Atch 2-BidSched_Bldg1705Demo_23 May 22.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Demo Bldg 1705 Federal contract opportunity
- Solicitation number
- FA4626-22-Q-0012
About this file
This document contains a bid schedule and statement of work for the demolition of Building 1705 at an Air Force base. The contractor will provide all labor, supplies, and supervision necessary to demolish the building and restore the site according to the statement of work. The bid schedule includes line items for project mobilization and building demolition/site restoration, but no pricing is provided. The mobilization line item encompasses general contract requirements, administration, overhead, insurance, permits, safety materials, shop drawings, samples, and other incidental work. The demolition/restoration line item covers the actual building demolition, utility abandonment, and site restoration activities. The solicitation is identified as FA4626-22-Q-0012 and is being conducted by the Department of the Air Force Global Strike Command for the demolition of Building 1705 at an unspecified Air Force base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBO_Amended_15 July 22.pdf | ||
| MFR_Amendment 002.pdf | ||
| COMBO_Extended.pdf | ||
| Atch 6_B-1705 ACM_Pb Survey Results.pdf | ||
| QA_6 July 2022.xlsx | XLSX spreadsheet | |
| MFR_Amendment 001.pdf | ||
| QA_24 June 2022.xlsx | XLSX spreadsheet | |
| QA_14 June 2022.xlsx | XLSX spreadsheet | |
| Atch 1_Specs Combined.pdf | ||
| Atch 3-PastPerformance.xlsx | XLSX spreadsheet | |
| Atch 4-InstalPerimAccessControl.pdf | ||
| Atch 5_Drawings_Combined.pdf | ||
| COMBO.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Schedule | |
| Bldg 1705 Demolition |
| CLIN | Item | Quatity | Unit | Unit Price | Total |
| 0001 | Mobilization: All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract costs for “Mobilization”. The cost of all insurance, permits, safety, fees and licenses, shop drawings and samples, general administration and overhead, movements of equipment, tools, and other incidental work shall be merged and included in the contract price for “Mobilization”. | 1 | Job | $0.00 | |
| 0002 | Building/Site Demolition and Restoration: All costs for materials, work, and equipment necessary, including but not limited to, demolition of the building, demolition and abandoning utilities, and site restoration. | 1 | Job | $0.00 | |
| Contract Total | $0.00 |
File details come from the government source that posted it. Updated .