rack meter, loading either through top or bottom tank outlets (top loading requires loading gantry or "fall arrest" system), or certified capacity table for the container, or weight, using calibrated scales.

F.o.b. destination.

Deliveries by tanker or barge.

On items requiring delivery on an f.o.b. destination basis by tanker or barge, the invoice quantity shall be determined (at the Government's option) on the basis of calibrated meters on the receiving tank system; or receiving tank measurements. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries by pipeline.

On items requiring delivery by pipeline on an f.o.b. pipeline junction or f.o.b. destination basis, the invoice quantity shall be determined (at the Government's option) on the basis of calibrated meters on the pipeline junction or the receiving tank system; or receiving tank measurements.

F.o.b. pipeline junction is defined as the junction between a Contractor-owned or controlled pipeline and a Government-owned or controlled pipeline. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries by rail tank car.

On items requiring delivery on an f.o.b. destination basis by rail tank car, the quantity of supplies furnished under this contract shall be determined (at the Government's option) on the basis of calibrated meter on the receiving tank system; or weight, using calibrated scales at the receiving

CUI Page 5 of 25

. CUI

location; or certified capacity table for the rail tank car; or receiving tank measurements. All invoice quantities shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius).

Deliveries by tank truck/truck and trailer/tank wagon/intermodal container.

On items requiring delivery on a f.o.b. destination basis by tank truck, truck and trailer, tank wagon or intermodal container, the quantity shall be determined -in the following order of preference:

Calibrated temperature compensating meters on the receiving system (as identified in the schedule).

Calibrated temperature compensating meter on the delivery conveyance (as identified in the schedule). Weight, using calibrated scales at the receiving location (as identified in the schedule).

Calibrated meters on the receiving system, requiring manual volume correction (as identified in the schedule).

Loading ticket mechanically imprinted with the volume corrected (net) quantity. The ticket must be generated at the time of loading and be based on a calibrated loading rack meter or calibrated scales.

Calibrated meter on the delivery conveyance, requiring manual volume correction Loading ticket, not volume corrected (requiring manual volume correction).

Invoice quantities for all residual fuels and lubricating oils and invoice quantities for other products that are in excess of 5,000 gallons (or 18,900 liters) shall be converted to net gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius). Invoice quantities of non-residual fuels which are less than 5,000 gallons (or 18,900 liters) do not require correction to net gallons (or liters). For this purpose, residual fuels are any products with a viscosity equal to or greater than a regular (not light) number 4 fuel oil (ASTM D 396).

Water bottoms.

Every delivery must be free of all water bottoms prior to discharge; and The Contractor is responsible for their removal and disposal.

Measurement restrictions. All methods of measurement described in this contract text are subject to government safety and environmental restrictions, foreign or domestic. Such restrictions may prohibit, or render ineffective, a particular method in some cases.

Measurement standards. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS). Outside the U.S., other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor to the aforementioned measurement and calibrations standards. In addition, the following specific standards will be used as applicable:

API MPMS Chapter 11.1, Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils (this chapter is an adjunct to ASTM D 1250, IP 200 and International Organization for Standardization (ISO) 91-1). Either the 2004 or 1980 version of the standard may be used. Either the printed tables (an adjunct to the 1980 version) or the computer subroutine version of the standard may be used. In case of disputes, the computer subroutine for the 2004 version of the standard will be the referee method.

For crude oils, JP4, and Jet B, use Volume I, Tables 5A and 6A; Volume VII, Tables 53A and 54A; or Volume IV, Tables 23A and 24A.

For lubricating oils, use Tables 5D and 6D, Tables 53D and 54D, or Tables 23D and 24D.

For all other fuels and fuel oils, use Volume II, Tables 5B and 6B; Volume VIII, Tables 53B and 54B; or

Volume V, Tables 23B and 24B.

For chemicals/additives use Volume III, Table 6C (or Volume IX, Table 54C), or volume correct in accordance with the product specification.

Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels

CUI Page 6 of 25 at 60 degrees Fahrenheit. Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.

As an option to (b) (1) (v), liters may be converted to gallons using Table Fl.09A (see below).

If this option is used, it must be agreed upon by both parties and shall remain in effect for the duration of the contract. Should foreign law restrict conversion by this method, the method required by law shall be stated in the offer.

If the original measurement is by weight and quantity is required in U.S. gallons, then- Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.

Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees

Fahrenheit. API MPMS, Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 12 months, whichever is more frequent. A meter calibration log/calibration certificates shall be maintained which as a minimum contains number/name of each meter; calibration frequency; date of the last calibration; due date for next calibration; name and signature of the person performing the calibration; traceability to master meter/prover used for calibration; and calibration report number.

Each meter shall be marked with the date of the last calibration and due date for the next calibration. All calibration meter records and logs/certificates shall be kept on file and made available. All calibration records (including logs or certificates) shall be retained on file for a period of three years.

API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of a tank shell correction factor is not required unless its use is a customary practice for custody transfer.

Table F1.09a Conversion Factor Table

Density @ 15ºC Gallons at 60ºF to Liters at 15ºC;

Multiply by

Liters at 15C to Gallons at 60F, Multiply by

0.723 – 0.768 3.78286 0.26435

0.769 – 0.779 3.78309 0.26433

0.780 – 0.798 3.78334 0.26432

0.799 – 0.859 3.78356 0.26430

0.860 – 0.964 3.78381 0.26428

0.965 – 1.074 3.78405 0.26427

Shipping documentation. When the Contractor's shipping document (such as a truck's metered ticket) is used to determine, or verify, the payment quantity under this contract, the following information shall be provided on that shipping document: gross and net quantity (gallons or liters, as required), observed and corrected API gravity/density, and the temperature (Fahrenheit or Celsius) at which the product was measured. This information shall be mechanically imprinted on the shipping document. Although this will apply primarily to the use of meters in various applications, it also applies to any other quantity determination method. The following exceptions apply:

Where Government documents are the sole basis for payment, such as Department of Defense

(DD) Form 250/250-ls, the information is not required.

CUI Page 7 of 25

Where conveyances with temperature-compensating meters are used, the shipping document shall only be annotated with the corrected API gravity/density, the net quantity, and a statement that a temperature-compensating meter was used to determine net quantity.

Where conveyances with temperature compensating meters are not used, the shipping document shall be only be annotated with the API gravity (or density), gross quantity, and a statement that volume correction was not required.

Right to representative. For f.o.b. origin deliveries, the Government has the right to have a representative present to witness the measurement of quantity. For f.o.b. destination deliveries, the Contractor has the right to have a representative present to witness the delivery and measurement of quantity.

Fl.25 DELIVERY AND ORDERING PERIODS (DLA ENERGY MAY 2022)

(a) This contract text applies to all modes of delivery, whether origin or destination.

(b) The period of this contract during which the Ordering Officer may order and the Contractor shall deliver, if ordered, shall be as follows unless the item in the Schedule specifies otherwise:

(1) Ordering Period Begins: Date of Award and Ends: March 31, 2025.

(2) Delivery Period Begins: April 1, 2024 and Ends: 30 days after the end of the ordering period.

(c) Notwithstanding the foregoing, deliveries made prior to the delivery period at the option of the Contractor and pursuant to an order by the Government shall be deemed to have been made under this contract at the applicable contract price(s).

(d) To the extent practicable, the Government will attempt to lift in approximately equal monthly quantities for the life of the contract. However, if the monthly pro rata is less than the Contractor's maximum parcel size regardless of mode the Government reserves the right to order volumes equal to the maximum parcel size per delivery. Where the maximum parcel size available for individual deliveries as specified in the contract is greater than the monthly pro rata, the supplier will accumulate any such product at any such location and subsequently make deliveries equal to the specified maximum quantity available for individual deliveries.

(e) Except at its option, the Contractor shall not be required to deliver f.o.b. tanker at origin in any one delivery a quantity of product(s) less than 50,000 barrels, except when the minimum quantity available for individual deliveries as specified in the contract is less than 50,000 barrels.

(f) Nothing included in this contract text shall restrict the Government's rights under the

DELIVERY- ORDER LIMITATIONS - SCOPE OF CONTRACT.

F1.35 DETERMINATION OF QUANTITY (JPTS) (DLA ENERGY APR 2002)

(a) QUANTITY. The quantity of supplies furnished under this contract shall be determined as follows:

(1) DELIVERIES INTO OR BY RAIL TANK CAR.

(i) F.O.B. ORIGIN.

(A) On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of--

(a) Calibrated meter;

(b) Weight, using calibrated scales; or

(c) The certified capacity table for the rail tank car.

(B) The Government will have the right to have a representative present to witness the measurement of quantity.

(ii) F.O.B. DESTINATION. On items requiring delivery on an f.o.b. destination basis, the

CUI Page 8 of 25 quantity of supplies furnished under this contract shall be determined (at the Government's option) on the basis of--

(A) The certified capacity table of the rail tank car received;

(B) Weight, using calibrated scales; or

(C) Calibrated meter.

(D) The Contractor has the right to have a representative present to witness the delivery and measurement of quantity.

(2) DELIVERIES INTO OR BY TANK TRUCK/TRUCK AND TRAILER/TANK WAGON.

(i) F.O.B. ORIGIN.

(A) On items requiring delivery at the Contractor's refinery, terminal, or bulk plant on an f.o.b. origin basis, the quantity shall be determined (at the Contractor's option) on the basis of--

(a) Certified capacity tables of the conveyance loaded;

(b) Calibrated meter; or

(c) Weight, using calibrated scales.

(B) The Government has the right to have a representative present to witness the measurement of quantity.

(ii) F.O.B. DESTINATION.

(A) In any case, at the Government’s option, quantity may be determined at the receiving activity on the basis of—

(a) Weight, using calibrated scales; or

(b) A calibrated meter on the receiving tank system.

(B) If the Government does not elect to use one of the methods in (A) above, the quantity shall be determined (at the Contractor’s option) on the basis of--

(a) Calibrated meter;

(b) Certified capacity tables. The tables must be made available at the time of delivery;

(c) Certified tank calibration markers. Certified tank calibration markers will not be accepted unless the conveyance is full to the marker and the entire quantity is delivered; or

(d) The net quantity determined at the loading point by a calibrated loading rack meter or calibrated scales. This quantity must be mechanically imprinted on the loading rack meter ticket that is generated by the loading rack meter or calibrated scales.

(iii) WATER BOTTOMS.

(A) Every delivery must be free of all water bottoms prior to discharge; and

(B) The Contractor is responsible for their removal and disposal.

(b) VOLUME CORRECTION. Volume correction to gallons at 60 degrees Fahrenheit (or liters at 15 degrees Celsius) is required for--

(1) All product volumes measured in storage tanks and rail tank cars.

(2) All other volumes of fuels and fuel oils measured in tank trucks, trucks and trailers, and tank wagons which are in excess of 3,500 gallons.

(c) MEASUREMENT STANDARDS. All measurements and calibrations made to determine quantity shall be in accordance with the most recent edition of the API Manual of Petroleum Measurement Standards (MPMS) Outside the U.S., other technically equivalent national or international standards may be used. Certified capacity tables shall mean capacity tables prepared by an independent inspector or any independent surveyor. In addition, the following specific standards will be used as applicable:

(1) API MPMS Chapter 11.1, Volume Correction Factors (API 2540/ASTM D 1250/IP 200/ISO 91-1). Either the printed version or the computer subroutine versions of the standard may be used. In case of disputes, the computer subroutine shall be the referee method.

(i) Use Volume II, Tables 5B and 6B (or Volume VIII, Tables 53B and 54B).

(ii) Volume XII, Table 52, shall be used to convert cubic meters at 15 degrees Celsius to barrels of 60 degrees Fahrenheit. Convert liters at 15 degrees Celsius to cubic meters at 15 degrees Celsius by dividing by 1,000. Convert gallons at 60 degrees Fahrenheit to barrels at 60 degrees Fahrenheit by dividing by 42. Should foreign law restrict conversion by this method, the method required by law shall be used.

(iii) If the original measurement is by weight and quantity is required in U.S. gallons, then--

CUI Page 9 of 25

(A) Volume XI, Table 8, shall be used to convert pounds to U.S. gallons at 60 degrees Fahrenheit.

(B) Volume XII, Table 58, shall be used to convert metric tons to U.S. gallons at 60 degrees Fahrenheit.

(2) API MPMS, Chapter 4, Proving Systems. All meters used in determining product volume shall be calibrated using this standard with the frequency required by local regulation (foreign or domestic). If no local regulation exists, then the frequency of calibration shall be that recommended by the meter manufacturer or every 6 months, whichever is more frequent.

(3) API MPMS Chapter 12, Calculation of Petroleum Quantities. All calculations of net quantities shall be made in accordance with this chapter. Outside the U.S., use of a tank shell correction factor is not required unless its use is a customary practice for custody transfer.

F14 SHIPMENT AND ROUTING (DLA ENERGY OCT 2020)

a) The Contractor shall make shipments of the supplies called for by this contract, or ordered hereunder, if this is an indefinite delivery contract, by the method specified in the Schedule, to the delivery point, in the quantity, and according to the delivery date specified in the Schedule or the order.

b) On items calling for delivery at Contractor's refinery, terminal, or bulk plant on an f.o.b.

origin basis, transportation equipment will be furnished by the Government. Whenever any item of the Schedule specifies delivery by more than one method, selection of the method to be used shall be at the Government's option. Government-furnished transportation equipment that the Contractor finds unsatisfactory for loading shall be reported as follows:

1. Tankers and Barges. Report to the Quality Assurance Representative (QAR).

2. Tank Cars. Report to the QAR/Government Representative and Military Surface

Deployment and Distribution Command, ATTN: Rail Fleet Manager, 1 Soldier Way, Scott AFB, IL 62225 or email usarmy.scott.sddc.mbx.dodx@mail.mil. Any shortage or overage of tank cars shall be similarly reported.

3. Pipeline, Transport Trucks, Trucks and Trailers, and Tank Wagons. Report to the

QAR/Government Representative and to carrier's general office, or to home base or station, of such equipment.

4. In each case above, also report to the Defense Logistics Agency (DLA) Energy Regional Office having jurisdiction over the area in which shipment originates.

c) If the supplies are to be delivered f.o.b. pipeline, barge, tank car, truck, transport truck, truck and trailer, or tank wagon

1. For f.o.b. origin deliveries, unless otherwise directed by the DLA Energy Regional Office placing orders, the Contractor shall create shipments for transportation services using USBank’s Syncada, with software and training to be provided by USBank. All Syncada users must complete the following annual training:

i. Certifying Officer Legislation (COL)

ii. Transportation Pay

iii. Advanced Syncada Training

2. Daily Load List. For f.o.b. origin and destination truck deliveries, on each day truck(s) are loaded, the Contractor shall send by email a daily load list to the DLA Energy Regional Office having oversight of the contract and receiving locations.

3. For f.o.b. origin truck deliveries:

i. The Contractor shall upload all Bills of Lading (BOLs) at time of shipment transaction using

USBank Syncada.

ii. The Contractor shall comply with transportation and routing instructions furnished by the

DLA Energy Regional Office. Such instructions will include carrier names, routes, route order numbers, and other pertinent shipment information. The Contractor shall be responsible for the scheduling of commercial transport trucks to its plant in accordance with such routing instructions and consonant with mailto:usarmy.scott.sddc.mbx.dodx@mail.mil

CUI Page 10 of 25 the applicable order. All charges due to Contractor caused delays at the loading facility, including improper equipment scheduling, will be the responsibility of the Contractor.

iii. Motor Carrier Performance Reporting. The Contractor shall maintain a daily written log of motor carrier performance to include carrier, destination, number of trucks ordered, number of trucks furnished, and deficiencies. On the last business day of each calendar month, the Contractor shall forward a copy of the daily written logs to the DLA Energy Americas office having oversight of the motor carrier contract.

4. On f.o.b. destination items involving multiple car or truck load shipments, the Contractor shall assign one shipment number for shipments of supplies made on the same day, to the same destination, against the same contract line item.

d) On all tank car shipments, whether delivery is made on an f.o.b. origin or f.o.b. destination basis, the Contractor shall send to the consignee at the time of shipment a prepaid telegraphic notice that shall indicate grade of product, date of shipment, car and seal numbers, bill of lading number, and net quantities.

e) When required by the contract, or requested by the Government, the Contractor shall furnish serially numbered seals and effectively seal all tank cars, transport trucks, trucks and trailers, and tankers and barges (where sea suction and overboard discharge valves are present), whether delivery is made on an f.o.b. origin or f.o.b. destination basis. The marking on the seal shall be indicated on all shipping documents.

f) 1. If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded, by car number, and will furnish this information to the DLA Energy Regional Office upon receipt.

2. Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

3. The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

g) Placards, as required by 49 CFR 172.506 and 49 CFR 172-508, shall be furnished and affixed to all tank cars and tank trucks by the Contractor unless placards are already affixed.

h) The Contractor shall inspect all shipping conveyances, with the exception of government-furnished tankers and barges, prior to loading to ensure that product loaded will not be lost or contaminated by the condition of the conveyance. (Authorization for the Contractor to participate in the inspection of Government-furnished tankers and barges rests with QAR. The QAR has the right to inspect any Government-furnished conveyance prior to loading and, in the event the Contractor and the QAR disagree on the suitability to load such a conveyance, the determination of the QAR shall govern.)

Only qualified Contractor personnel may perform inspections. In the case of tank trucks, Contractor may not delegate inspection responsibility to the operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of qualified Contractor personnel.

FI5 BARGE AND/OR SHALLOW DRAFT TANKER DEMURRAGE AND LOADING

CONDITIONS (DLA ENERGY JUNE 2022)

On items calling for delivery f.o.b. barge and/or shallow draft tanker at origin--

(a) DELIVERY DATES.

(1) Unless otherwise specified in the Schedule, orders placed under items of the Schedule calling for delivery f.o.b. barge and/or shallow draft tanker at Contractor's refinery, terminal, or bulk plant will be furnished to the Contractor at least 15 days in advance of the date on which delivery is to be made, which date is hereafter referred to as the "scheduled delivery date." Each order will specify the quantity to be delivered, the scheduled delivery date, and the cargo number, and, if then available, the name of

CUI Page 11 of 25 the barge and/or shallow draft tanker (herein referred to as "vessel") to be loaded.

(2) The scheduled delivery date may be revised by the Ordering Officer at any time and, unless the Contractor registers objections with the Ordering Officer within 72 hours of receipt of such revised scheduled delivery date, such revised date shall become the new agreed scheduled delivery date. At the time the Contractor registers any such objections, the Contractor must provide a date, subsequent to the date proposed by the Ordering Officer, which represents the earliest date the Contractor can provide a berth. The Ordering Officer must confirm or reject the alternate date provided by the Contractor within 72 hours of receipt of the Contractor's objection. If the Ordering Officer chooses to accept the alternate date provided in the Contractor's objection, such revised date shall become the new agreed scheduled delivery date. If the Ordering Officer chooses to reject the alternate date provided by the Contractor, the scheduled delivery date will return to the previously scheduled delivery date.

(3) All communications regarding the establishment and revision of the scheduled delivery date and objections thereto shall be set down in writing at such time or promptly confirmed in writing.

(b) EXPECTED TIME OF ARRIVAL.

(1) For Barge deliveries, the vessel designated to lift the cargo will notify the Contractor’s load facility at the method provided by the Contractor in K28.01 NOTIFICATION OF VESSEL EXPECTED TIME OF ARRIVAL (ETA) of the vessel name and the expected hour of arrival at least 24 hours before the expected time of arrival. When vessels are scheduled to load at more than one contract source within a port complex, the 24 hour notices will be provided by the vessels to all contract sources at the same time as the notice is provided to the first contract source and will stipulate the order of loading.

(2) For Shallow Draft Tanker deliveries, the vessel designated to lift the cargo will notify the Contractor’s load facility by the method provided by the Contractor in K28.01 NOTIFICATION OF VESSEL EXPECTED TIME OF ARRIVAL (ETA) of the vessel name and the expected hour of arrival at least 72 hours before the expected time of arrival, and at additional intervals of 48 and 24 hours before expected arrival. When vessels are scheduled to load at more than one contract source within a port complex, the 72-48-24 hour notices will be provided by the vessels to all contract sources at the same time as the notice is provided to the first contract source and will stipulate the order of loading.

(c) LAYTIME. The Contractor shall provide as soon as possible, but within 3 hours after receipt of notice of readiness to load from the vessel designated to load the cargo, a reachable berth free of cost to the Government, where the vessel can be safely moored and remain afloat at all times, for loading of the ordered supplies. Laytime shall commence, berth or no berth, either at the expiration of 3 hours after notice of readiness, or immediately when the vessel moors alongside, with or without notice of readiness, whichever first occurs; PROVIDED, however, that--

(1) If the vessel is tendered for loading on a date earlier than the last scheduled delivery date as determined pursuant to paragraph (a) above, the Government scheduled vessel shall be loaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or at 0300 local time on the last agreed schedule delivery date, whichever first occurs.

(2) If the vessel is tendered for loading later than noon on the day following the last agreed scheduled delivery date, as determined pursuant to paragraph (a) above, the vessel shall be loaded as soon as possible in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to have the vessel loaded as soon as is reasonably possible under the circumstances prevailing at the time.

(3) Laytime shall continue 24 hours a day, 7 days a week, without interruption from its commencement until loading of the vessel is completed and the vessel has been released for sailing by the Government Quality Representative.

(d) ALLOWED LAYTIME.

(1) BASIC ALLOWED LAYTIME.

(i) For cargo movements under DLA Energy bulk petroleum contracts via barge, the Contractor shall be allowed 1 hour for each 2,000 barrels loaded.

(ii) For cargo movement under DLA Energy bulk petroleum contracts via shallow draft tanker, the contractor shall be allowed 1 hour for each 3,500 barrels loaded.

(2) INCREASES TO BASIC LAYTIME.

(i) If, after laytime commences, the condition of the vessel to be loaded does not permit loading, such basic allowed laytime shall be increased by the duration of such delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, such basic allowed laytime will be increased by the duration of such delay that occurred after laytime commenced.

(iii) If regulations of the owner, operator of the vessel, Customs Officials, or Port Authority prohibit loading at any time after laytime commenced, time so lost shall be added to the basic allowed

CUI Page 12 of 25 laytime.

(iv) If for any reason the Contractor is delayed in loading the vessel or there is a delay in releasing the vessel for sailing because of action of the U.S. Government that arises out of causes beyond the control and without the fault or negligence of the Contractor, such basic allowed laytime shall be increased by the duration of such delay.

(v) If the vessel requests cargo tanks be cushioned or topped off during the loading process and the quantity of product cushioned or topped including the time spent cushioning/topping tanks is noted on the DD Form 250-1, Loading/Inspection Report, the basic allowed laytime shall be increased by the difference between the actual time taken to cushion/top tanks and the amount of time required to pump the same quantity of cushioned/topped product at the Contractor's actual loading rate exclusive of cushioning/topping time and cushioning/topping quantity.

(vi) Contractor will be allowed up to 4 hours of additional laytime following removal of cargo hoses until vessel is released by the inspector in order to accomplish tasks required under the CONTRACTOR INSPECTION RESPONSIBILITIES contract text.

(vii) There will be no increases made to the basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings.

(viii) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing basic allowed laytime for one half of the delay.

(e) For all hours of laytime that elapse in excess of allowed laytime for loading provided for by paragraph (d) above, demurrage shall be paid by the Contractor as follows:

(1) TIME CHARTER VESSELS. At the demurrage rate for the vessel loaded, computed to the nearest whole hour, as published by the U.S. Government, and in effect on the date loading of the vessel is completed.

(2) The demurrage rate set forth in the Carrier's Tender of Freight Services and Demurrage Invoice to the Government.

(3) CONTRACT VESSELS. At the hourly rate specified in the contract.

(f) Hoses for loading a vessel shall be furnished, connected, and disconnected by the Contractor;

loading arm shall be connected and disconnected by the Contractor.

(g) Title to the supplies delivered and risk of loss thereof shall pass from the Contractor to the Government when the supplies pass the vessel's permanent hose connection.

F16.01 BARGE/SHALLOW DRAFT TANKER DEMURRAGE AND UNLOADING

CONDITIONS (BULK) (DLA ENERGY JUNE 2022)

On items calling for delivery f.o.b. destination by means of barge or shallow draft tanker—

(a) The term shallow draft tanker, as used herein, shall include coastal tankers.

(b) DELIVERY DATES AND DESTINATION. The supplies ordered hereunder shall be delivered, all transportation charges paid, to the destination specified in the Schedule. Unless otherwise specified in the Schedule, orders placed under items of the Schedule calling for delivery f.o.b.

destination barge or shallow draft tanker will be furnished to the Contractor at least 15 days in advance of the date on which delivery is to be made, hereinafter referred to as the "scheduled delivery date." Each order will specify the quantity to be delivered and the scheduled delivery date.

The scheduled delivery date may be changed by the Contractor at any time if the Ordering Officer approves.

(c) PROVISION OF BERTH. For deliveries occurring on the date of the latest approved scheduled delivery date, the Government will provide, free of cost, a reachable safe berth for the tug and tow or self-propelled barge or shallow draft tanker to be afloat at all times at the unloading port within 3 hours of the conditions at (c)(1) and (c)(2) being met. For deliveries occurring on a date other than the latest approved scheduled delivery date, the Government will provide safe berth within 12 hours of the conditions at (c)(1) and (c)(2) being met.

(1) Issuance of Notice of Readiness (NOR) to unload by the Master or Mate of the vessel designated to discharge; and

(2) The ordered product has been found acceptable in accordance with QAP E1 CONTRACTOR

CUI Page 13 of 25

INSPECTION RESPONSIBILITIES.

(d) COMMENCEMENT OF LAYTIME. Laytime shall commence at the sooner of either: (i) the expiration of the provision of berth period prescribed by (c) above (the 3 hours or the 12 hour period, as the case may be), berth or no berth; or (ii) subject to the conditions in (c)(2) having been met, upon the barge's or shallow draft barge’s arrival in berth. Laytime shall continue 24 hours a day, 7 days a week, without interruption from its commencement, until unloading of the barge or shallow draft tanker is completed and the hoses have been disconnected.

(e) ALLOWED LAYTIME

(1) BASIC ALLOWED LAYTIME. (i) For barges, unless otherwise provided in the Schedule, the Government shall be allowed and will complete unloading within laytime determined as follows: 1 hour for each 2,000 barrels of supplies to be unloaded, plus 1 1/2 hours.

(ii) For shallow draft tankers, unless otherwise provided in the Schedule, the Government shall be allowed and will complete unloading within laytime determined as follows: 1 hour for each 3,500 barrels of supplies to be unloaded, plus 1 ½ hours.

(2) INCREASES TO ALLOWED LAYTIME.

(i) If the condition of the barge or shallow draft tanker to be unloaded does not permit unloading within the number of hours determined in accordance with (e)(1) above, such allowed laytime shall be increased by a number of hours sufficient to permit the unloading of the barge.

(ii) If the barge or shallow draft tanker is delayed in reaching its berth within 3 hours or 12 hours, as the case may be, from the time the conditions in (c)(1) and (c)(2) have been met, and the delay is caused by the fault of the barge or shallow draft tanker, such allowed laytime shall be increased by the duration of such delay.

(iii) If regulations of the owner or operator of the barge or shallow draft tanker prohibit unloading at any time, time so lost shall be added to the amount of such allowed laytime.

(iv) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing basic allowed laytime for one-half of the delay.

(f) DEMURRAGE PAYABLE. For all hours of laytime that elapse in excess of the allowed laytime for unloading provided for by (e) above, or as otherwise provided for in the Schedule, demurrage will be paid by the Government at the demurrage rate in the charter for the barge or shallow draft tanker unloading.