Att 2-Contractor Requirements Submission Matrix.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Diesel Engine Maintenance and Overhaul
Solicitation number
H92240-20-T-0027
Issued by

View the file

Other files

File Type Posted
Attachment 6 - Questions.xlsx XLSX spreadsheet
H92240-20-T-0027.pdf PDF
Att 1 - Performance Work Statement (PWS).pdf PDF
Att 3-IDIQ Pricing Worksheet.xlsx XLSX spreadsheet
Att 3a-Material Services Worksheet.xlsx XLSX spreadsheet
Att 5-QASP.pdf PDF
Att 4-Wage Determination 15-5148 (Rev. -11).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 2 - Contactor Requirements Submission Matrix
PWS Ref.PWS RequirementINSTRUCTIONS: Quoters shall provide the certifications or other information as part of its Technical Volume to demonstrate how its proposed approach meets the below requirements. In each line below, provide a brief statement of how the proposed approach meets the requirements and identify where the supporting information is contained in your Technical Volume.
4.6.2Capacity Requirement - Ability to complete the required quantity of Work Packages in the required time limit (PWS 4.6.2: Contractor shall be able to complete up to four (4) individual or combined Work Packages in a five (5) week period...).
Exhibit 1, 4.7Task Accomplishment - Ability to complete the pre-defined individual Work Packages identified under PWS Exhibit 1 in the required time frames allotted (PWS 4.7: Open and Inspect (Work Package 0001) - 1 week, Overhaul (Work Package 0002) – 4 weeks, Dynamometer (Work Package 0003) - 1 week, 24 M Maintenance (Work Package 0004) - 2 weeks, 24 M-1 Maintenance (Work Package 0005) – 2 weeks).
4.8.1Personnel Qualifications - Caterpillar Original Equipment Manufacturer (OEM) marine engine certified Maintenance Technicians with current certifications (PWS 4.8.1).
4.6.1Location - Contractor facilities, where all maintenance and repair work shall be performed, shall be within a sixty (60) mile radius of the Government site, Stennis Space Center, Mississippi (PWS 4.6.1).
4.6.1Facilities - Facilities must be adequate to complete quality repairs, maintenance, and preservation, as specified in the PWS. Caterpillar authorized dealer/service center with current authorization documentation.
4.6.3Equipment - Equipment of sufficient quality to complete all required testing (such as dyno testing, measurements, etc.), repairs, maintenance, and preservation (media blasters, paint booths & application equipment) to produce a high quality (mechanically and aesthetically) end product.