Repair and Test Fuel System, Point Reyes National Seashore

Repair and Test Fuel System

Point Reyes National Seashore

STATEMENT OF WORK (SOW)

STATEMENT OF WORK

1.0 Background

2.0 Scope

3.0 Objectives

4.0 Tasks

5.0 Delivery

6.0 Government-Furnished Property

7.0 Site-Specific Safety and Health Plan

8.0 Place of Performance

9.0 Period of Performance

10.0 Area Maps

11.0 AST and PMC Fuel System Cut Sheets

1.0 Background

Point Reyes National Seashore (PRNS), located in Marin County, California, has a requirement for the repair and testing of a marine gasoline fueling system and Above Ground Storage Tank (AST). This PMC Fuelhouse Marine fuel dispensing system and Hoovervault AST is operated by the Park in support of its Visitor and Resource Protection Division’s Marine Program.

The three-year-old system consists of a 1,000-gallon AST, transfer pumps, filling/test well ports, fuel gauges and alarms, ~100’ double-wall containment supply line, and a cabinet-mounted marine dispensing unit. System currently will not pass a pressure test as required for permitting by Bay Area Air Quality Management District (BAAQMD).

System is otherwise in good operating condition.

This project will diagnose, service, repair, or replace any components needed to ensure the system is in full compliant operational condition. Vendor will ensure system is fully compliant with any Federal, State, or Local regulations regarding air quality to pass testing for permitting with BAAQMD. Vendor will provide park with a certificate or other document that facilitates permitting with regulatory agencies.

2.0 Scope

1) Diagnose, service, repair, or replace any components needed to ensure the system is in full compliant operational condition.

2) Ensure system is fully compliant with any Federal, State, or Local regulations regarding air quality to pass testing for permitting with the BAAQMD.

3) Provide Park with a certificate or other document that facilitates permitting with regulatory agencies.

3.0 Objectives

Repair equipment pressure.

Test equipment pressure as required by the BAAQMD.

Provide documentation necessary for permit application.

4.0 Tasks

Refer to the cut sheets beginning on page 5 to complete the following tasks:

A. Diagnose what is preventing the equipment from maintaining pressure.

B. Repair or replace components as needed.

C. Pressure test equipment to ensure system is fully compliant with any Federal, State, or Local regulations regarding air quality to pass testing for permitting with the BAAQMD.

D. Provide documentation necessary for permit application.

5.0 Delivery

Include any relevant product literature, maintenance guides, and schedules.

Payment will only be made for actual services rendered, as verified by the Government.

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP) at https://www.ipp.gov/.

6.0 Government-Furnished Property

No government-furnished property is to be provided to the contractor.

7.0 Site-Specific Safety and Health Plan

Prior to work commencing on site, a site-specific safety and health plan shall be prepared covering on-site work to be performed by the contractor and all subcontractors. The prime contractor shall be responsible for development, implementation, and oversight of the site-specific plan. The level of detail provided in the site-specific safety and health plan shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. The site-specific safety and health plan shall address, in as much detail as possible, anticipated tasks, their related hazards, and anticipated control measures.

Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations, including adherence to any local government health orders in effect to reduce the rate of transmission of Novel Coronavirus Disease 2019 (“COVID-19”).

8.0 Place of Performance

The place of performance is located within Point Reyes National Seashore at:

1 Sacramento Landing Road Inverness, CA 94937.

The system is located on the dock at Sacramento Landing at Tomales Bay.

The GPS coordinates are: 38° 08'57'N 122° 54'19'W

Work shall coincide with Park business hours, between 7:00 am to 4:00 pm.

The site point of contact is Jeff Jewhurst, Roads Supervisor- (415) 464-5158, jeffrey_jewhurst@nps.gov.

9.0 Period of Performance

The period of performance is estimated to be between September 15, 2021 to December 15, 2021, but will be determined at time of award.

POINT REYES NATIONAL SEASHORE SACRAMENTO LANDING

AST and FUELING SYSTEM SITE MAP

Point Reyes National Seashore Headquarters

1 Bear Valley Rd Point Reyes Station, CA 94956

10.0 Site Maps

Sacramento Landing AST Fueling System

1 Sacramento Landing Road Inverness, CA 94937

Travel time between park headquarters and site is approx. 20 minutes.

Sacramento Landing AST Fueling System Site

1 Sacramento Landing Road Inverness, CA 94937

HOOVER VAULT™

FIRE RATED DOUBLE-WALL TANKS

Containment Solutions, Inc. (CSI) provides safe, aff ordable solutions for the storage of fl ammable and combustible liquids.

If you are concerned about the eff ects fuel storage has on your bottom line, look at the advantages of aboveground fi re-protected storage tanks.

Our steel Hoover Vault™ tanks meet the requirements of all national fi re codes for fi re-rated aboveground storage tanks and are labeled according to Underwriter’s Laboratories Standard 2085 “Insulated, Protected Secondary Containment”.

Vault tanks utilize patented designs with lightweight fi reproofi ng materials, applied in the interstitial space of UL 142 double-wall tanks. These materials ensure that the inner tank is protected from the eff ects of fi re. This design allows both the inner and the outer tanks to be pressure tested at the factory and in the fi eld.

In addition, the fi reproofi ng materials allow liquid to migrate through to the monitoring tube, so leaks from the inner tank are detected. Rectangular vault tanks are space-saving in design.

ADVANTAGES:

• UL 2085 listed for insulated, protected secondary containment

– Two-hour fi re rating using lightweight concrete

– True 360º “pressure testable” secondary containment

– Vehicle impact protection

– Ballistic Protection

– Built-in leak detection tube

• Meets requirements of all National Fire

Codes

– UFC Articles 52 and 79, Appendix II and Standard A-ll-F-l

– NFPA Standards 30 and 30A

– BOCA

– SBCCI

• CARB Certifi ed for Stage I and II Vapor

Recovery

• Underwriter’s Laboratories of Canada

(ULC) Listed

• 30-Year warranty

• Factory installed equipment packages:

– Motor fuel dispensing, emergency generator/fuel oil, used oil collection (others available upon request)

• Standard Tank Capacities 250 to 20,000 gallons (larger sizes up to 30,000 gallons are available)

A

11.0 AST and PMC Fuel System Cut Sheets

Comp1 Highlight

5150 Jeff erson Chemical Road • Conroe, TX 77301 • Phone: (936) 756-7731 • www.containmentsolutions.com Copyright © • Containment Solutions, Inc. • All Rights Reserved • January 2014 • Pub. No. TNK 1504F

STANDARD TANK SIZES

CAPACITY

(GALLONS) LENGTH WIDTH HEIGHT SHIPPING

WEIGHT

250 4’9” 3’7” 3’9” 3,400 LBS.

500 6’8” 4’7” 3’9” 5,400 LBS.

1,000 7’9” 5’7” 4’9” 8,500 LBS.

1,500 10’7” 5’11” 4’9” 10,250 LBS.

2,000 11’10” 6’11” 4’9” 12,500 LBS.

2,500 9’5” 6’11” 7’1” 13,100 LBS.

3,000 9’8” 7’11” 7’1” 15,800 LBS.

4,000 12’8” 7’11” 7’1” 19,000 LBS.

5,000 15’8” 7’11” 7’1” 23,700 LBS.

6,000 18’8” 7’11” 7’1” 27,000 LBS.

8,000 24’8” 7’11” 7’1” 33,450 LBS.

10,000 30’8” 7’11” 7’1” 42,600 LBS.

12,000 36’8” 7’11” 7’1” 48,750 LBS.

15,000 45’8” 7’11” 7’1” 60,400 LBS.

20,000 60’8” 7’11” 7’1” 76,900 LBS.

VAULT TANK OPTIONS

• UL 142 listed double-wall inner tank, providing triple containment

• Larger tank capacities up to 30,000 gallons

• 3,000 PSI concrete

• Stainless steel inner tanks

• Dual compartments for multi-purpose use available in all capacities

• Lifting lugs and pump mounting brackets

• Fibervault® exterior coatings

• Internal coatings compatible with aviation fuels and other chemicals

Ground Level Spill Box

Steps and Handrail Assembly

The Fuelhouse marine dispensers are designed and built to solve the unique challenges of the saltwater and freshwater marine environment while providing a clean and compact appearance. The attractive design provides the sophistication you want and the simplicity your customers appreciate. The high speed fueling capability of the Fuelhouse series saves time, and therefore, money by minimizing the time vessels occupy the fueling dock. The Fuelhouse marine dispenser is purpose built for the marine fueling environment and provides years of reliable operation.

The Fuelhouse is a listed dispenser that incorporates an internal hose reel capable of managing and protecting the long lengths of hose re-quired in many marine facili-ties. Valuable fuel dock space is saved by eliminating the need for an external reel.

The compact design mini-mizes both its footprint and height to reduce its presence on the fueling dock. With a height under 4 feet, the Fu-elhouse dispenser also im-proves safety/awareness and marina appearance by limit-ing visual obstructions.

Appearance matters. By using only high quality stainless steel, the Fuel-house marine dispenser will retain its attractive finish for many years. The stainless steel chassis is fully welded to maintain rigidity and durability throughout the life of the dispenser. A black powder-coat finish is applied to the chassis for added protection. Corrosion resistance is not limited to the exterior.

From the aluminum meter and brass valve to the fully conformal coated electronics, only components suitable for long term use in a marine environment are used for the internal hydraulic and electrical systems.

The Fuelhouse has the flexibility to operate in either a standalone or remote control application. The dispenser is compatible with most con-sole/card systems using either the standard hardwire or optional 2-wire interface. The 2-wire interface allows communication with newer con-trol devices using a RS-485 connection, enabling features such as re-mote price setting and totals retrieval.

35 & 60 GPM configurations

Liquid Controls PD Meter

1” or 1½” internal reel op-tions

Electric or spring rewind

Above or below grade supply inlet

Internal filtration

Resale accurate

Optional communications in-terface

Stainless steel enclosure

Commercial or retail elec-tronic display

Powder coated welded stainless steel chassis

Brushed finish stainless steel panels

Fuelhouse Marine Dispenser www.pmc-ga.com

Fuel Dispensing and Metering Solutions

PUMP MEASURE CONTROL

MODELS

FH-510-MA-1M – Fuelhouse dispenser with 1” stainless reel, spring rewind.

FH-510-MA-2M – Fuelhouse dispenser with 1” stainless reel, power rewind.

FH-515-MA-3M – Fuelhouse dispenser with 1-1/2” stainless reel, spring rewind.

FH-515-MA-4M – Fuelhouse dispenser with 1-1/2” stainless reel, power rewind.

PERFORMANCE

FH-510 series – 35 GPM FH-515 series – 60 GPM

· Actual delivery rates will vary, depending upon the design of the fuel system, length of hose, type of nozzle, etc.

CABINET

Chassis: Powder coated 304 stainless steel.

Panels: Brushed finish 316 stainless steel.

DISPLAYS

Six digit backlight LCD displays with UV blocking acrylic windows.

Capacities Retail Commercial

Total Sale 9999.99 9999.99 Total Volume 9999.99 N/A Unit Price 0.001– 9.999 N/A

Seven digit electromechanical non-resettable totalizer.

FILTRATION

Hydrosorb single or dual element (Dependant on flow rate) spin-on.

METER

Liquid Controls high flow, rotary motion, positive displacement meter.

SOLENOID

FH-510 Series - 1-1/2” normally closed.

FH-515 Series - 2” normally closed.

SUPPLY CONNECTION

FH-510 Series - 1-1/2” NPT.

FH-515 Series - 2” NPT.

MAXIMUM WORKING PRESSURE

50 PSI.

VOLTAGE AND FREQUENCY

120VAC/60 Hz (240VAC/50 Hz optional)

PULSE OUTPUT (standard) Programmable pulse output provided for connection to console / card access system. Selectable for money or volume pulse. Volume pulse resolution: 10 or 100 pulses per volume.

COMMUNICATIONS INTERFACE (optional) EIA-485 communications interface for connection to console / card access system.

APPROVALS

ETL Listed. — Weights and Measures sealable for retail sale of fuel.

NTEP Certificate number: 04-018

HOSE

None provided. Customer supplied hoses can be installed upon assembly.

FH-510-MA-1M – Maximum capacity – 1” x 85 feet.

FH-510-MA-2M – Maximum capacity – 1” x 130 feet.

FH-515-MA-3M – Maximum capacity – 1-1/2” x 50 feet.

FH-515-MA-4M – Maximum capacity – 1-1/2” x 85 feet.

NOZZLE COMPATABILITY

11A Style, 7H Style, and 1290 Style through 1-1/2”. Contact factory for other types.

SPECIFICATIONS

Fuelhouse Marine Dispenser

draft Att 02 140P8421Q0150 SOW
SITE MAP
AST CUT SHEET

File details come from the government source that posted it. Updated .