Atch 1_Specs Combined.pdf

PDF 2 MB Posted

Attached to
Demo Bldg 1705 Federal contract opportunity
Solicitation number
FA4626-22-Q-0012
Issued by
Department of the Air Force Global Strike Command

About this file

This solicitation is for demolition services at Building 1705 at Malmstrom Air Force Base in Montana. The contractor shall provide all labor, supervision, supplies, and equipment necessary to demolish the structure and return the plot of land to its previous natural state. Since this requirement is solely for structure removal and site restoration, it will be subject to the Service Contract Labor Standards and not the Davis-Bacon Act. The contractor must remove the building entirely, including the foundation, sidewalks, and other site features. The contractor shall also remove utility services running to the building. Upon completion, the site must be graded and any disturbances addressed according to the specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Demo Bldg 1705, newest first.
File Type Posted
COMBO_Amended_15 July 22.pdf PDF
MFR_Amendment 002.pdf PDF
COMBO_Extended.pdf PDF
MFR_Amendment 001.pdf PDF
Atch 6_B-1705 ACM_Pb Survey Results.pdf PDF
QA_6 July 2022.xlsx XLSX spreadsheet
QA_24 June 2022.xlsx XLSX spreadsheet
QA_14 June 2022.xlsx XLSX spreadsheet
Atch 5_Drawings_Combined.pdf PDF
COMBO.pdf PDF
Atch 2-BidSched_Bldg1705Demo_23 May 22.xlsx XLSX spreadsheet
Atch 3-PastPerformance.xlsx XLSX spreadsheet
Atch 4-InstalPerimAccessControl.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

DIVISION 01 –GENERAL REQUIREMENTS

GENERAL REQUIREMENTS ....................................................................................................SECTION 01 00 00 Attachment 1 – Quality Control Report to Inspector

SECURITY .........................................................................................................................................SECTION 01 00 10

ENVIRONMENTAL ......................................................................................................................SECTION 01 36 00 Attachment 1 – Waste Management Plan Attachment 2 – Recovered Materials Written Determination Form Attachment 3 – Recycled Material Use Report Attachment 4 – Monthly Report of Solid Waste Disposal and Diversion Attachment 5 – Sample Hazardous Material List

DIVISION 02 – EXISTING CONDITIONS

BUILDING DEMOLITION .........................................................................................................SECTION 02 41 16

ABATEMENT OF ASBESTOS-CONTAINING MATERIALS ...........................................SECTION 02 82 13 Asbestos Abatement Figure Asbestos Report (See attachment to 02 83 33)

REMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD........................ SECTION 02 83 33 Lead-Based Pint Abatement Figure Asbestos and LBP Report

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

HIGH TEMPERATURE HOT WATER PIPING SYSTEMS ...............................................SECTION 23 21 15

DIVISION 31 – EARTHWORK

SITE GRADING, EXCAVATION AND EMBANKMENT .................................................SECTION 31 22 00

TRENCH EXCAVATING AND BACKFILL FOR PIPELINES AND

APPURTENANT STRUCTCURES .......................................................................................SECTION 31 23 33

DIVISION 32 – EXTERIOR IMPROVEMENTS

SEEDING ..........................................................................................................................................SECTION 32 92 19

DIVISION 33 – UTILITIES

POLYVINYL CHLORIDE WATER MAIN ..............................................................................SECTION 33 11 00

ATTACHMENT 01 FA4626-XX-X-XXXX

Demo B-1705

Project No. 1053449

GENERAL REQUIREMENTS 01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY OF WORK

A. Project titled: “Demo Building 1705" consists of the demolition and site restoration of Building 1705 at Malmstrom AFB, MT. Existing utility services to the building will be removed towards their source and include a fire hydrant, natural gas, electrical, communications, water, and sanitary sewer. The building will be removed entirely to include its foundation, sidewalks, surfacing, and related site features, after which the site shall be restored to a natural open space state.

1.2 UTILITIES

A. Building 1705 has no utilities. The Contractor shall provide any necessary temporary or portable utilities needed to perform the work..

1.3 SAFETY

A. The Contractor shall comply with all existing Occupational Safety and Health Act (OSHA) standards of safety at all times in the performance of this contract. Hazards to the safe use of the premises due to the Contractor’s work and/or equipment shall be suitably marked at all times. Pedestrian and vehicle traffic ways shall be kept clear and unobstructed.

PART 2 - PRODUCTS

Not applicable.

PART 3 - EXECUTION

3.1 INSPECTION

A. There will be one primary Contracting Officer's Representative assigned to inspect for compliance. An alternate Contracting Officer's Representative will also be assigned and will perform all inspection duties in the absence of the primary Contracting Officer's Representative. The Contracting Officer's Representative will be the spokesman for compliance with the specifications and drawings.

Controversies between the Contracting Officer's Representative and the Contractor will be resolved by the Contracting Officer. If, for some reason, a change in the primary or alternate Contracting Officer's Representative is required, the Contractor will be notified. The Contractor shall coordinate Contractor activities with Construction Management.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 2

3.2 CONTRACTOR VEHICLES AND EQUIPMENT

A. The Contractor shall provide all vehicles and equipment necessary to accomplish the contract work. Power equipment shall be equipped with safety and noise limiting devices. The equipment shall be in a safe and efficient operating condition. The Contractor shall not park vehicles in the project area during non working hours. A designated parking area for vehicles and equipment will be provided. Vehicles will not be allowed on lawns or sidewalks without prior written approval. All equipment will be clearly marked with the Company name.

B. Truckload Limits: The following load limits shall apply to all contractor-operated equipment on this project:

April 1 to June 1 -- 350 #/inch width of tire All Other Times -- 400 #/inch width of tire

3.3 CONTINUED USE OF FACILITIES

Not used.

3.4 MAINTENANCE OF AIR FORCE OPERATIONS

A. It is required and essential that the primary use of the facilities continue uninterrupted throughout the contract period. Work, once commenced, shall be carried to completion with a minimum of interruption to Government operations.

3.5 AS-BUILT FIELD DATA

A. General: The Contractor shall keep at the construction site a complete set of full size prints of the contract drawings, reproduced at Contractor expense. During construction, these prints shall be marked to show all deviations in actual construction from the contract drawings. The color red shall be used to indicate all additions and green to indicate all deletions. The drawings shall show the following information but not be limited thereto:

1. The locations and descriptions of any utility line and other installations of any kind or description known to exist within the construction area. The location includes dimensions to permanent features, and depth.

2. The locations and dimension of any changes within the building or structure, and the accurate location and dimension of all underground utilities and facilities.

3. Correct grade or alignment of roads, structures, and utilities if any changes were made from contract plans.

4. Correct elevations if changes were made in site grading from the contract plans.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 3

5. Changes in details design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including, but not limited to, fabrication, erection, installation, and placing details, pipe size, pipe material, insulation material, dimensions of equipment foundations, etc.

6. The topography and grades of all drainage installed or affected as part of the project construction.

7. All changes or modifications from the original design and from the final inspection.

8. Where contract drawings or specifications allow options, only the option actually used in the construction shall be shown on the as-built drawings.

The option not used shall be deleted.

9. These deviations shall be shown in the same general detail utilized in the contract drawings. Marking of the prints shall be pursued continuously during construction to keep them up-to-date. In addition, the Contractor shall maintain full size mark-up drawings, survey notes, sketches, nameplate data, pricing information, description, and serial numbers of all installed equipment. This information shall be maintained in a current condition at all times until completion of the work. The resulting field-marked prints and data shall be referred to and marked as “As-Built Field Data,” and shall be used for no other purpose. They shall be made available for inspection by the Contracting Officer’s representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by the Contracting Officer’s representative and a responsible representative of the Contractor prior to submission of each pay estimate. If the As-Built Field Data is not accurate and complete, a percentage of the pay request will be withheld from the payment and any future payments until the As-Built Field Data is up to date, complete and accurate. The Contracting Officer will determine the percentage to be retained.

B. Submittal of the As-Built Field Data: The As-Built Field Data shall reflect the exact installation performed and two copies shall be submitted to the Contracting Officer for review and approval a minimum of three calendar days prior to the date of final inspection. If review of the preliminary as-built drawings reveals errors and/or omissions, the drawings will be returned to the Contractor for corrections. The Contractor shall make all corrections and return the drawings to the Contracting Officer within 10 calendar days of receipt. The “Red LINE” drawings shall be reviewed at the final inspection for completeness. Once As-Built Field Data have been reviewed and approved one copy will be returned to the contractor with and electronic copy of contract drawings. The electronic contract drawings will be updated with the field data by the contractor and submitted to the Contracting Officer.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 4

C. Preparation--As-Built Contract Drawing, Non AutoCAD Original Record Tracing:

1. Approved preliminary as-built drawings will be returned to the Contractor along with one set of the contract drawing original record tracings. These drawings are part of the permanent records of this project and the Contractor will be held responsible for their protection and safety until they are returned to the Contracting Officer. Any drawings damaged or lost by the Contractor shall be satisfactorily replaced in like medium, quality and size as the originals at the Contractor’s expense. The drafting work shall be performed by certified Engineering Technicians and/or individuals with a minimum of five years drafting experience. The name and qualifications of these individuals shall be submitted in writing to the Contracting Officer for approval.

2. Drafting of the data onto the original contract drawing shall be done in a quality equal to that of the originals. Linework, lineweights, and lettering, and use of symbols shall be the same as the original line work, line weights, and lettering, and symbols. All revisions shall be noted in revision block with revision symbol in chronological sequence. This symbol shall also be placed on drawing where revision was made. Plastic drafting leads or ink shall be used. Graphite leads shall only be used where used on the original drawings.

If additional drawings are required, they shall be prepared on the same medium and of equal size and quality as the original record tracings.

Sufficient blank sheets for this purpose will be furnished by the government at no cost to the Contractor upon request. When final revisions have been completed, each drawing shall be lettered or stamped with the words “As- Built” in block letters at least 3/8 inch high placed above the title block of space permits, or if not, below the title block between the border and the trim line. The date of completion and the words “REVISED AS-BUILT” shall be placed in the revision block above the latest revision notation.

Markings on the reverse side of the drawings will not be permitted. The submittal shall include the approved “Red Line” drawings and the revised original record drawings as stated above.

D. Preparation--As-Built Contract Drawings, AutoCAD Original Record Tracing:

1. Approved preliminary as-built drawings will be returned to the Contractor along with AutoCAD CD (Release 2014) of the original drawings. All work on the CD will be accomplished by a Certified Engineering Technician and/or individuals with a minimum of five years drafting experience, at least three of which must be using AutoCAD. The name of the individual shall be submitted in writing to the Contracting Officer.

2. Modifications to the CD shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing. On each sheet the words “AS BUILT” in block letters will be added to the discs. The size of the letters will be at least

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 5

3/8 inch high and be placed either above the title block or to the left of the title block. Fill in the revisions block with “REVISED AS-BUILT”, date and initials. The submittal shall include the revised AutoCAD CD, the approved “Red Line” drawings and a full size plot of the drawings from the revised

CD.

E. Preparation--As-Built Contract Drawing, Both AutoCAD and Non AutoCAD

Original Record Drawings:

1. Approved preliminary as-built drawings will be returned to the Contractor.

These drawings are part of the permanent records of this project and the Contractor will be held responsible for their protection and safety until they are returned to the Contracting Officer. Any drawings damaged or lost by the Contractor shall be satisfactorily replaced in like medium, quality and size as the originals at the Contractor’s expense. The drafting work shall be done by a certified Engineering Technician and/or other individual drafting experienced and on AutoCAD.

2. For Non AutoCAD drawings, drafting onto the contract drawing original mylar record tracings shall be done in a quality equal to that of the originals.

Linework, lineweights, lettering and use of symbols shall be the same as the original. All revisions shall be noted in the revision block with revision symbol in chronological sequence. This symbol shall also be placed on drawing where revision was made. Plastic drafting leads or ink shall be used.

Graphite leads shall only be used where used on the original drawings.

Additional drawings, if required shall be the same format, size and quality as provided on the AutoCAD CD. The additional drawings will be added to the CD provided.

3. For AutoCAD drawings, modifications to the CD shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing.

4. When the final revisions have been completed, each drawing shall be lettered or stamped, for original record tracings and lettering added to the CD with the words “AS-BUILT” in block letters at least 3/8 inch high. The lettering shall be place either above the title block or to the left of the title block. The words “REVISED AS-BUILT” shall be placed in the revision block along with the date of completion and the initials of the reviser. The submittal shall include the approved “Red line” drawings, the revised original record tracings, the revised AutoCAD CD and a print of the drawings from the revised CD.

F. The final as-built submittal shall be completed and returned together with the approved preliminary as-built drawings to the Contracting Officer within 30 calendar days of the final inspection. The Contracting Officer will review all final as-built record drawings for accuracy and conformance to the drafting standards and other

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 6

requirements contained herein. The submittal shall be returned to the Contractor if corrections are necessary. The Contractor shall make all corrections and shall return the submittal to the Contracting Officer within seven calendar days of receipt.

1. All costs incurred by the Contractor in the preparation and furnishing of as-builts shall be included in the contract price and no separate payment will be made for this work. Approval and acceptance of the final as-built record drawings shall be accomplished before final payment is made to the Contractor.

2. In addition to the above requirements, one set of marked-up as-built blueprints shall be furnished to the Contracting Officer at the time of system acceptance testing. These as-built blueline prints shall be in addition to the requirements stated for the submission of the Operation and Maintenance Manuals.

3.6 CONCEALED WORK

A. All items of work to be concealed shall be Government inspected prior to concealment.

3.7 OPERATING AND MAINTENANCE INSTRUCTIONS

A. One complete set of instructions, in post-form binders, containing the manufacturer’s operating and maintenance instructions for all equipment shall be furnished to the Contracting Officer. In addition, (2) CD-ROM discs containing the same information as the hard copy shall be provided. Where information or instructions are included for more than one model, the Contractor shall clearly mark the model actually installed on the job. The manuals shall be sectionalized using dividers with labeled tabs identifying the product/item behind the dividers. One complete set shall be furnished at the time test procedures are submitted, and the remaining sets shall be furnished before the contract is completed. Furnishing operating and maintenance instructions does not relieve the Contractor of the responsibility of furnishing framed instructions and schematics where specified.

Each binder shall be indelibly marked on the exterior front and edge with the project name, project number, contract number, name of contractor and the date.

3.8 CONTRACTOR FURNISHED EQUIPMENT DATA

A. Ten days prior to final inspection and acceptance of work, the Contractor shall submit the following data:

1. Equipment List: An itemized equipment list showing unit retail value and nameplate data including serial number, model number, size, manufacturer, etc., for all Contractor furnished electrical and mechanical equipment installed under this contract. A sample form showing minimum data required is provided at the end of this section.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 7

2. Guarantees: Provide a list of all equipment items which are specified to be guaranteed, accomplished by a copy of each specified guarantee therefore.

For each specific guaranteed item on the list shall include the name, address, and telephone numbers of the subcontractor who installed the item, the supplier, or distributor and the manufacturer. The completion data of the guarantee period shall correspond to the applicable specification requirements for each guarantee item.

3.9 RESERVED

3.10 SHOP DRAWINGS

A. Shop drawings will include specially prepared technical data for this project and will consist of drawings, diagrams, performance curves, schedules, calculations, measurements, and will expand the general application to this specific project. Shop drawings show complete and accurate descriptions of specific equipment or systems to be installed. This will include detailed drawings showing routings, material types, installation and anchoring methods, component sizes, mounting methods, spacing, interface with existing systems, wiring and electrical systems, and all other details associated with the installation.

3.11 START OF WORK NOTIFICATION

A. The Contractor shall notify the Construction Management (CM) Office and the Contracting Officer 21 working days in advance of the start of all work. This shall include, but is not limited to, notifying CM when the initial work shall begin;

notifying CM when work shall resume after a work stoppage of more than five work days; notifying CM when work shall begin following the end of all specified exclusion periods. The Contractor shall be aware that the Notice to Proceed is not sufficient notification to the CM when initial work will begin.

3.12 NOTICE OF PRE-FINAL AND FINAL INSPECTIONS

A. The Contractor shall, after notifying the Construction Contracting Officer's Representative 14 days prior, schedule a date with the Contracting Officer for a pre-final inspection. After all discrepancies found during the pre-final inspections have been corrected, the Contractor shall schedule a final inspection with the Contracting Officer 14 days prior to his projected completion of the project. The red line “As- Built” drawings shall be provided by the Contractor at the final inspection.

3.13 CONSTRUCTION NEAR UTILITY SYSTEMS

A. All contractors shall be responsible for processing their own Work Clearance Request (AF Form 103) and coordinating with Government Contracting Officer's Representatives as required. The contractor is responsible for obtaining all

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 8

coordination signatures for the permit. The approved permit shall be valid for a period not to exceed 90 calendar days. To the maximum extent possible, eliminate permanent markings on pavement and curbs. The contractor shall be responsible for maintaining all utility markings. Location marks shall be removed after 14 calendar days if not used. All markings shall be accomplished with water-based chalk (Aervoe Pacific Inc. 1-800-227-0196 or equal). No paints will be used.

Detailed permit procedures and guidelines shall be provided to the contractor during the Pre-performance Conference. Digging within three feet of buried communications cables, environmental monitoring wells, electrical cables, irrigation systems, and gas lines shall be performed by hand digging until the utility is exposed.

The Project Contracting Officer's Representative shall be notified three days prior to digging within a three-foot area near this utility. A representative from the Communications Office must be present during excavation of Communications Cables. The cable routes must be marked prior to excavation in the area. The Contractor shall be held responsible for any damage to a marked or identified utility by excavation procedures. Once the utility is exposed, mechanical excavation may be used if there is no chance of damage occurring to the cable or piping system. The contractor is responsible for marking all excavations he will do, five (5) work days prior to needing existing utilities marked by the government.

B. Reburial of Exposed Utilities: When existing utility lines are reburied, a tape, detectable by pipe detector systems, shall be installed above the uncovered length of the utility at a depth of 12 inches below grade. Tape shall be a minimum five mil plastic tape with metallic tracer, minimum six inches wide, lettering on tape continuously marked “BURIED UTILITY”, and brightly colored. If tape marked “BURIED UTILITY” is not readily available, special order tape with the correct lettering shall be acquired by the contractor.

C. Access to Communications Manhole or Handhole: No communications manhole or handhole shall be entered without first obtaining a fiber optic cable briefing.

Coordinate through Construction Management with the Base Communications

D. All repairs due to cable cuts on communications cables shall be the responsibility of the Contractor. Repair actions must be accomplished by the current communications contractor and paid for and coordinated under this contract at no additional cost to the Government if the contractor is deemed to be at fault by the Contracting Officer. Work to restore lost service must begin within one hour after the cut and must continue unceasingly until the job is completed, tested, and accepted. Work will be inspected by Communications Squadron and personnel.

E. All utilities or anticipated underground obstacle crossings must be located by manual and other non-destructive excavation (hydro-vac) prior to mechanical excavation.

All non-destructive excavation shall be considered incidental to project completion.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 9

3.14 UTILITY OUTAGES

A. All utilities programmed to be interrupted during construction shall be scheduled at least 14 working days in advance of the outage and at a time convenient for the government. The “Utility Outage Notice” will be completed by the Contractor and submitted to Construction Management for approval. No interruptions shall be made until the outage notice is approved and returned to the Contractor.

Notification forms that are to be filled out by the contractor, will be provided at the pre-construction conference. Utilities will include all overhead and underground utilities and road closures or partial closures.

3.15 SUBMITTALS

A. Contractor shall submit three copies of all submittals, to be recorded on AF Form

66. Submittal items, including samples, shall be marked with a number corresponding to the item number on the AF Form 66, and the page and paragraph number of the specification requiring the submittal. Contractor shall hi-lite specifics when submitting catalogs, etc. It is the responsibility of the contractor to complete column 13, “Required Submission Date”, in the submittal form and insert dates for each submittal item not already designated by the Government as having a mandatory due date. The contractor shall schedule and submit all required items for major systems (such as HVAC, etc) at the same time to enhance review of interrelated components. It is the Contractor’s responsibility to ensure the dates provided on the form do not create any delays in construction. Provide the completed form to the Contracting Officer at or prior to the Pre-Construction meeting. The completed form will then be used by the Government for tracking submittal progress. If the contractor is proposing to use an exact brand name or product identified, a submittal for that item is not required. In lieu of a submittal, the contractor shall submit a letter to the Contracting Officer outlining each item that will be provided exactly as specified. These items will also be annotated as such on the AF Form 66. Even though a specified product is provided, in some circumstances a submittal may still be required for color selection, etc. If a recycle initiative product is specified and the contractor wishes to provide a substitute product, the Contractor shall request the substitution as indicated in paragraph 3.28 of this Section.

3.16 CONTRACTOR STORAGE AREA AND WORK SITE

A. Prior to notice to proceed, Contractor will be provided a storage area on the base within three miles of the project site or as designated on the site plan. All contractor equipment and materials shall be stored in this area except for materials that will be used on the job within a 48 hour period. Contractor is responsible for the security of assigned storage area (3,000 S.F., more or less). Temporary storage buildings (excluding tractor trailers) sited in the storage area shall conform to the base color scheme (Antique Linen, Fed. No. 23578). Architectural and structural features of all temporary facilities (including tractor trailers) shall be maintained in good repair as required by the Contracting Officer. Storage areas shall be enclosed by 6’ chain link

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 10

fence with access gates. Spare keys to any locked gates shall be provided to the base fire department dispatch office. Storage areas and job sites shall be clean, orderly, and free of debris, demolished/excess materials, etc. Job sites will be cleaned daily and refuse and debris removed from the site. Fences will be maintained. Grass and weeds shall be cut weekly at the storage area and work site. All landscaping, trees and shrubs will be protected, irrigated and maintained. If irrigation system to an existing area is interrupted due to construction activities, the Contractor shall provide a means of temporary irrigation until the permanent system is operational. If at any time during the life of the contract, the Contracting Officer determines that base standards are not being met, he/she may direct the Contractor to perform such actions as necessary to bring the area and/or facilities up to base standards at no additional cost to the Government. If the contractor fails to bring the area and/or facilities up to standards, the Contracting Officer may direct the Contractor to remove themselves and/or the facility/storage unit or materials from the base at no cost to the Government.

3.17 REPAIR OF ROAD CUTS

A. Asphaltic surface shall be completely in-place within 48 hours after placement of base gravel. Between placement of base gravel and pavement, road shall be kept in drivable and passable condition.

3.18 QUALITY CONTROL

A. General. THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROL

WHICH IS CONSIDERED BY THE GOVERNMENT TO BE A MAJOR

INSPECTABLE ITEM OF THIS CONTRACT. In addition to CONTRACT CLAUSE, INSPECTION OF CONSTRUCTION, the Contractor shall comply with the Quality Control Provisions as specified herein. The Contractor shall perform all Quality Control inspection and/or testing required by this contract unless specifically designated to be performed by the Government. The Quality Control system must consist of personnel, plans, procedures, and organization necessary to provide materials, equipment, workmanship, fabrication, construction, and operations which comply with contract requirements. The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence. If the Contractor fails to submit an acceptable Quality Control Plan within the time herein prescribed, the Contracting Officer will refuse to allow construction to start.

B. Quality Control Plan: General: Prior to the start of construction, the Contractor’s

Quality Control Plan must be acceptable to the Government. Construction will be permitted to begin only after acceptance of the contractor’s Quality Control Plan.

The Contractor’s Quality Plan shall identify the personnel, procedures, instructions, records, forms, and as a minimum, shall include the following:

1. A description of the Quality Control management organization including an organizational chart.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 11

2. The number, classifications, qualifications, duties, responsibilities, and authorities of personnel: A copy of a letter, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the Quality Control manager shall be furnished. The Quality Control manager must have a minimum of five years of documented experience in the primary areas of construction included in this contract. Include qualifications in the submitted plan for Government approval.

This contract does not require a full time Quality Control Manager. The individual assigned may have other duties within the contractor’s organization but must commit, as a minimum, an average of two hours per day towards fulfilling the QC requirements of this section. Hours dedicated to this function will be annotated on the submitted QC records.

a) The Contractor’s Quality Control activities to be performed, include those of subcontractors, off-site fabricators, and suppliers. A job specific detailed work item list for inspection purposes will be developed by the contractor. The list will be broken into sections identical to the contract specifications and will contain all inspection actions necessary to ensure full compliance with the contract. A sample from a simplified and generic project is included as Attachment 1 to indicate the level of detail expected in this checklist.

b) Quality Control testing procedures including corrective actions to be taken where non-compliance is noted by the Quality Control Manager.

c) Documentation format for Contractor’s Quality Control activities and testing. The attached form is to be used for documenting daily inspections, corrective actions, etc.

d) Procedures for ensuring As-Builts are accurate and updated daily.

e) Safety program that ensures complete compliance with OSHA and the U.S. Army Corps of Engineers manual EM 385-1-1, Safety Health Requirements Manual. Any non-compliance issues are the responsibility of the Contractor and not the Government.

f) Methods to ensure scheduled appointments are met and documentation to verify arrival and departure times at the work site.

g) A listing of all required electrical testing and operational tests.

C. Acceptance: The Quality Control Plan will be reviewed and approved, if acceptable, by the Contracting Officer. The Contractor shall make such changes and additions necessary for clarity and completeness as requested by the Contracting Officer.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 12

Acceptance is conditional and the Government reserves the right to require the Contractor to make changes in the Quality Control Plan, personnel, and operations to correct deficiencies found by the Government during performance of work. No change shall be implemented prior to acceptance in writing by the Contracting Officer. Non-compliance with the Quality Control Plan will result in one or more of the following actions at the Government’s discretion:

1. Directed removal and replacement of the QC Manager.

2. Cure notices and other applicable contracting actions up to and including possible contract termination for default.

3. Other contractual actions deemed appropriate by the Contracting Officer.

D. Quality Control Records: The Quality Control Records shall contain a record of daily inspections for all work accomplished. Specific items of work checked each day will be annotated. All work-in-place must be certified as complying with the contract plans and specifications. Non-compliance items must be clearly noted.

Corrective actions must be outlined and detailed for non-compliance items. The Contractor shall maintain daily records, which will be on-the-job site and available for review by the Contracting Officer or his technical representative. Daily reports will be signed by the designated Quality Control Manager and will indicate hours spent on Quality Control that day. A copy of the QC daily reports shall be given to Construction Management by noon on the following day.

E. Submittals: The contractor will submit three copies of the proposed Quality Control

Plan for acceptance not more than 10 days after Award. No work will start until acceptance is made by the Contracting Officer. No exceptions will be provided to this requirement.

3.19 CONTRACT PROGRESS SCHEDULE AND REPORT

A. Contractor shall complete Project Schedule Form 3064 the 1st of each month, starting after the Notice to Proceed until Final Acceptance. The project schedule is required to be delivered to the Contracting Officer for review and approval prior to the start of work. Work may not commence until the project schedule is approved unless the Contracting Officer waives the requirement.

B. Contractor shall complete Progress Report Form 3065 and submit to the

Contracting Officer every two weeks, starting at the Notice to Proceed until Final Acceptance. The Progress Report shall mirror the intervals approved on the Project Schedule.

3.20 1354 CHECKLIST

A. Contractor shall complete the Property Inventory checklist and submit it to the Contracting Officer 10 days prior to final inspection. Prior to completing the Form

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 13

1354 checklist, the Contractor shall request assistance from the Resource Management Flight. The checklist will be delivered to the Contractor at the Preconstruction conference.

3.21 WORK SCHEDULE

A. Working hours for the Contractor will normally be between the hours of 7:45 a.m.

and 4:15 p.m. excluding Saturdays, Sundays, and Federal Holidays. With prior government approval, the Contractor may work 4-10 hour days per week, Monday through Thursday or Tuesday through Friday. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must notify the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines that they are reasonably available. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.

B. Weekly construction meetings may be held throughout the duration of the project at a time and place specified in the Pre-construction Conference.

3.22 NUCLEAR DENSOMETERS

A. The use of nuclear densometers or other devices containing radioactive elements on Malmstrom AFB is controlled for safety and management purposes. The contractor must have proof of a Nuclear Regulatory Committee (NRC) permit for its use. The Contractor must also keep all radioactive equipment locked up when not in use and remove it from the base at completion of the work day. All projects requiring use of radioactive devices will be required to submit, for approval 30 days prior to use, the following information for review by the Base Radiation Safety Officer in (341 MDOS/SGOAB, Fax 406 731-2469):

1. Brief description of proposed activity.

2. Copy of current NRC or Agreement State License with NRC form 241

3. Name, address, phone number of responsible local representative and

Radiation Safety officer (RSO) named on their license.

4. Copy of part of the Air Force Contract describing work to be done and inclusive dates of the work.

5. An acknowledgement that the installation RSO can make periodic checks on use of the equipment.

ATTACHMENT 01 FA4626-XX-X-XXXX

GENERAL REQUIREMENTS 01 00 00 - 14

3.23 REFERENCES

A. All references listed in these specifications are intended to be the current version or edition.

3.24 ENERGY EFFICIENT PRODUCTS

A. All equipment supplied under this contract that requires energy usage shall be ENERGY STAR compliant.

END OF SECTION 01 00 00

ATTACHMENT 01 FA4626-XX-X-XXXX

SECURITY 01 00 10 - 1

SECTION 01 00 10

SECURITY

PART I - GENERAL

1.1 IDENTIFICATION OF EMPLOYEES

1.1.1. The Contractor shall furnish an Entry Authority List (EAL), attached, of employees needing access on base to the Base Contracting Officer. Employees without a badge and identification in their possession will be denied access to the base and work areas. All security issues will be discussed during the preconstruction conference. Note that it may take up to 14 calendar days after submitting EAL to be cleared to receive badge.

1.2. All contractors shall abide by all real world FPCON measures, RAMs, shelter-in-place, evacuations, and lock-down notices as directed. ID badges, vehicles, and hand-carried items will be searched.

1.2.1 Antiterrorism Force Protection

During the course of this contract, the Base may be under Force Protection Conditions (FPCONS). FPCONS are as follows:

FPCON ALPHA: This condition applies when there is a general threat of possible terrorist activity against personnel and facilities, the nature and extent of which are unpredictable, and circumstances do not justify full implementation of FPCON BRAVO measures. However, it may be necessary to implement certain measures from higher FPCONS resulting from intelligence received or as a deterrent. The measures in this FPCON must be capable of being maintained indefinitely.

FPCON BRAVO: This condition applies when an increased and more predictable threat of terrorist activity exists. The measures in this FPCON must be capable of being maintained for weeks without causing undue hardship, affecting operational capability, and aggravating relations with local authorities.

FPCON CHARLIE: This condition applies when an incident occurs or intelligence is received indicating some form of terrorist action against personnel and facilities is imminent. Implementation of measures in this FPCON for more than a short period probably create hardship and affect the peacetime activities of the unit and its personnel.

FPCON DELTA: This condition applies in the immediate area where a terrorist attack has occurred or when intelligence has been received that terrorist action against a specific location or person is likely. Normally, this FPCON is declared as a localized condition. If the Contractor should notice anything suspicious during the course of his work, the Contractor should contact the 911 Dispatch Center at 406-731-3895 as soon as possible. Point of Contact for FPCON conditions/actions is 341st Space Wing AT/FP Section, phone 406-731-4105.

END OF SECTION 01 00 10

ATTACHMENT 01 FA4626-XX-X-XXXX

SECURITY 01 00 10 - 2

ATTACHMENT 01 FA4626-XX-X-XXXX

BUILDING DEMOLITION 02 41 16 -1

SECTION 02 41 16

BUILDING DEMOLITION

PART 1 - GENERAL

1.1 GENERAL

A. Demolition of facility is exactly that; complete wrecking and removal with little regard for salvaging materials or construction items. The facility construction is as shown on the drawings.

B. Demolition work requires a submittal by the Contractor of a proposed schedule of his demolition operations. This schedule will be coordinated with the Contracting Officer’s Technical Representative, (COTR).

C. Malmstrom Air Force Base has extensive requirements for protection of personnel during demolition operations. In addition, stringent requirements for control of dust, dirt and other pollutants are enforced.

D. Special procedures must be taken if Lead Based Paint or asbestos-containing materials are encountered during removal operation. (Refer to Section 02 82 13 and 02 83 33).

1.2 SUMMARY

A. Section Includes:

1. Remove existing structures within the construction boundary lines as indicated.

2. Remove all exterior walls, interior walls, roof, and other portions of building not specifically mentioned.

3. Remove all footings and foundation walls to the depths shown on the drawings.

4. Remove all plumbing systems and equipment, including fixtures, piping, valves, insulation, water heaters, pumps, meters and associated devices.

5. Remove all fire protection systems and equipment, including extinguishers, piping, valves, sprinkler heads, air compressors, hoses, pumps, meters and associated devices.

6. Remove all heating systems and equipment, including water heaters, boilers, piping, valves, insulation, terminal units, pumps, controls and associated devices.

ATTACHMENT 01 FA4626-XX-X-XXXX

BUILDING DEMOLITION 02 41 16 -2

7. Remove all ventilation systems and equipment, including air handlers, fans, ductwork, dampers, insulation, terminal units, diffusers, grilles, louvers, controls and associated devices.

8. Remove all electrical systems and equipment, including transformers, switches, switches, switch gear, panel boards, generators, devices, boxes, light fixtures, conduit, wire, meters and associated devices.

9. Remove all communication systems and equipment, including transformers, switches, control panels, alarms, annunciators, speakers, detectors, transmitters, receivers, amplifiers, devices, boxes, conduit, wire and associated devices.

B. Remove and dispose of existing site elements as indicated, including bollards, sidewalks, paving and utility lines within construction limit lines as shown on drawings and out to street curb or as required.

C. Deactivate and disconnect all utilities serving building to be demolished. See the construction drawings for requirements.

D. Provide necessary trench shoring and bracing.

1.3 RELATED SECTIONS

A. Section 31 22 00 - Earthwork: Backfill and compaction and regrading of disturbances due to demolition work.

1.4 RELATED DOCUMENTS

A. Drawings, general provisions of contract, including General and Supplementary Conditions, and Division 1, Specification sections, apply to work of this section.

1.5 DESCRIPTION OF WORK

A. Extent of demolition work is shown on drawings and established by specifications.

B. Schedule of Demolition Work.

Demolition requires removal and disposal, off site, of the following:

1. Facilities as indicated on drawings

2. Site improvements, sidewalks, fire hydrant and miscellaneous items as shown on the construction drawings.

3. Removal of foundations, footings and supporting walls.

ATTACHMENT 01 FA4626-XX-X-XXXX

BUILDING DEMOLITION 02 41 16 -3

1.6 SUBMITTALS

A. Schedule

1. Submit a "Demolition and Removal Plan" to the Montana DEQ and the COTR after Notice to Proceed. Plan shall include, but will not be limited to the following items:

a. Schedule of Demolition including both time to fully complete each phase and individual work items in each phase.

b. Method of dust/debris particle abatement.

c. Method of demolition: To include equipment, method, handling, safety procedures, and pollution controls.

d. Place of disposal to include copy of current landfill license, letter of authorization or copy of listing from State of Montana.

e. Coordination for shut-off, capping, plugging, and/or continuation of utility services as required.

f. The intent of plan is to provide all necessary steps to accomplish the work, defining how it will be accomplished, and when it will be completed. No demolition will be started until plan is approved by the Contracting Officer.

1.7 JOB CONDITIONS

A. Occupancy

Structures to be demolished will be vacated and discontinued in use prior to start of work.

B. Condition of Structures

Base assumes no responsibility for actual condition of structure to be demolished.

Conditions existing at time of inspection for bidding purposes will be maintained by base in so far as practicable. Facilities will be vacant during bidding period. Lists of materials to be salvaged by the Contractor and delivered to the government are indicated on the construction drawings.

C. Partial Removal

Items of salvable value to Contractor may be removed from structure prior to demolition. Salvaged items must be transported from site as they are removed.

ATTACHMENT 01 FA4626-XX-X-XXXX

BUILDING DEMOLITION 02 41 16 -4

Storage or sale of removed items on site will not be permitted.

D. Explosives: Use of explosives will not be permitted.

1.8 PROTECTIONS

A. Ensure safe passage of persons around area of demolition. Conduct operations to prevent injury to adjacent buildings, structures, other facilities, and persons.

B. Provide interior and exterior shoring, bracing, or support to prevent movement, settlement or collapse of structures as determined by Contractor during interior demolition.

1.9 DAMAGES

A. Promptly repair damages caused to adjacent facilities by demolition operations at no cost to Malmstrom Air Force Base.

Not applicable.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Pollution Controls

Use water sprinkling, temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in air to lowest practical level. Comply with governing regulations pertaining to environmental protection.

Do not use water when it may create hazardous or objectionable conditions such as ice, flooding, and pollution.

Clean adjacent structures and improvements of dust, dirt, and debris caused by demolition operations, as directed by Contracting Officer. Return adjacent areas to condition existing prior to completion of work and final payment.

B. Facility Demolition

Demolish facility completely and remove from site. Use such methods as required to complete work within limitations of environmental regulations.

Proceed with demolition in systematic manner.

ATTACHMENT 01 FA4626-XX-X-XXXX

BUILDING DEMOLITION 02 41 16 -5

Break up and remove concrete slabs-on-grade, unless otherwise shown to remain.

C. Below-Grade Construction

Demolish foundation walls and footings completely and remove from the base.

D. Fillings Basements and Voids

Completely fill below-grade areas and voids resulting from demolition of structures.

See Section 31 22 00.

E. Disposal of Demolished Materials

General: Remove from site debris, rubbish, and other materials resulting from demolition operations.

Burning of removed materials from demolished structures will not be permitted on site.

Removal: Transport materials removed from demolished structures and dispose of off site.

3.2 Clean Up

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by demolition operations, as directed by Contracting Officer. Return adjacent areas to condition existing prior to completion of work or as stated in the drawings.

END OF SECTION 02 41 16

ATTACHMENT 01 FA4626-XX-X-XXXX

ABATEMENT OF ASBESTOS-CONTAINING MATERIALS 02 82 13 -1

SECTION 02 82 13

ABATEMENT OF ASBESTOS-CONTAINING MATERIALS

PART 1 – GENERAL

1.1 SUMMARY

A. The work covered by this section includes the handling of friable and nonfriable materials containing asbestos which may be encountered during removal and renovation operations, and the procedures and equipment required to protect workers and occupants of the building or area from contact with airborne asbestos fibers. The asbestos work includes the abatement, removal, and disposal of all asbestos-containing materials encountered within the scope of this project. The asbestos control area for the removal of asbestos-containing materials shall be considered to be the immediate area from which materials are being removed. Control area boundaries shall be proposed by the Contractor and subject to approval by the Contracting Officer.

B. The project work areas have been inspected for the presence of asbestos-containing materials (ACM). Results from the asbestos survey indicated that four materials were confirmed positive for containing asbestos in Building 1705. The asbestos abatement at the facility will include all the ACM that will be impacted by the planned demolition. The demolition will include abatement of the following ACM as described below:

1. Alternating black and white floor tiles from Rooms 19, 21, 22, 25-27.

2. Green floor tiles with black streaks from Room 31.

3. Gray sealant around door infills located on the exterior wall of Room 31 next to the loading dock.

4. Transite siding and roofing from Room 29.

A copy of the asbestos inspection report for Demo Building 1705 is located in

Attachment A at the end of this document, and a map showing ACM areas is included on Attachment B.

1.2 REFERENCES

A. Definitions

1. Abatement. Procedures to control fiber release from asbestos-containing building materials. Includes repair, encapsulation, enclosure, and removal.

ABATEMENT OF ASBESTOS-CONTAINING MATERIALS 02 82 13 -2

2. Action Level. There is no federal action level for asbestos because the sampling and analytical method is not reliable below the time-weighted average (TWA) of 0.1 fibers per cubic…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .