This amendment to a federal solicitation provides additional details for a project to replace the water heating system at the Great Plains Nature Center in Wichita, Kansas. The solicitation seeks firms to remove the existing HVAC boilers, pumps and valves and install new hydronic equipment, controls upgrades, and emergency boiler connections. Questions from interested contractors are answered regarding roof details, vibration testing requirements, and acceptable piping materials. The response due date is extended to June 18, 2021 and information is provided on six firms that have expressed interest. The contract type is changed to fixed price with economic price adjustment for material and labor costs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0121R0031_Amd_0002.pdf | ||
| Amend_0001_Atch_1_Example_Comissioning_0001.pdf | ||
| Atch 3 GPNC Water Heating System Submittal List.pdf | ||
| Atch 5 GPNC Water Heating System Past Perf Quest.doc | DOC document | |
| Atch 1 GPNC Heating Water System Specs.pdf | ||
| Atch 2 GPNC Heating Water System Drawings.pdf | ||
| Atch 4 GPNC Water Heating System DBA Det Wage Rate.pdf | ||
| Sol_140F0121R0031.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0121R0031 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F06
Lakewood CO 80228-1807
134 UNION BOULEVARD
LAKE PLAZA NORTH
FWS, DIVISION OF CONTRACTING AND GE
F01
PORTLAND OR 97232-4181
911 NE 11TH AVENUE
EASTSIDE FEDERAL COMPLEX
FWS, DIVISION OF CONTRACTING AND GE
21-01806/09/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/13/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Legacy Doc #: FWS
Period of Performance: 07/05/2021 to 01/04/2022
Change Item 00010 to read as follows(amount shown is the obligated amount):
00010 Replace Water Heating System: provide all material, equipment, labor and supervision to remove existing HVAC boilers, hydronic pumps, hydronic specialties and air handler three-way
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Timothy Officer
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140F0121R0031/0001 control valves. Install new hydronic pumps, hydronic specialties, and air handler two-way control valves. The contract documents also show
HVAC controls upgrades for the central plant system and installation of emergency boiler connections.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation Amendment
Document 140F0621R0031-0001
Document Title Replace Water Heating System, Great Plains Nature Center, Wichita Kansas
A. The purpose of this amendment is to respond to contractor questions, change the contract type, provide an interested vendor list and extend the proposal due date.
B. The following contractor questions and Government response are provided for consideration:
1. Contractor Question: Does the facility have a roofer who currently has a warranty on the roof?
What type of roof is existing?
Government Response: Roof is not under warranty. The roof is of the fully adhered single-ply membrane type.
2. Contractor Question: Spec section 230548 Vibration and Seismic- submit signed and sealed shop drawings with design calculations and assumptions indicating maximum sound levels are not exceeded- can the stamped drawings for shop drawings be removed from spec’s?
Government Response: No, the requirement for stamped shop drawings will not be removed.
As per Specification 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT, a delegated design submittal is required for all new piping per Section 1.5.F. If determined it is necessary by the sealed registrant that they are needed, it is acceptable for the contractor to include any isolators as part of the 230529 section.
3. Contractor Question: To go along with section 230548 Vibration and Seismic- they are asking the test and balance contractor to do measurements for noise and deflection- can this be removed from spec’s?
Government Response: Yes, Specification 230548, paragraph 1.4.F. shall be removed.
4. Contractor Question: Will the gov’t have a 3rd party consultant as it’s program manager?
Government Response: Yes, the design engineer on the project will provide service such as in field commissioning of systems and BAS. The testing plan for the recent chiller project has been provided for example reference and is attached to this amendment.
5. Contractor Question: We have noticed that the hydronic specification (232113) only allows copper piping. The current heating hydronic piping for this facility is schedule 40 carbon steel.
We would like for this to be an option in the specifications for hydronic piping (232113) consider the following.
PIPE – 2 ½ or larger schedule 40 carbon steel, with grooved ends or prepped for welding PIPE – 2” or smaller schedule 40 carbon steel, with threaded ends. Copper type “L” FITTINGS – 2 ½ or larger, groove style fittings or manufactured weld fittings FITTINGS – 2” or smaller, threaded malleable fittings, or copper fittings
Are the above items acceptable for the installation of the heating hydronic piping?
Document 140F0621R0031-0001
Document Title Replace Water Heating System, Great Plains Nature Center, Wichita Kansas
Government Response: The proposed alternates options listed in the inquiry, are compliant with the Mechanical Code and are acceptable.
6. Contractor Question: The hydronic spec’s call for all the heating water to be type K or M copper. Can steel pipe with either weld fittings or grooved fittings be used?
Government Response: Please see response to Question 5 above.
7. Contractor Question: In the solicitation, there is a requirement for a temporary fuel fired heater.
Is it possible to save time and cost if we simply put electric space heaters throughout the office vs a major rental and installation of a temporary boiler?
Government Response: Electric space heaters for temporary heat are not acceptable. The Government does require the contractor to provide temporary heat to the facility during construction. Contractor to install emergency boiler connections and isolation valves in hydronic heating water pipe as shown on Sheet M2.0 Keynote #8 and Keynote #10. Once complete, contractor to provide minimum 1,200 MBH temporary gas boiler and pump and connect to existing electrical service, natural gas piping and hydronic heating water piping. Temporary gas boiler system is required to be operational prior to any disconnection of existing heating system, and to be maintained through substantial completion.
8. Contractor Question: We would like to have substitute materials and equipment preapproved?
Government Response: The Government does not preapprove materials and equipment during the solicitation phase of the acquisition. It is the successful contractor’s responsibility to comply with the design specifications and drawings. Any reference to a manufacturers products or equipment are intended to establish a level of quality and are the basis of design, unless otherwise specified.
9. Contractor Question: We are concerned the period of performance does not take in to account the long lead time equipment items.
Government Response: We will work with the successful contractor and issue 2 Notice to Proceed letters. The first will be for material, equipment, review, approval and ordering. This will not count against the overall performance. Once we have delivery dates established for any long lead-time items, we will then work with the contractor to determine the best date to issue the construction NTP.
Document 140F0621R0031-0001
Document Title Replace Water Heating System, Great Plains Nature Center, Wichita Kansas
10. Contractor Question: Can the bid bond be turned in electronically in lieu of sending a hard copy version?
Government Response: A bid bond is required and must be submitted electronically, with the proposal. Mail only the paper bid bond to the Lakewood office address, Contracting, Lake Plaza North, 134 Union Blvd, Lakewood CO 80228.
C. Contract clause 52.216-4 Economic Price Adjustment-Labor and Material, Jan 2017 is hereby added to the solicitation, contract clauses Section I, page 14. The application and use of the clause shall be based on Federal Acquisition Regulation (FAR) 16.203-1 Description, paragraph “(a) A fixed-price contract with economic price adjustment provides for upward and downward revision of the stated contract price upon the occurrence of specified contingencies. Economic price adjustments are of three general types:…(2) Adjustments based on actual costs of labor or material. These price adjustments are based on increases or decreases in specified costs of labor or material that the contractor actually experiences during contract performance.” Specified costs are those costs cited in the bid/proposal schedule, pages 6.
Specified contingencies are those associated with the current market conditions, supply, and manufacturing of construction materials, as impacted by the on-going effects of the Coronavirus pandemic.
Economic Price Adjustment-Labor and Material (Jan 2017)
(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the rate of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this contract. The notice shall include the Contractor’s proposal for an adjustment in the contract unit prices to be negotiated under paragraph (b) of this clause, and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor’s adjustment proposal.
(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. However, the Contracting Officer may postpone the negotiations until an accumulation of increases and decreases in the labor rates (including fringe benefits) and unit prices of material shown in the Schedule results in an adjustment allowable under paragraph (c)(3) of this clause. The Contracting Officer shall modify this contract (1)to include the price adjustment and its effective date and (2)to revise the labor rates (including fringe benefits) or unit prices of material as shown in the Schedule to reflect the increases or decreases resulting from the adjustment.
The Contractor shall continue performance pending agreement on, or determination of, any adjustment and its effective date.
(c) Any price adjustment under this clause is subject to the following limitations:
(1) Any adjustment shall be limited to the effect on unit prices of the increases or decreases in the rates of pay for labor (including fringe benefits) or unit prices for material shown in the Schedule. There shall be no adjustment for-
(i) Supplies or services for which the production cost is not affected by such changes;
Document 140F0621R0031-0001
Document Title Replace Water Heating System, Great Plains Nature Center, Wichita Kansas
(ii) Changes in rates or unit prices other than those shown in the Schedule; or
(iii) Changes in the quantities of labor or material used from those shown in the Schedule for each item.
(2) No upward adjustment shall apply to supplies or services that are required to be delivered or performed before the effective date of the adjustment, unless the Contractor’s failure to deliver or perform according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Default clause.
(3) There shall be no adjustment for any change in rates of pay for labor (including fringe benefits) or unit prices for material which would not result in a net change of at least 3 percent of the then-current total contract price. This limitation shall not apply, however, if, after final delivery of all line items, either party requests an adjustment under paragraph (b) of this clause.
(4) The aggregate of the increases in any contract unit price made under this clause shall not exceed 10 percent of the original unit price. There is no percentage limitation on the amount of decreases that may be made under this clause.
(d) The Contracting Officer may examine the Contractor’s books, records, and other supporting data relevant to the cost of labor (including fringe benefits) and material during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.
(End of clause)
D. Change solicitation provision, page 35 of 46, 52.216-1 to read:
52.216-1 Type of Contract (APR 1984)
The Government contemplates award of a FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT contract resulting from this solicitation.
E. The following vendors have shown interest in the project:
Firm POC Phone
Chase, Carson and White LLC Anton White (480) 707-7759 Comfort Sales Agency, Inc. Shane McKee (618) 656-1655 Floyd Construction Co Tarrance C. Floyd (316) 440-8838 Central Consolidated Bill Lorg 316-945-0797
F. The response due date and time is extended to Friday, 18 Jun 2021, 1900 hours local time. Please provide acknowledgement of this amendment.
G. All other terms and conditions remain unchanged.
Attachments: Example Commissioning/Testing Plan https://www.acquisition.gov/far/part-4#FAR_Subpart_4_7