APPENDIX A
QC CHECKLIST: BACNET
This checklist is not all-inclusive of the requirements of this specification and should not be interpreted as such.
This checklist is for (check one:)
| Pre-Construction QC Checklist Submittal |
| (Items 1-2) |
| Post-Construction QC Checklist Submittal |
| (Items 1-6) |
| Close-out QC Checklist Submittal |
| (Items 1-14) |
Initial and date each item in the spaces provided verifying that each requirement has been met.
Items verified for Pre-Construction, Post-Construction and Closeout QC Checklists Submittal:
| 1 |
| All DDC Hardware (nodes) are numbered on Control System |
Schematic Drawings.
| 2 |
| M&C software supports, and ASHRAE 135. M&C software is BTL Listed as a B-AWS. |
Items verified for Post-Construction and Closeout QC Checklist Submittal:
| 3 |
| Communication between the M&C software and ASHRAE 135 field control systems uses only ASHRAE 135. |
| 4 |
| Connections to non-ASHRAE field control systems are via a Gateway from the field control system to ASHRAE 135 or via a UMCS supported protocol without the use of a hardware Gateway. |
| 5 |
| Computer workstations and servers are installed as shown on the UMCS Riser Diagram. |
| 6 |
| Training schedule and course attendee lists have been developed and coordinated with shops and submitted. |
Items verified for Closeout QC Checklists Submittal:
| 7 |
| All points in field control systems have been discovered and are available at the M&C software. |
| 8 |
| All software has been licensed to the Government |
| 9 |
| M&C software monitoring displays have been created for all building systems, including all override and display points indicated on Points Schedule drawings. |
| 10 |
| Final As-built Drawings accurately represent the final installed system. |
| 11 |
| Default trends have been set up (per Points Schedule drawings). |
| 12 |
| Scheduling has been configured at the M&C Software (per Occupancy Schedule drawing). |
| 13 |
| O&M Instructions have been completed and submitted. |
| 14 |
| Basic Operator and Advanced Training courses have been completed. |
(QC Representative Signature) (Date)