This document outlines supplemental requirements for a federal construction contract. The contract requires construction of a 12,000 square foot reinforced concrete tactical missile storage facility at Hill Air Force Base in Utah within 720 calendar days. The facility will provide earth-covered storage for missiles and include supporting utilities, pavements, and site improvements. Liquidated damages for delays are $2,855 per day. Adverse weather days are provided for January through December, ranging from 1 to 22 days depending on the month. The contract will utilize the Davis-Bacon wage determination for Utah and incorporate standards for lightning protection, fire detection and suppression, and intrusion detection.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2
SUPPLEMENTAL CONTRACT REQUIREMENTS
1. Performance Period: Refer to contract section 00700, FAR 52.211-10. The performance period for the work stated above shall be 720 calendar days.
2. Liquidated Damages: Refer to contract section 00700, FAR 52.211-12, Liquidated Damages-Construction. Liquidated damages for this work are $2,855.00 for each day of delay.
3. Authorities: “Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.”
4. Wage Determination: General Decision No. UT20200083, or its most current modification at the time of award is hereby applicable to work performed under this task order. The most current decision or its modification can be found at https://beta.sam.gov/wage-determination/UT20200083/0?index=wd&is_active=true&date_filter_index=0&date_rad_selecti on=date&wdType=dbra&state=UT&county=17774&page=1
6. Time Extensions For Unusually Severe Weather: Refer to FAR 52.249.10, Default (Fixed- Priced Construction). All weather delay will need to be submitted and approved by the Contracting Officer Representative.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK-HILL AFB
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(22) (19) (15) (07) (04) (03) (01) (02) (02) (05) (15) (22) https://beta.sam.gov/wage-determination/UT20200083/0?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&state=UT&county=17774&page=1 https://beta.sam.gov/wage-determination/UT20200083/0?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&state=UT&county=17774&page=1 https://beta.sam.gov/wage-determination/UT20200083/0?index=wd&is_active=true&date_filter_index=0&date_rad_selection=date&wdType=dbra&state=UT&county=17774&page=1
SUPPLEMENTAL CONTRACT REQUIREMENTS