as-needed_soil_stabilizer_payment_schedule.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
RFQ - AS-NEEDED SOIL STABILIZER (RESERVED FOR SMALL LOCAL BUSINESSES)
Solicitation number
BPM013318
Issued by
California

About this file

This is a payment schedule document for an as-needed soil stabilizer contract reserved for small local businesses in California. The schedule outlines the pricing structure and payment terms associated with the RFQ for soil stabilizer services. The document establishes a framework for compensating vendors on an as-needed basis, with payments structured according to specified unit rates and delivery quantities. The contract allows for flexible ordering based on actual project requirements rather than committing to a fixed quantity upfront, enabling the procuring agency to request soil stabilizer services as operational needs arise throughout the contract term.

The payment schedule likely details unit pricing for soil stabilizer materials, potential volume discounts or tiered pricing structures, and conditions under which payments are triggered based on delivery and acceptance of materials. As a small business set-aside, the contract is restricted to qualified small local businesses, which may include women-owned, minority-owned, or disadvantaged business enterprises depending on California's specific small business criteria. The schedule serves as a critical reference document for both the contracting agency and awarded vendors to ensure transparent, consistent compensation and facilitate efficient procurement of soil stabilizer products on an as-needed basis throughout the contract period.

View the file

Other files

File Type Posted
rfq_13318_as-needed_soil_stabilizer.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 13318 - PAYMENT SCHEDULE

DEPARTMENT OF PUBLIC WORKS - AS-NEEDED SOIL STABILIZER

PAYMENT SCHEDULE

1 Fully Burdened rate shall be used for all hourly rates. The fully burdened hourly rates shall include vehicle expenses, parking, tolls, computer usage, printing, document reproduction, travel, mileage, and all expenses incurred in completing such services.

2 All amounts in the “Estimated Quantity” column are only estimates; the actual amount of work performed on each site may vary from year to year.

INITIAL YEAR
ITEM NO.As needed Soil Stabilizer - Proposed Brand:
Dust Control Plus / Rhino SnotESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED PRICE
1SOIL STABILIZER17TOTE$ - 0
2FREIGHT COST TO GILLESPIE FIELD AIRPORT1PER DELIVERY$ - 0
INITIAL TERM TOTAL:$0.00
OPTION YEAR 1
ITEM NO.As needed Soil Stabilizer - Proposed Brand:
Dust Control Plus / Rhino SnotESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED PRICE
1SOIL STABILIZER17TOTE$ - 0
2FREIGHT COST TO GILLESPIE FIELD AIRPORT1PER DELIVERY$ - 0
OPTION YEAR 1 TOTAL:$0.00
OPTION YEAR 2
ITEM NO.As needed Soil Stabilizer - Proposed Brand:
Dust Control Plus / Rhino SnotESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED PRICE
1SOIL STABILIZER17TOTE$ - 0
2FREIGHT COST TO GILLESPIE FIELD AIRPORT1PER DELIVERY$ - 0
OPTION YEAR 2 TOTAL:$0.00
OPTION YEAR 3
ITEM NO.As needed Soil Stabilizer - Proposed Brand:
Dust Control Plus / Rhino SnotESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED PRICE
1SOIL STABILIZER17TOTE$ - 0
2FREIGHT COST TO GILLESPIE FIELD AIRPORT1PER DELIVERY$ - 0
OPTION YEAR 3 TOTAL:$0.00
OPTION YEAR 4
ITEM NO.As needed Soil Stabilizer - Proposed Brand:
Dust Control Plus / Rhino SnotESTIMATED QUANTITYUNIT OF MEASUREUNIT PRICEEXTENDED PRICE
1SOIL STABILIZER17TOTE$ - 0
2FREIGHT COST TO GILLESPIE FIELD AIRPORT1PER DELIVERY$ - 0
OPTION YEAR 4 TOTAL:$0.00
PRICING SUMMARY
TermTotal
Initial Year$0.00
Option Year 1$0.00
Option Year 2$0.00
Option Year 3$0.00
Option Year 4$0.00
TOTAL (INITIAL TERM + OPTION YEARS)$0.00

File details come from the government source that posted it. Updated .