This submittal list outlines the required documentation for a federal contract to replace a water heating system. The solicitation seeks to remove existing HVAC boilers, hydronic pumps, and specialties at a Department of the Interior Fish and Wildlife Service facility. New hydronic pumps, specialties, and air handler control valves will be installed along with HVAC controls upgrades and emergency boiler connections. Bidders must provide certifications, plans, shop drawings, manuals, schedules of values, photographs, waste management plans, O&M documentation, sequences of operations, and other submittals as indicated and in accordance with specifications covering general duty valves, hangers and supports, identification, testing, insulation, commissioning, piping, pumps, water treatment, and boilers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0121R0031_Amd_0002.pdf | ||
| Amend_0001_Atch_1_Example_Comissioning_0001.pdf | ||
| Sol_140F0121R0031_Amd_0001.pdf | ||
| Atch 4 GPNC Water Heating System DBA Det Wage Rate.pdf | ||
| Sol_140F0121R0031.pdf | ||
| Atch 5 GPNC Water Heating System Past Perf Quest.doc | DOC document | |
| Atch 1 GPNC Heating Water System Specs.pdf | ||
| Atch 2 GPNC Heating Water System Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C E
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
O th er
012900 1.2.A Schedule of Values to CO/COR - Initial X
012900 1.2.A Schedule of Values to CO/COR - Final X
13100 1.3.A Subcontract List X
013100 1.4.A Construction Schedule X
013100 1.4.A.5 Phase and Rigging Plan X
013200 1.3.A Construction Schedule X
013233 1.2 Digital Photographs X
013300 1.3 Schedule of Submittals X
014000 1.4, 5 Quality Assurance X
017419 1.3 Waste Management Plan X
017419 1.4 Waste Management Records X
017700 1.3 Closeout Submittals X
017823 1.2 O&M Data X
230523 1.3 General Duty Valve Submittals X
230523 1.4 General Duty Valve Closeout Submittals X X
230529 1.5 Hangars and Supports for HVAC Piping Submittals X X X
230548 1.4 Vibration and Seismic Controls For HVAC Submittals X X
230548 1.5 Vibration and Seismic Controls For HVAC Closeout Submittals X X
230553 1.3 Identification for HVAC Piping and Equipment Submittals X X X
230553 1.4 Identification for HVAC Piping and Equipment Closeout Submittals X
230593 1.3 Testing, Adjusting, and Balancing for HVAC Submittals X X
230593 1.4 Testing, Adjusting, and Balancing for HVAC Closeout Submittals X X
230700 1.3 HVAC Insulation Submittals X
230800 1.4 Commissioning of HVAC Submittals X
230800 1.5 Commissioning of HVAC Closeout Submittals X
230800 1.9 Commissioning of HVAC Scheduling X
230923 1.4 Direct - Digital Control System for HVAC Submittals X X
230923 1.5 Direct - Digital Control System for HVAC Closeout Submittals X X
230993 1.2 Sequence of Operations for HVAC Controls Submittals X
230993 1.3 Sequence of Operations for HVAC Controls Closeout Submittals X
231123 1.4 Facility Natural-Gas Piping Submittals X X
231123 1.5 Facility Natural-Gas Piping Closeout Submittals X X
231123 1.13 Facility Natural-Gas Piping Extra Materials X
232113 1.4 Hydronic Piping Submittals X X
232113 1.4 Hydronic Piping Closeout Submittals X X
232116 1.4 Hydronic Piping Specialties Submittals X X
232116 1.5 Hydronic Piping Specialties Closeout Submittals X X
232116 1.12 Hydronic Piping Specialties Closeout Maintenance Materials X
SUBMITTAL LIST HEATING WATER SYSTEM REPLACEMENT
SUBMITTAL REQUIREMENTS (indicate with an "X")
Spec. Sec. Par. No. Description
INFORMATIONAL ACTION
C E
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
O th er
SUBMITTAL LIST HEATING WATER SYSTEM REPLACEMENT
SUBMITTAL REQUIREMENTS (indicate with an "X")
Spec. Sec. Par. No. Description
INFORMATIONAL ACTION
232123 1.4 Hydronic Pumps Submittals X
232123 1.5 Hydronic Pumps Closeout Submittals X
232500 1.4 HVAC Water Treatment Submittals X X X
232500 1.4 HVAC Water Treatment Closeout Submittals X X
235233.16 1.4 Steel Water-Tube Boilers Submittals X X X
235233.16 1.5 Steel Water-Tube Boilers Closeout Submittals X X
260505 1.8 Selective Demolition for Electrical Coordination
260519 1.5 Low-Voltage Electrical Power Conductors and Cables Submittals X X
260519 1.6 Low-Voltage Electrical Power Conductors and Cables Closeout Submittals X X
260526 1.6 Grounding and Bonding for Electrical Systems Submittals X
260529 1.6 Hangers and Supports for Electrical Systems Submittals X
260533 1.5 Raceways and Boxes for Electrical Systems Submittals X
260553 1.2 Identification for Electrical Systems Submittals X
262913 1.3 Enclosed Controllers Submittals X