Atch 7 - Contractors Project Experience.pdf
PDF 119 KB Posted
- Solicitation number
- W91238-20-R-0015
About this file
This document contains a contractor's project experience template and details of a federal contract solicitation. The template requests information on previous projects including contractor name, project name and location, owner details, description and scope, explanation of relevance, total budget general contractor value, schedule details from start to completion dates, original and final costs, percentage subcontracted, and safety metrics.
The solicitation is for a 12,000 square foot ground level and earth covered reinforced concrete tactical missile storage facility at Hill Air Force Base in Utah. This project will provide storage, utilities, pavements and site improvements for easy loading and unloading of missiles. It utilizes a standardized design adapted for the project requirements. The solicitation number is W91238-20-R-0015 and was issued by the Department of the Army Corps of Engineers Engineering District Sacramento. The response due date and award date are not provided.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR’S PROJECT EXPERIENCE
<<Picture>>
Contractor’s Name (Who performed the work?):
Project Name:
Project Location:
City, State
Project Owner: Point of contact information (owner name, POC name, address, and phone minimum) If Government Contract, additionally provide the contract number and contracting office)
Detailed Description: General scope and relevance. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.
Detailed Explanation of Relevancy:
Success/Challenges with schedule management, quality management, subcontractor management and site safety:
BGSF: XXX,XXX DART Rate:
Schedule:
Start Date:
MM-DD-YYYY
Original Completion:
MM-DD-YYYY
Final Contract Completion:
MM-DD-YYYY
Beneficial Occupancy Date:
MM-DD-YYYY
Cost Original Project Cost:
Final Project Cost:
Cost Difference
% Subcontracted:
File details come from the government source that posted it. Updated .