Appendix A - Final RFP Drawings.pdf
PDF 21 MB Posted
- Solicitation number
- W912DS22R0010
About this file
This document outlines a firm fixed price request for proposal for expansion of a concrete helicopter parking ramp at Fort Drum, New York. The New York District Army Corps of Engineers seeks to demolish an existing concrete landing pad, remove existing apron asphalt shoulder and edge lighting, construct eight additional concrete helicopter parking spaces totaling approximately 30,000 square yards, install new asphalt shoulder and edge lighting along the new parking spaces perimeter, install new airfield pavement markings, parking space mooring and grounding points, airfield pavement joints and sealant, and a storm water infiltration basin with pre-treatment for refueling operations runoff. Bidders should have experience with airfield pavement design and construction, obtaining airfield design approvals, and designing stormwater pre-treatment systems for refueling areas. Proposals are due on a single-step design-build basis under full and open competition from experienced contractors capable of completing the project on an active airfield.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
OMAHA DISTRICT
FORT DRUM, NEW YORK
PHOENIX APRON EXPANSION
MAY 2022
FO
_G -0
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
C O
VE
R
S H
EE
T
G-001
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_G -0
.D
W G
1:
:2
PM
/1 3/
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G 6E
D H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
US Army Corps of Engineers ®
INDEX
DESIGN FILE SHEET NO. DESCRIPTION
GENERAL
G-001 G-002
GC100
GC501
FO05_G-001.DWG
FO05_G-002.DWG
FO05_GC101.DWG
FO05_GC501.DWG
EXISTING CONDITIONS
FO05_VF101.DWG
FO05_B-301.DWG
FO05_B-302.DWG
VF101
B-301 B-302
EXISTING CONDITIONS PLAN
BORING LOGS
BORING LOGS AND LAB TESTING DATA
COVER SHEET
PROJECT LOCATION PLAN
PHASING PLAN
LOW PROFILE BARRICADES & ROPE AND BARREL FENCING DETAILS
ELECTRICAL
FO05_ES101.DWG
FO05_ES101A.DWG
FO05_ES501.DWG
ES101
ES101A
ES501
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN - OPTION #1
ELECTRICAL DETAILS
CIVIL
FO05_CD101.DWG
FO05_CD201.DWG
FO05_CS101.DWG
FO05_CS101A.DWG
FO05_CS501.DWG
FO05_CS502.DWG
FO05_CP101.DWG
FO05_CP101A.DWG
FO05_CP201.DWG
FO05_CP401.DWG
FO05_CP401A.DWG
FO05_CP501.DWG
FO05_CP502.DWG
FO05_CP503.DWG
FO05_CG101.DWG
FO05_CG101A.DWG
CD101
CD201
CS101
CS101A
CS501
CS502
CP101
CP101A
CP201
CP401
CP401A
CP501
CP502
CP503
CG101
CG101A
REMOVAL PLAN
PAVEMENT REMOVAL SECTIONS
SITE PLAN
SITE PLAN - OPTION #1
PAVEMENT MARKING DETAILS
MOORING AND GROUNDING POINT DETAILS
PAVING PLAN
PAVING PLAN - OPTION #1
PAVEMENT SECTIONS
JOINT LAYOUT PLAN
JOINT LAYOUT PLAN - OPTION #1
JOINT DETAILS
JOINT SEALANT DETAILS
REINFORCEMENT DETAILS
PRELIMINARY GRADING PLAN
PRELIMINARY GRADING PLAN - OPTION #1
E
W
E
W
E
E
W
W
CB
E
C
H
H
Observation Well
Trail
Trail
TMHRim=693.78'
NE=690.47'
SW=690.47'
Sump=685.34'
WMH-020H97
Rim=692.84' Sump=686.88'Flushing Manhole
OW
CP-99999
N 1,477,647.418 E 1,050,707.267 Elev=691.47' 5/8" Rebarwith Cap Set
CP-10001
N 1,477,626.929 E 1,050,727.002 Elev=692.69' Magnetic Nail Set
19710
19710
45TH Infantry Gate
Oneida gate
WSAAF Gate
DACA51-2-00-053
RAIL SPUR
DACA51-1-15-004
REENERGY
AREA C Laydown area for overpass construction
RT 26 and Nash Overpass - AREA E
Laydown Area by Boundary Rt 26 Overpass Area G
PARKING LOT/LAYDOWN AREA
Associated Builders and Contractors, Inc. Career Skills Training Program
\P
RT 26 and Nash Overpass - AREA F
Area A - Nash Overpass West of 26
DACA65-01-13-0019
PARCEL D SUPPORT LEASE SITE
DACA51-2-87-44
USED FOR MAP MAKING; DO NOT TRUST
DACA51-1-15-004
ELECTRICAL EASEMENT
DACA51-2-00-053
RAIL SPUR
DACA51-3-16-018
COF 1, 175
DACA65-1-05-0025
RCI LEASED LAND
DACA65-1-05-0025
RCI LEASED LAND
DACA65-1-05-0025
RCI LEASED LAND
DACA51-4-06-036
DACA51-9-08-073
DACA65-1-05-0025
DA APPROVED PARCELS FOR RCI GROUND LEASE INCLUSION
DACA65-1-05-0025
DA APPROVED PARCELS FOR RCI GROUND LEASE INCLUSION
DACA51-2-16-081
RT 26 intersection reconstruction
DACA51-2-16-081
Proposed Laydown area NYSDOT RT 26 Intersection
AREA D- Lay down area for NYSOT contractor building overpass
Area B - Nash Overpass East of 26
DACA51-3-16-080
DACA51-3-16-080
Building 2803
DACA65-1-05-0025
RCI LEASED LAND
DACA51-3-14-019
DACA51-4-11-248
DACA51-4-11-192
Subsequent license reference DACA51-4-11-250
FO
B
SH
AN
K R
O
AD
FOB SHANK ROAD
FOB SHANK ROAD
FOB SHANK ROAD
FOB SHANK ROAD
FO
B
SH
AN
K R
O
AD
FO
B
SH
AN
K R
O
AD
PO VALLEY ROAD
ONTARIO
AVE SECOND ST EAST
ONTARIO
AVE
TIGRIS RIVER VALLEY ROAD
FIFTH STREET EAST
NASH BOULEVARD
NASH BOULE
VARD
NASH BOULEVARD
OFFICERS LOOP DR S
DIVISION HILL RD W
DUNN AVE
DUNN AVE
DUNN AVE
DUNN AVE
DUNN AVE
DUNN AVE
DUNN AVE
N
IN
TH
STR
EET EAST
N
IN
TH
STR
EET EAST
NASH B
OULE
VARD
R T 971V
R T 971V
LE
W
IS
A
VE
NASH BOULE
VARD
R T
1V
R T
1V
BA
G
R
AM
R D
BA
G
R
AM
R D
BA
G
R
AM
R D
BA
G
R
AM
R D
BA
G
R
AM
R D
BA
G
R
AM
R D
BAG
R
AM
R
D
BAG
R
AM
R D
BA
G
R
AM
R D
BAG
R
AM
R
D
BA
G
R
AM
R D
BA
G
R
AM
R D
SER
VIC
E AC
C
ESS R
O
AD
M
SR TAM
PA
FA
LC
O N
T R
AI
L
M
SR TAM
PA
MSR TAMPA
SMALL ARMS RANGE ROAD
LANDFILL INSPECTION ROAD
MUNNS CORNER RD
HOT PAD ROAD
H O
T PAD
R
O
AD
AM
M
O HAUL ROAD
BAG
R
AM
R
D
AMMO HAUL ROAD
HOT PAD ROAD
AMMO HAUL ROAD
AM
M
O HAUL ROAD
UAV ROAD
UAV ROAD
UAV ROAD
UAV ROAD
UAV ROAD
SO
UT
H
TA
NK
T
RA
IL
SO
UT
H
TA
NK
T
RA
IL
RIVER TRAINING ROAD
LANDFILL INSPECTION ROAD
SMALL ARMS RANGE ROAD
BAG
R
AM
R
D
BAG
R
AM
R D
AI
R
FI
EL
D O
R D
N
AN
C E
R O
AD
LANDFILL INSPECTION ROAD
LA
N
D
FI
LL
IN
SP
EC
TI
O
N R
O
AD
SE
R
VI
C
E
AC
C
ES
S R
O
AD
LANDFILL INSPECTION ROAD
FA
LC
O N
T R
AI
L
MSR TAMPA
OFFICERS LOOP DR N
PINE LN
OFFICERS LOOP DR
FIFTH STREET EAST
FIRST STREET
RESTORE HOPE AVE
RESTORE HOPE AVE
LEWIS AVE
LE
WIS AVE
LEWIS AVE
LE
WIS AVE
LEWIS AVE
DIVISION HILL RD E
DIVISIO
N HILL RD W HOSPITAL LANE
PINE LN
PINE LN
PINE LN
OFFICERS LOOP DR S
OFFICERS LOOP DR S
PINE LN
PINE LN
PINE LN
OFFICERS LOOP DR N
OFFICERS LOOP DR N
PI
N
E
LN
PIN
E LN
DI
VI
SI
ON
HI
LL
R D
W
DUNN AVE
DUNN AVE
DUNN AVE
DUNN AVE
KEN
N
ED
Y AVE
H O
SPITAL LAN
E
KEN
N
ED
Y AVE
KEN
N
ED
Y AVE KEN
N
ED
Y AVE
KENNEDY AVE
KENNEDY AVE
RT 971V
RT 971V
RT 971V
RT 971V
RT 971V
TIGRIS RIVER VALLEY ROAD
FIRST ST EAST
FIRST ST EAST
CAMP SWIFT RD
CAMP SWIFT RD
EUPHRATES RIVER VALLEY ROAD
ALPINE LN
CAMP SWIFT RD
TIGRIS RIVER VALLEY ROAD
EUPHRATES RIVER VALLEY ROAD
SECOND ST EAST
EIG
H
TH
ST EAST
EIG
H
TH
ST EAST
EIG
H
TH
STR
EET W
EST
SEVEN
TH
ST
EIG
H
TH
ST EAST
N
IN
TH
ST W
EST
FIFTH STREET EAST
TIGRIS RIVER VALLEY ROAD
LE
R
AY
D
R
IV
E
LERAY DRIVE
LE
RA
Y
DR
IV
E
LE
RAY
D
RIV
E
PECH RIVER ROAD
ALEXANDER ST LERAY DRIVE
LERAY DRIVE
LERAY DRIVE
DELAHANTY AVE
PECH R
IV
ER R
OAD
PECH R
IV
ER R
OAD
PECH RIVER ROAD
PEC
H
R
IVER
R O
AD
NYS RO
UTE 26
NYS RO
UTE 26
PECH R
IV
ER R
OAD
PECH R
IV
ER R
OAD
PECH R
IV
ER R
OAD
PECH R
IV
ER R
OAD
PEC
H
R
IVER
R O
AD
NYS ROUTE 26
TIGRIS RIVER VALLEY ROAD
42nd INFANTRY DIVISION LOOP
42nd INFANTRY DIV RD NORTH
42nd INFANTRY DIV RD NORTH
42nd INFANTRY DIV RD SOUTH
42nd INFANTRY DIV RD SOUTH
GEORGE STREET
GEORGE STREET
GEORGE STREET
SIXTH STREET
SI
XT
H S
TR
EE
T
NETH
ERLY
S T
SEVEN
TH
ST
NETH
ERLY
S T
GEORGE STREET
JO
NES S
TR
EET
NIN
IN
GER S
T
GEORGE STREET
NIN
IN
GER S
T
LERAY DRIVE
LE
R
AY
D
R
IV
E
SIXTH STREET
LERAY DRIVE
LERAY DRIVE
PLEASANT STREET
NYS ROUTE 26
PLEASANT STREET
PECH RIVER ROAD
ANACONDA ROAD
LANDFILL INSPECTION ROAD
FA
LC
O N
T R
AI
L
LANDFILL INSPECTION ROAD
ANACONDA ROAD
AIRFIELD ORDNANCE ROAD
AM
M
O HAUL ROAD
AMMO HAUL ROAD
AMMO HAUL ROAD
AMMO HAUL ROAD
M
AI
N T
AN
K
TR
AI
L
M
AI
N
TA
NK
T
RA
IL
ANACONDA ROAD
ANACONDA ROAD
ANACONDA ROAD
AM
M
O HAUL ROAD
H O
T PAD
R
O
AD
AMMO H
AUL R
OAD
AMMO HAUL ROAD
ANACONDA RD
SER
VIC
E AC
C
ESS R
O
AD
HOT PAD ROAD
HOT PAD ROAD
AI
R
FI
EL
D O
R D
N
AN
C E
R O
AD
AI
R
FI
EL
D
O R
D N
AN
C
E R
O
AD
MUNNS CORNER RD
RIVER TRAINING ROAD
MUNNS CORNER RD
MUNNS CORNER RD
ASP R
O
AD
ASP ROADMUNNS CORNER RD
SO
UT
H
TA
NK
T
RA
IL
ASP R
O
AD
SO
UT
H
TA
NK
T
RA
IL
MUNNS CORNER RD
MUNNS CORNER RD
RIVER TRAINING ROAD
RIVER TRAINING
RO
AD
MUNNS CORNER RD
MUNNS CORNER RD
FALC
ON TRAIL
SERVICE ACCESS ROAD
SE
R
VI
C
E
AC
C
ES
S R
O
AD
MUNNS CORNER RD
MSR TAMPA
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
SMALL ARMS RANGE ROAD
SMALL ARMS RANGE ROAD
SMALL ARMS RANGE ROAD
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
M
AI
N
TA
NK
T
RA
IL
MUNNS CORNER RD
MUNNS CORNER RDMAIN TANK TRAIL
45TH IN
FANTRY DIV DR
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
PLEASANT STREET
PLEASANT STREET
PL
EA
SA
NT
S
TR
EE
T
PLEASANT STREET
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
PL
EA
SA
NT
S
TR
EE
T
45TH IN
FANTRY DIV DR
45TH IN
FANTRY DIV DR
WEST RAMP ROAD
MUNNS CORNER RD
WEST RAMP ROAD
MUNNS CORNER RD
WEST RAMP ROAD
WEST RAMP ROAD
MUNNS CORNER RD
D
ES
T R
AI
N
IN
G
C
EN
TE
R
R O
AD
BO
Y
SC
O
U
TS
A R
EA
BOY SCOUTS AREA
BOY SCOUTS AREA
W
EL
L
RO
AD
W
EL
L
RO
AD
BOY SCOUTS AREA
G
AR
R
IS
O N
L
AN
E
M
AI
N T
AN
K
TR
AI
L
M
AI
N T
AN
K
TR
AI
L
NYS ROUTE 26
G
AR
R
IS
O N
L
AN
E
NYS RO
UTE 26
LE
WIS AVE
LEWIS AVE
LEWIS AVE
M
AIN
TAN
K TR
AIL
M
AI
N T
AN
K
TR
AI
L
MAIN TANK TRAIL
M
AI
N
TA
NK
T
RA
IL
M
AIN
TAN
K TR
AIL
M
AIN
TAN
K TR
AIL
M
AI
N
TA
NK
T
RA
IL
MAIN TANK TRAIL
MAIN TANK TRAIL
WELL ROAD
W
EL
L
RO
AD
MAIN TANK TRAIL
MAIN TANK TRAIL
W
ELL RO
AD
M
UN
NS
C
ORN
ER
R D
W
ELL ROAD
WELL ROAD
MAIN
TA
NK TR
AIL
MAIN
TA
NK TR
AIL
M
AIN TANK TRAIL
M
AI
N
TA
NK
T
RA
IL
M
AI
N T
AN
K
TR
AI
L
M
AI
N T
AN
K
TR
AI
L
M
AI
N T
AN
K
TR
AI
L
CAMP HALE
ROAD
CAMP HALE
ROAD
THIRD STREET
THIRD STREET W
EST
ONTARIO
AVE
FOURTH STREET W
EST
FOURTH STREET MIDDLE
ONTARIO AVE
TIGRIS RIVER VALLEY ROAD
FIFTH STREET W
EST
OSWEGO AVE
OSWEGO AVE
OSWEGO AVE
OSWEGO AVE
EIG
H
TH
STR
EET
OSWEGO AVE
THIRD STREET
RESTORE HOPE AVE
HOSPITAL LN
NASH BOULEVARD
COLYER AVE
C O
LYER
AVE
DUNN AVE
NASH BOULEVARD
CO
LY
ER
A
VE
NYS ROUTE 26
COLYER AVE
ONTARIO AVE
ONEIDA AVE
ONTARIO AVE
ONEIDA AVE
ONTARIO AVE
ONEIDA AVE
VINCENT LN
FIFTH STREET
ONEIDA AVE
ONTARIO AVE
RESTORE HOPE AVE
TIGRIS RIVER VALLEY ROAD
HOSPITAL LN
HO
SP
IT
AL
L N
ONEIDA AVE
NYS ROUTE 26
NYS ROUTE 26
ONEIDA AVE
ONEIDA AVE
ONEIDA AVE
ONTARIO AVE
ONEIDA AVE
NYS ROUTE 26
NYS ROUTE 26
GAR
RI
SO
N
LA
NE
NYS ROUTE 26
RESTORE HOPE AVE
OSWEGO AVE
RESTORE HOPE AVE
OSWEGO AVE
OSWEGO AVE
NASH BOULEVARD
NYS ROUTE 26
NYS ROUTE 26
RESTORE HOPE AVE
FIFTH STREET W
EST
NASH BOULEVARD
NASH BOULEVARD
NASH BOULEVARD
FIFTH STREET W
EST FIFTH STREET
ONEIDA AVE
NASH BOULEVARD
NASH BOULEVARD
NASH BOULEVARD
NASH BOULEVARD
NASH BOULEVARD
NASH BOULEVARD
NASH BOULEVARD
COLYER AVE
DUNN AVE
ONEIDA AVE
ONEIDA AVE
ONEIDA AVE
ONTARIO AVE
LEWIS AVE
LEWIS AVE
LEWIS AVE
OSWEGO AVE
ONTARIO AVE
RESTORE HOPE AVE
FOURTH STREE MIDDLE
MW
R DRIVE
MAIN TANK TRAILMAIN TANK TRL
ONTARIO AVE
NYS ROUTE 26
LEWIS AVE
H O
SPITAL LAN
E
LEWIS AVE
LEWIS AVE
LEWIS AVE
LEWIS AVE
LEWIS AVE
LEWIS AVE
LEWIS AVE
OSWEGO AVE
OSWEGO AVE
RESTORE HOPE AVE
OSWEGO AVE
LEWIS AVE
W
EL
L
RO
AD
W
EL
L
RO
AD
W
EL
L
RO
AD
WELL ROAD
WELL ROAD
NYS ROUTE 26
NYS ROUTE 26
M
AI
N T
AN
K
TR
AI
L
42nd INFANTRY DIVISION LOOP
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
W
EL
L
RO
AD
W
EL
L
RO
AD
W
EL
L
RO
AD
MAIN TANK TRAIL
RESTORE HOPE AVE
OSWEGO AVE
RESTORE HOPE AVE
ONTARIO AVE
ONTARIO AVE
OSWEGO AVE
ONTARIO AVE
ONTARIO AVE
CANNON S
TR
EET
ONTARIO AVE
O
LS
EN
P
LA
ZA
ONTARIO AVE
LEWIS AVE
LEWIS AVE
LEWIS AVE
RESTORE HOPE AVE
OSWEGO AVE
OSWEGO AVE
RESTORE HOPE AVE
NYS ROUTE 26
OSWEGO AVE
OSWEGO AVE
NYS ROUTE 26
AI
R
FI
EL
D C
U
TO
FF
R
D
AIRFIELD CUTOFF RD
AI
RFI
EL
D C
UTO
FF
R D
RAILEY AVENUE
NYS ROUTE 26
BO
RL
AN
D
RO
AD
BO
RL
AN
D
RO
AD
NYS RO
UTE 26
RAILEY AVENUE
PLEASANT STREET
PL
EA
SA
NT
ST
REE
T
BO
RL
AN
D
RO
AD
BO
RL
AN
D
RO
AD
FL
AT
R O
C K
R O
AD
BO
RL
AN
D
RO
AD
BORLAND ROAD
NYS ROUTE 26
NYS ROUTE 26
NYS ROUTE 26
BO
RL
AN
D
RO
AD
BO
RL
AN
D
RO
AD
NYS ROUTE 26
NYS ROUTE 26
BE
DLA
M R
OAD
BE
DL
AM
R
O
AD
NYS ROUTE 26
NYS ROUTE 26
NYS RO
UTE 26
NYS ROUTE 26
FIRST STREET W
EST
FIRST ST W
EST
LE
WIS AVE
RESTORE HOPE AVE
RESTORE HOPE AVE
FIRST ST
FIRST ST EAST
WAREHOUSE RD
FIRST STREET W
EST
FIRST ST
LE
WIS AVE
LEWIS AVE
FIR
ST ST W
EST
FIRST ST EAST
LEWIS AVE
NASH BOULE
VARD
NASH BOULE
VARD
NASH BOULE
VARD
NASH BOULE
VARD
NASH BOULE
VARD
LEWIS AVE
THIRD STREET EAST
OSWEGO AVE
GRAY ST
G R
AY ST
G R
AY ST
G
RA
Y
ST
GRAY ST
NASH BOULE
VARD
LE
WIS AVE
QUARTERMASTER ROAD
OSWEGO AVE
OSWEGO AVE
ONTARIO
AVE
CAMP HALE
ROAD
BLIZZARD LANECAMP HALE
ROAD
GRAY ST
GRAY ST
SECO
ND ST EAST
BLIZZAR
D
LAN
E
THIRD STREET EAST
ONTARIO
AVE
ONTARIO
AVE
FLAT R
O
C K R
O
AD
FL
AT
R O
CK
R
O
AD
RUNWAY 06
-24
TAXIWAY R
TA
XI
W
AY
P
TA
XI
W
AY
B
TAXIWAY A
TA
XI
W
AY
J
RUNWAY 15-33
TAXIWAY K
TAXIW
AY ETAXIW
AY F
TAXIW
AY D
RUNWAY 8-26
TAXIWAY C
R U
N W
AY
3-
TAXIWAY G
KEYHOLE
TAXIWAY L
DE-ICE PAD TAXIWAY
TAXIWAY N
TAXIW
AY M
DE-ICE PAD
WASHRACK APRON
SOUTH RAMP
WASHRACK APRON
C-130 LOAD TRAINER
WASHRACK APRON
WASHRACK APRON
SABRE
MOUNTAIN RAMP
WARRIOR
37 38 39 40 41
43 44 45 46 47
49 50 51 52
54 55 56 57
8 9
E
W
E
W
E
W
W
CB
E
C
H
H
Observation Well
Trail
Trail
TMH
Rim=693.78'
NE=690.47'
SW=690.47'
Sump=685.34'
WMH-020H97
Rim=692.84' Sump=686.88' Flushing Manhole
OW
CP-99999
N 1,477,647.418 E 1,050,707.267 Elev=691.47' 5/8" Rebar with Cap Set
CP-10001
N 1,477,626.929 E 1,050,727.002 Elev=692.69' Magnetic Nail Set
19710
19710
FOB SHANK ROAD
SMALL ARMS RANGE ROAD
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
MUNNS C
ORNER R
D
SMALL ARMS RANGE ROAD
SMALL ARMS RANGE ROAD
SMALL ARMS RANGE ROAD
MUNNS C
ORNER R
D
WARRIOR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_G -0
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
PR
O
JE
C
T
LO
C
AT
IO
N
P
LA
N
G-002
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_G -0
.D
W G
:4
7:
P M
/1
2/
AE
C _N
C S_
4_ M
O N
O .C
TB
G
6E D
H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
PLAN
NORTH
A1 SCALE: NTS
VICINITY MAP
NEW YORK
ALBANY
F10 SCALE: NTS
PROJECT LOCATION PLAN
WSAAF GATE
CONTRACTOR
HAUL ROUTE
PROJECT LOCATION
CONTRACTOR
HAUL ROUTE
OPTION #1
BASIC
NYS ROUTE 26
NYS ROUTE 26
MUNNS CORNER RD HAUL ROUTE NOTES
STAGING AREA LOCATION NOTES
1. IMPROVE THE STAGING AREA AS NEEDED. IMPROVEMENTS INCLUDE BUT ARE
NOT LIMITED TO: GRADING, INSTALLING DRAINAGE SYSTEMS, IMPORTING
AGGREGATE MATERIALS TO PROVIDE A STABLE WORKING PLATFORM FOR
CONSTRUCTION EQUIPMENT. ALL NEW IMPROVEMENTS MUST BE REMOVED AT
THE COMPLETION OF THE PROJECT AND THE STAGING AREA RETURNED TO ITS
ORIGINAL PRE-CONSTRUCTION CONDITION.
2. INSTALL A TEMPORARY CHAIN LINK FENCE WITH LOCKING GATE AROUND THE
STAGING AREA. REMOVE THE FENCING AT THE COMPLETION OF THE PROJECT.
1. ALL CONTRACTOR DELIVERIES AND CONTRACTOR PERSONNEL MUST ACCESS THE
INSTALLATION THROUGH THE ONEIDA GATE AS SHOWN. THE ONEIDA GATE IS OPEN BETWEEN
0600 AND 1800 7 DAYS A WEEK, EXCLUDING FEDERAL HOLIDAYS. ACCESS TO THE AIRFIELD WILL
BE THROUGH THE GATE SHOWN ON THIS SHEET. THE CONTRACTOR MUST PROVIDE A GATE
GUARD AT THE AIRFIELD GATE ANY TIME THE CONTRACTOR IS WORKING ON THE AIRFIELD. THE
GATE SHALL REMAIN LOCKED UNLESS THE GATE GUARD IS PRESENT AT THE GATE.
2. THE CONTRACTOR MAY BE ALLOWED TO USE THE WSAAF GATE DURING CONCRETE HAULING
OPERATIONS. 14 DAYS PRIOR TO ANY CONCRETE HAULING OPERATIONS, REQUEST ACCESS TO
USE THE GATE THROUGH THE CONTRACTING OFFICER. THE REQUEST MAY OR MAY NOT BE
APPROVED BASED ON NUMBER OR GOVERNMENT PERSONNEL AVAILABLE, MILITARY
OPERATIONS OR OTHER SITUATIONS.
3. IMPLEMENT A DUST CONTROL PLAN FOR ALL HAUL ROUTES DURING HAULING OPERATIONS
FOR THE ENTIRE DURATION OF THE CONTRACT. THE DUST CONTROL PLAN SHALL MEET ALL
LOCAL, STATE AND FEDERAL REQUIREMENTS.
4. IMPROVE THE HAUL ROUTE TO MEET THE CONTRACTOR'S NEEDS. IMPROVEMENTS INCLUDE,
BUT ARE NOT LIMITED TO: GRADING; INSTALLING CULVERTS, IMPORTING AGGREGATE
MATERIALS FOR WIDENING OF UNIMPROVED PORTIONS OF THE HAUL ROUTE TO ALLOW FOR
SAFE PASSAGE OF CONSTRUCTION EQUIPMENT. ALL NEW IMPROVEMENTS MUST BE REMOVED
AT THE COMPLETION OF THE PROJECT AND THE HAUL ROUTE RETURNED TO ITS ORIGINAL
PRE-CONSTRUCTION CONDITION.
5. AT THE COMPLETION OF THE PROJECT, RESTORE ALL HAUL ROUTES BACK TO ORIGINAL
CONDITION BY REPAIRING POTHOLES, RUTS, AND SOFT YIELDING SPOTS.
6. MAINTAIN THE HAUL ROUTES SO THEY REMAIN PASSABLE AT ALL TIMES. MAINTAIN THE HAUL
ROUTES SO THAT MUD AND OR OTHER DEBRIS IS NOT PICKED UP BY TRUCK TIRES AND
TRAFFICKED ON ANY AIRFIELD PAVEMENTS OR ROADWAYS. HAUL ROUTE MAINTENANCE
REQUIREMENT IS AT NO ADDITIONAL COST TO THE GOVERNMENT.
7. ALL ROADS USED FOR HAULING SHALL REQUIRE A PRE-HAUL ROAD INSPECTION WITH FORT
DRUM DPW, THE CONTRACTOR AND USACE. THE INSPECTION WILL BE DOCUMENTED BY THE
CONTRACTOR WITH DETAILED REPORT AND EITHER VIDEO RECORDED OR PHOTOGRAPHED AND
SUBMITTED TO THE USACE. THE CONTRACTOR SHALL MAINTAIN ALL ROADS WHILE WORKING ON
THE PROJECT. UPON COMPLETION OF THE PROJECT AND AFTER THE HAUL ROADS HAVE BEEN
RESTORED TO ORIGINAL OR BETTER CONDITION, AN INSPECTION SHALL TAKE PLACE WITH FORT
DRUM DPW, THE CONTRACTOR AND USACE. THE CONTRACTOR MAY SCHEDULE AN INSPECTION
PRIOR TO THE FINAL HAUL ROAD INSPECTION FOR THE PURPOSE OF DISCUSSING AREAS THAT
MAY REQUIRE MAJOR REPAIRS. THE CONTRACTOR SHALL PROVIDE A HAUL ROAD RELEASE
SIGNED BY FORT DRUM DPW, THE CONTRACT AND USACE TO THE USACE STATING THAT THE
ROAD HAS BEEN ACCEPTED.
LEGEND
CONTRACTOR HAUL ROUTE
CONTRACTOR STAGING
AND STORAGE AREA
AIRFIELD ACCESS
GATE
INFILTRATION
BASIN
LIMITS OF RUNWAY
CLEAR ZONE
0'
100'
LIMITS OF TAXIWAY
CLEAR ZONE
PHOENIX
APRON
LIMITS OF
APRON
CLEAR ZONE
ONEIDA GATE
EIG
H
TH
ST W
8. ALL AREAS ON THE INSTALLATION OTHER THAN THE CONTRACTOR'S STAGING AREA, HAUL
ROUTE, AND CONSTRUCTION FREE ZONE ARE OFF LIMITS TO ALL OF THE CONTRACTOR'S HEAVY
EQUIPMENT AND ALL CONTRACTOR EMPLOYEES.
9. PERFORM DAILY FOD (FOREIGN OBJECT DEBRIS) CONTROL ON ALL AIRFIELD PAVEMENT THAT IS TRAVERSED BY THE CONTRACTOR'S VEHICLES OR AIRFIELD PAVEMENT THAT IS ADJACENT TO
CONTRACTOR ACTIVITIES. ALL ACTIVE AIRFIELD PAVEMENTS TRAFFICKED BY THE
CONTRACTOR'S CONSTRUCTION EQUIPMENT MUST BE CONTINUOUSLY SWEPT AND VACUUMED
CLEAN. THE CONTRACTOR MUST PROVIDE A SELF-CONTAINED PAVEMENT VACUUMING TRUCK
WHICH IS SPECIFICALLY MANUFACTURED TO CLEAN AIRFIELD PAVEMENTS. THE VACUUM TRUCK
MUST OPERATE CONTINUOUSLY DURING CONTRACTOR ACTVITIES. REFERENCE
SPECIFICATIONS FOR ADDITIONAL FOD PREVENTION REQUIREMENTS.
3-10 HANGAR
RUNWAY 15/33
W
E
W
E
E
W
W CB
E
C
H
H
Obs erv ati on
Well
Trail
Trail
TMH
Rim =69
3.7 8'
NE=69
0.4
7'
SW=69
0.4
7'
Sum p=
5.3
4'
WMH-02
0H
Rim =69
2.8 4'
Sum p=
6.8
8'
Flus hin g M an ho le
OW
CP-99
N 1, 7,6
.41
E 1, 0,7
.26
Elev =69
1.4 7'
5/8 " R eb ar with Cap
Set CP-10
N 1, 7,6
.92
E 1, 0,7
.00
Elev =69
2.6 9'
Mag ne tic Nail
Set
LC
x
45'
BASIC
OPTIO
N #1
WARRIO
R
21 13
D B
C U
D B
C U
D B
C U
D B
C U
D B
FO
D
B
FO
D B
FO
D
B
FO
0C
P21
0C
P62
0C
P63
ENV C
on st.
AFE01
AFE01
E
E
E
E
HH
H
E
H
H
E
H
E
H
E
E
E
E
HH
H
E
H
H
E
H
E
H
CB CB CB
CBCB CB
CB
CB CB CB
CBCB CB
CB
216S3
RIM
691.72
INV 684.34
216S2
RIM
691.45
INV 684.06
216S3
RIM
695.18
INV 685.25
ABD33
ABD14
RIM
696.37
INV 691.32
ABD69
CO
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
CO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_G C
1.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
PH
AS
IN
G
P
LA
N
GC101
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_G C
1.
D W
G
:4 8:
P
M
/1 2/
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G 6E
D H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
PLAN
NORTH
F1 SCALE: 1" = 100' - 0"
PHASING PLAN
100' 200'0
PHASING NOTES
PHASING, PROVIDED HEREIN, IS ESTABLISHED TO MAINTAIN AIRCRAFT OPERATIONAL CAPABILITY AND CONTINUAL ACCESS TO ARMY FACILITIES DURING CONSTRUCTION. THE CONTRACTOR WILL NOT BE ALLOWED TO INITIATE WORK UNTIL THE CONTRACTOR'S SCHEDULE DEMONSTRATES THE ABILITY TO COMPLETE THIS WORK WITHIN THE TIME FRAME REQUIRED AND IS APPROVED BY THE CONTRACTING
OFFICER.
1. CONSTRUCTION ZONE AREAS / PHASING
A. ACCESS TO THE SITE MUST BE ESTABLISHED PRIOR TO INITIATING ANY WORK. ACCESS MUST BE
COORDINATED WITH, AND APPROVED BY, THE AIRFIELD MANAGER THROUGH THE CONTRACTING
OFFICER. ACCESS TO AND FROM WORK AT THE SITE WILL BE LIMITED TO DAYLIGHT HOURS UNLESS
ADDITIONAL HOURS ARE REQUESTED BY THE CONTRACTOR AND APPROVED BY THE CONTRACTING
OFFICER. COORDINATE AFTER HOURS INSTALLATION ACCESS TWO WEEKS IN ADVANCE OF PLANNED
ACTIVITIES.
B. THE ENTIRE WORK AREA IDENTIFIED BETWEEN THE LOW PROFILE BARRICADES RUNWAY, TAXIWAY
AND APRON CLEAR ZONES WILL BE CONSIDERED A FREE ZONE (GOVERNMENT ESCORT IS NOT
REQUIRED). THE CONTRACTOR SHALL NOT ENTER THE RUNWAY/TAXIWAY CLEAR ZONES AT ANY TIME
DURING CONSTRUCTION
C. NOTIFY THE AIRFIELD MANAGER, THROUGH THE CONTRACTING OFFICER'S REPRESENTATIVE, 30
DAYS IN ADVANCE OF BEGINNING WORK ON THE AIRFIELD.
2. GENERAL REQUIREMENTS
A. ALL VEHICLES MUST HAVE COMPANY MARKINGS AND MUST HAVE AND DISPLAY FLIGHT LINE
PASSES. WITHIN THE AIRFIELD, ALL VEHICLES MUST DISPLAY AIRPORT CONSTRUCTION FLAGS CONFORMING TO FAA AC 150/5210-5D AND BE EQUIPPED WITH BEACON LIGHTS. ALL EQUIPMENT GREATER THAN 20' IN HEIGHT MUST DISPLAY AIRPORT CONSTRUCTION FLAGS CONFORMING TO FAA
AC 150/5210-5D.
B. PROVIDE A 12' WIDE ACCESS THROUGH WORK ZONES AT ALL TIMES FOR FIRE DEPARTMENT.
COORDINATE AREA WITH THE CONTRACTING OFFICER FOR APPROVAL OF LOCATIONS.
C. COORDINATE WITH THE AIRFIELD MANAGER, THROUGH THE CONTRACTING OFFICER, FOR THE EXACT LOCATION OF ALL LOW PROFILE BARRIERS AND ROPE AND BARREL FENCING. SEE SHEET
GC501 FOR LOW PROFILE BARRICADE AND ROPE AND BARREL FENCING DETAILS.
D. PROVIDE A PERSON AVAILABLE 24 HOURS A DAY FOR EMERGENCY MAINTENANCE OF LOW
PROFILE BARRICADES AND HAZARD LIGHTS. THE CONTRACTOR MUST INITIATE AND COMPLETE
REPAIRS OF LOW PROFILE BARRICADES AND HAZARD LIGHTS WITHIN ONE HOUR OF BEING NOTIFIED
BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
E. STEEL BUCKET OR BLADE EQUIPMENT MUST NOT OPERATE WITH THE BUCKET OR BLADE IN
DIRECT CONTACT WITH ANY PAVEMENT AT ANY TIME. STEEL BUCKET OR BLADE EQUIPMENT MAY BE USED TO REMOVE/REPLACE EXISTING BASE AND SUBGRADE MATERIALS. STEEL TRACKED EQUIPMENT MUST NOT BE ALLOWED ON ANY PAVEMENT AT ANY TIME UNLESS PROPER PROTECTION IS IN PLACE
TO PROTECT THE PAVEMENT FROM DAMAGE. ANY DAMAGE CAUSED TO THE EXISTING PAVEMENT
SLABS MUST BE ENTIRELY REMOVED AND REPLACED BY THE CONTRACTOR AT NO EXPENSE TO THE
GOVERNMENT.
F. ALL WORK ON THE AIRFIELD MUST BE COORDINATED WITH THE AIRFIELD MANAGER. THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) WILL PROVIDE THE CONTRACTOR WITH RADIOS AND RADIO CHARGERS TO COMMUNICATE WITH THE AIRFIELD THROUGHOUT THE CONTRACT DURATION.
G. SEE SHEET G-004 FOR STAGING AREA LOCATION, SITE ACCESS AND TEMPORARY HAUL ROAD
INFORMATION.
H. THE CONTRACTOR MUST PERFORM DAILY FOD (FOREIGN OBJECT DEBRIS) CONTROL ON ALL AIRFIELD
PAVEMENT TRAVERSED BY THE CONTRACTOR'S VEHICLES. ALL ACTIVE AIRFIELD PAVEMENTS
TRAFFICKED BY THE CONTRACTOR'S CONSTRUCTION EQUIPMENT MUST BE CONTINUOUSLY SWEPT AND
VACUUMED CLEAN. THE CONTRACTOR MUST PROVIDE A SELF CONTAINED PAVEMENT VACUUMING
TRUCK WHICH IS SPECIFICALLY MANUFACTURED TO CLEAN AIRFIELD PAVEMENTS. THE VACUUM TRUCK
MUST OPERATE CONTINUOUSLY DURING CONTRACTOR HAULING OPERATIONS. REFERENCE THE
SPECIFICATIONS FOR ADDITIONAL FOD PREVENTION REQUIREMENTS.
I. PROTECT THE EXISTING AIRFIELD LIGHTS AND/OR NAVAIDS DURING CONSTRUCTION. IF ANY EXISTING AIRFIELD LIGHTS AND/OR NAVAIDS ARE DAMAGED, IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
REPAIR/REPLACE ANY DAMAGED AIRFIELD LIGHTS AND/OR NAVAIDS AT NO ADDITIONAL COST TO THE GOVERNMENT. USE QUALIFIED TRADESMEN AND APPROVED EQUIPMENT FOR REPAIRS/REPLACEMENTS
AND ALL FINISHED WORK MUST BE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
J. ALL UTILITIES THAT ARE NOT MARKED FOR REMOVAL ON THE PLANS MUST BE PROTECTED IN PLACE.
K. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND MAINTAINING ALL ENVIRONMENTAL
PERMITTING REQUIRED FOR THE CONSTRUCTION OF THE PROJECT.
L. SUBMIT A DUST CONTROL PLAN FOR APPROVAL.
M. ALL SOIL, PCC AND ACC REMOVED FROM THE CONSTRUCTION SITE MUST BE IMMEDIATELY
DISPOSED OF BY THE CONTRACTOR OFF OF GOVERNMENT PROPERTY AT THE CONTRACTOR'S
EXPENSE. EXCESS SOIL, PCC AND ACC SHALL BE IMMEDIATELY REMOVED FROM THE AIRFIELD.
STOCKPILING OF MATERIAL WITHIN THE AIRFIELD FENCE WILL BE ALLOWED.
N. COORDINATE ANY CLOSURES WITH THE AIRIFIELD MANAGER, THRU THE CONTRACTING OFFICER'S REPRESENTATIVE, AND OBTAIN AIRFIELD MANAGEMENT APPROVAL, IN WRITING, PRIOR TO CLOSING ANY
OPERATIONAL AREAS TO AIRCRAFT OPERATIONS.
O. PRIOR TO BEGINNING ANY WORK ON THE AIRFIELD, INSTALL THE LOW PROFILE BARRICADES AND CLOSED TAXIWAY CROSSES AT THE LOCATION DIRECTED BY THE AIRFIELD MANAGER, THRU THE
CONTRACTING OFFICER.
P. THE CONTRACTOR SHALL COMPLY WITH UFC 3-260-01 APPENDIX B SECTION 14 CONSTRUCTION
PHASING PLAN AND OPERATIONAL SAFETY ON AIRFIELDS DURING CONSTRUCTION.
Q. SIXTY (60) DAYS PRIOR TO BEGINNING CONSTRUCTION, SUBMIT ALL INFORMATION NECESSARY TO THE AIRFIELD MANAGER, THROUGH THE CONTRACTING OFFICER, FOR THE AIRFIELD MANAGER TO SUBMIT FORM 7460-1 TO NOTIFY THE FAA OF A PROJECT THAT WILL AFFECT NAVIGABLE AIRSPACE.
LEGEND
CONTRACTOR STAGING
AND STORAGE AREA
SHEET KEYNOTES
1. LOW PROFILE BARRICADES - SEE SHEET GC501.
2. OPERATIONAL AIRCRAFT TOWWAY TO EXISTING HANGARS.
3. LIMITS OF THE RUNWAY CLEAR ZONE(500' OFFSET FROM
RUNWAY CENTERLINE. KEEP OUTSIDE OF THE CLEAR ZONE AT
ALL TIMES DURING CONSTRUCTION. INSTALL ROPE AND
BARREL FENCING TO PREVENT INADVERTENT ACCESS TO THE
CLEAR ZONE.
4. LIMITS OF THE TAXIWAY CLEAR ZONE (100' OFFSET FROM
TAXIWAY CENTERLINE). KEEP OUTSIDE OF THE CLEAR ZONE
AT ALL TIMES DURING CONSTRUCTION. INSTALL ROPE AND
BARREL FENCING TO PREVENT INADVERTENT ACCESS TO THE
CLEAR ZONE.
5. LIMITS OF THE APRON CLEAR ZONE (75' OFFSET FROM THE
EDGE OF THE FULL STRENGTH PAVEMENT.
R. THE SUPERINTENDENT SHALL HAVE CONSTANT RADIO CONTACT WITH THE CONTROL
TOWER. THE RADIO WILL BE PROVIDED TO THE CONTRACTOR BY THE AIRFIELD MANAGER.
6'-0" MIN TO 10'-0" MAX
" M
AX
10"
LOW PROFILE BARRICADE NOTES:
1. LOW PROFILE BARRICADES SHALL BE ANCHORED OR OF SUFFICIENT WEIGHT TO PREVENT OVERTURNING DUE TO
HIGH WINDS, JET ENGINE BLAST OR ROTOR WASH.
2. BARRICADES SHALL COMPLY WITH THE REQUIREMENTS OF FAA ADVISORY CIRCULAR 150/5370-2E AND UFC 3-260-04.
3. LOW PROFILE BARRICADES SHALL BE SPACED AT A MAXIMUM OF 10 FOOT INTERVALS AT LOCATIONS INDICATED.
4. FLASHING RED LIGHTS SHALL HAVE AT LEAST 5 CANDELAS EFFECTIVE INTENSITY AND FLASH AT A RATE OF 55 TO 160 FLASHES PER MINUTE. LIGHTS MUST BE OPERATED BETWEEN SUNSET AND SUNRISE AND DURING PERIODS OF LOW
VISIBILITY WHENEVER THE AIRPORT IS OPEN FOR OPERATIONS.
5. THE CONTRACTOR SHALL HAVE A PERSON AVAILABLE 24 HOURS A DAY FOREMERGENCY MAINTENANCE OF LOW PROFILE BARRICADES AND HAZARD LIGHTS. THE CONTRACTOR SHALL INITIATE AND COMPLETE REPAIRS OF LOW PROFILE BARRICADES AND HAZARD LIGHTS WITHIN ONE HOUR OF BEING NOTIFIED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE.
6. REFLECTIVE STRIPES SHALL BE ON ALL LONGITUDINAL SIDES EXCEPT BOTTOM.
E1 TYPICAL LOW PROFILE BARRICADE DETAIL
NO SCALE
L L 10' C TO C
SEE NOTE 3
L L
0'
C T
O C
SE
E
N O
TE
A1 TYPICAL LOW PROFILE BARRICADE PLACEMENT DETAIL
NO SCALE
G13 TYPICAL BARREL DETAIL
NO SCALE
E13 ROPE AND BARREL FENCE TYPICAL PLAN DETAIL
NO SCALE
3'-0"
AP
PR
O X
-3
/4
A13 ROPE AND BARREL FENCE TYPICAL ELEVATION DETAIL
NO SCALE
E7 TYPICAL FENCE / BARRICADE CORNER DETAIL
NO SCALE
A7 TYPICAL FENCE CORNER DETAIL
NO SCALE
ROPE AND BARREL FENCE NOTES:
1. 55-GALLON STEEL BARRELS USED IN ROPE AND BARREL FENCE MAY BE NEW OR USED. THE CONTRACTOR SHALL HAVE THE OPTION OF USING NEW OR USED POLYETHYLENE BARRELS IN LIEU OF STEEL BARRELS SHOWN.
POLYETHYLENE BARRELS SHALL BE APPROXIMATELY THE SAME HEIGHT AS STEEL BARRELS SHOWN AND SHALL
HAVE EQUIVALENT ORANGE AND WHITE STRIPES.
2. BARRELS SHALL BE PARTIALLY FILLED WITH SAND OR OTHER SUITABLE BALLAST AS NEEDED TO PREVENT
OVERTURNING.
3. BARRELS SHALL BE SPACED AT 20-FOOT INTERVALS ALONG THE FENCE.
4. THE CONTRACTOR SHALL HAVE THE OPTION OF PROVIDING 1/2-INCH DIAMETER RED NYLON ROPE WITH SURVEYING RIBBON OR RED OR ORANGE PLASTIC FLAGGING MATERIAL FOR FENCE SHOWN. SURVEYING RIBBON SHALL BE RED OR ORANGE, A MINIMUM OF 2-FOOT IN LENGTH, AND SHALL BE SPACED AT 3-FOOT INTERVALS ALONG
THE NYLON ROPE.
5. SAFETY LATCH HOOKS SHALL BE PROVIDED ON ONE END OF EACH SECTION OF NYLON ROPE OR FLAGGING MATERIAL FOR CONNECTION TO I-BOLTS. THE OPPOSITE END OF THE ROPE OR FLAGGING MATERIAL SHALL BE
SECURELY ATTACHED TO THE "I" BOLTS.
6. THE CONTRACTOR SHALL MAINTAIN THE CONTRACTOR WORK AREA FENCE THROUGHOUT THE DURATION OF THE CONTRACT. UPON COMPLETION OF THE CONTRACT, ALL MATERIALS USED IN THE FENCE SHALL BECOME THE
CONTRACTOR'S PROPERTY AND SHALL BE DISPOSED OF OFF THE GOVERNMENT PREMISES.
FLASHING RED LIGHT
SEE NOTE 4
CONSTRUCTION
AREA
CONSTRUCTION
LOW PROFILE BARRICADES CORNER LOW PROFILE
BARRICADES (2)
SOLID ORANGE STRIPE
SOLID WHITE STRIPE
APPROXIMATELY 7"
WIDE STRIPES (TYP)
TIE ROPE SECURELY
TO EYEBOLT
55 GALLON STEEL BARREL
1/4" DIA EYEBOLT WITH
NUT AND WASHER (TYP)
SAFETY LATCH HOOK
FOR EASY OPENING
1/2" RED NYLON ROPE
2' MIN LENGTH RED OR ORANGE
SURVEYING RIBBON
1/4" DIA EYEBOLT WITH
NUT AND WASHER
55 GALLON STEEL BARRELGROUND
PLASTIC
FLAGGING
MATERIAL
PLASTIC
FLAGGING
MATERIAL
BARRELS
LOW PROFILE
BARRICADES
BARREL AT PAVEMENT EDGE
LINE OF BARRELS
EDGE OF PAVEMENT
PAVED AREAPAVED AREA
TURFED AREATURFED AREA
BARRELS (TYP)
CORNER
BARREL
PAVED AREAPAVED AREA
TURFED AREATURFED AREA
EDGE OF PAVEMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_G C
1.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
D
ET
AI
LS
LO
W
P R
O
FI
LE
B
AR
R
IC
AD
ES
R O
PE
A
N D
B
AR
R
EL
F
EN
C
IN
G
GC501
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_G C
1.
D W
G
:4 8:
P
M
/1 2/
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G 6E
D H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
D
W
W
D
D
E
W
W CB
E
C
STMH
HVCP
HVCP
HVCP
HVCP
BSCHK
STBY
PT
PT
PT
WV
CONC
WV
EC
BSCHK
PT
BSCHK
BSCHK
BSCHK
STMH
PT
PT
STMH
PT
PT
BSCHK
PT
PT
BSCHK
PT
ECEC
BSCHK
PT
WV
WMH
CBR
INV
ESC
ESC
COUT
BSCHK
BSCHK
BSCHK
EC
PT
4.4
2.0
2.4
1.1
2.6
2.0
5.7
5.6
5.8
3.2
4.9
2.4
1.7
2.2
2.4
4.8
2.0
2.4
2.0
3.1
4.0
2.1
0.0
3.4
3.2
2.0
2.4
2.1
2.0
3.5
4.5
4.4
2.4
3.2
2.8
2.8
2.7
6.7
6.8
6.7
7.1
2.0
2.0
0.2
3.3
3.1
NS
NSNS NS
STSY
LIG
HT
LIG
HT
LIG
HT
JO
IN
T
CNR
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
CNR EP
CNR EP
LIG
HT
IN RCP
6IN
CNR EP
LIG
HT
H
" R
C P
CB
Rim
=69 2.7
3'
SW In v=
8.2
8'
Sum p=
7.4
4'
DMH-19
9D
Rim =69
4.4 8'
NE In v=
7.2
3'
SW In v=
7.1
7'
NW In v=
Ina cce ssi ble
Sum p=
7.2
1'
DMH-21
6D
Rim =69
3.2 2'
NE In v=
6.4
2'
SE In v=
6.4
2'
Sum p=
6.4
2'
DMH-21
6D
Rim =69
0.0 5'
SE In v=
6.1
4'
NW In v=
5.9
4'
Sum p=
6.1
1'
" R
C P
" R
C P
60" RCP
60" RCP
Existing 12" RCP Capped andAbandoned per Design Plans
Inv .=68
6.7 3'
Obs erv ati on
Well
"P
HX RAMP"
Gravel Road
Gravel Road
Trail
Trail
Inf iltr ati on
Tren ch
EMH
Rim
=69 1.7
1'
Una ble to
Rem ov e L id
EMH
Rim
=69 3.7
9'
NE=69
0.1
0'
SW=69
0.1
0'
Sum p=
4.6
8'
TMH
Rim
=69 3.7
8'
NE=69
0.4
7'
SW=69
0.4
7'
Sum p=
5.3
4'
EMH
Rim
=69 5.6
0'
NE=68
9.9
7'
SE=68
9.9
7'
SW=68
9.9
7'
NW=68
9.9
7'
Sum p=
8.8
9'
EMH
Rim
=69 4.2
7'
WMH-02
0H
Rim =69
2.8 4'
Sum p=
6.8
8'
Flus hin g M an ho le
60" RCP
692 693
OW
Corn er
Con cre te
N:1, 8,6
.37
E:1, 0,1
.14
Elev .=69
2.2 2' Corn er Con cre te
N:1, 8,1
.15
E:1, 0,6
.68
Elev .=69
3.3 2'
Corn er
Con cre te
N:1, 9,0
.24
E:1, 0,4
.43
Elev .=69
4.5 2'
Corn er
Con cre te
N:1, 8,5
.52
E:1, 0,9
.48
Elev .=69
5.8 3'
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
E E
E E
E E
E
E E E E E E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E E E EE E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E E E E ELCx LCx LCx
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SD
x
SDx
SDx
SDx
SD
S D x
S D x
S D x
S D x
S D x
S D x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
Wx Wx Wx Wx
" P
VC
60" RCP
" F
.W
8" F
.W
8" F
.W
16" F.W.
" F
.W
16" F.W.
X X
X X
X X
X X
X X
X X
X X
X
Gravel Road
Gate
2' Dia.
Con c.
(Typ ica l)
2' Dia.
Con c.
(Typ ica l)
CP-10
N 1, 8,4
.12
E 1, 0,0
.11
Elev =69
3.3 3'
5/8 " R eb ar with Cap
Set
CP-10
N 1, 8,2
.34
E 1, 1,1
.38
Elev =69
4.9 7'
5/8 " R eb ar with Cap
Set
TMH
Rim
=69 0.9
2'
NE=68
7.5
2'
SW=68
7.5
2'
Sum p=
2.2
1'
SSMH-02
0S
Rim =69
2.4 3'
Safe ty
Cap
Ina cce ssi ble
CB-19
9D
Rim =69
2.4 8'
NE In v=
5.1
4'
NW In v=
5.3
4'
Sum p=
3.8
3'
SSMH-02
0S
Rim =69
4.7 4'
Safe ty
Cap
Ina cce ssi ble
DMH-21
6D
Rim =69
0.7 0'
SE In v=
5.5
9'
NW In v=
5.5
5'
Sum p=
5.6
8'
E x
Ex
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W x
W x
W x
W x
W x
W x
W
X X
E x
E x
E x
E x
E x
E x
E x
E x
LCx LCx
B-1
B-2
B-3
B-5
B-4
B-6
PERC-1
PERC-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_V F1
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
PL
AN
VF101
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_V F1
.D
W G
:4
8:
P M
/1
2/
AE
C _N
C S_
4_ M
O N
O .C
TB
G
6E D
H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
LEGEND
1. THE EXISTING CONDITIONS SHOWN ARE BASED ON AS BUILT DOCUMENTS, A
PRELIMINARY ENGINEERING SURVEY AND HAS BEEN SUPPLEMENTED WITH GIS
INFORMATION FROM FORT DRUM.
2. ADDITIONAL SURVEY IS REQUIRED TO COMPLETE THE DESIGN AND VERIFY
THE EXISTING CONDITIONS SHOWN. PRIOR TO DESIGN PERFORM AN
INDEPENDENT ENGINEERING SURVEY OF THE ENTIRE PROJECT SITE.
REFERENCE SPECIFICATION 01 80 00.03 FOR SURVEY REQUIREMENTS.
3. BORING AND PERCOLATION TESTS SHOWN ARE PROVIDED FOR INFORMATION
ONLY. CONTRACTOR SHALL CONDUCT A GEOTECHNICAL INVESTIGATION.
REFERENCE THE SPECIFICATIONS FOR REQUIREMENTS.
4. SEE SHEETS B-301 FOR BORING LOGS.
5. SEE SHEET B-302 FOR PERCOLATION BORING LOGS AND LAB TEST RESULTS.
GENERAL SHEET NOTES
BORING LOCATION
PERCOLATION TEST LOCATION
PLAN
NORTH
50' 100'0
A1 SCALE: 1" = 50' - 0"
REMOVAL PLAN
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_B -3
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
BO
R
IN
G
L O
G S
B-301
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_B -3
.D
W G
:4
3:
P M
/1
2/
AE
C _N
C S_
4_ M
O N
O .C
TB
G
6E D
H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_B -3
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
BO
R
IN
G
L O
G S
LA
B
TE
ST
IN
G D
AT
A
B-302
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_B -3
.D
W G
:4
4:
P M
/1
2/
AE
C _N
C S_
4_ M
O N
O .C
TB
G
6E D
H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
W
W
D
D
E
W
W CB
E
C
STMH
HVCP
HVCP
HVCP
HVCP
BSCHK
STBY
PT
PT
PT
WV
CONC
WV
EC
BSCHK
PT
BSCHK
BSCHK
BSCHK
STMH
PT
PT
STMH
PT
PT
BSCHK
PT
PT
BSCHK
PT
ECEC
BSCHK
PT
WV
WMH
CBR
INV
ESC
ESC
COUT
BSCHK
BSCHK
BSCHK
EC
PT
4.4
2.0
2.4
1.1
2.6
2.0
5.7
5.6
5.8
3.2
4.9
2.4
1.7
2.2
2.4
4.8
2.0
2.4
2.0
3.1
4.0
2.1
0.0
3.4
3.2
2.0
2.4
2.1
2.0
3.5
4.5
4.4
2.4
3.2
2.8
2.8
2.7
6.7
6.8
6.7
7.1
2.0
2.0
0.2
3.3
3.1
NS
NSNS NS
STSY
LIG
HT
LIG
HT
LIG
HT
JO
IN
T
CNR
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
LIG
HT
CNR EP
CNR EP
LIG
HT
IN RCP
6IN
CNR EP
LIG
HT
H
" R
C P
CB
Rim
=69 2.7
3'
SW In v=
8.2
8'
Sum p=
7.4
4'
DMH-19
9D
Rim =69
4.4 8'
NE In v=
7.2
3'
SW In v=
7.1
7'
NW In v=
Ina cce ssi ble
Sum p=
7.2
1'
DMH-21
6D
Rim =69
3.2 2'
NE In v=
6.4
2'
SE In v=
6.4
2'
Sum p=
6.4
2'
DMH-21
6D
Rim =69
0.0 5'
SE In v=
6.1
4'
NW In v=
5.9
4'
Sum p=
6.1
1'
" R
C P
" R
C P
60" RCP
60" RCP
Existing 12" RCP Capped andAbandoned per Design Plans
Inv .=68
6.7 3'
Obs erv ati on
Well
Gravel Road
Gravel Road
Trail
Trail
Inf iltr ati on
Tren ch
EMH
Rim
=69 1.7
1'
Una ble to
Rem ov e L id
EMH
Rim
=69 3.7
9'
NE=69
0.1
0'
SW=69
0.1
0'
Sum p=
4.6
8'
TMH
Rim
=69 3.7
8'
NE=69
0.4
7'
SW=69
0.4
7'
Sum p=
5.3
4'
EMH
Rim
=69 5.6
0'
NE=68
9.9
7'
SE=68
9.9
7'
SW=68
9.9
7'
NW=68
9.9
7'
Sum p=
8.8
9'
EMH
Rim
=69 4.2
7'
WMH-02
0H
Rim =69
2.8 4'
Sum p=
6.8
8'
Flus hin g M an ho le
60" RCP
692 693
OW
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
E E
E E
E E
E
E E E E E E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E E E EE E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E E E E ELCx LCx LCx
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SD
x
SDx
SDx
SDx
SD
S D x
S D x
S D x
S D x
S D x
S D x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
Wx Wx Wx Wx
" P
VC
60" RCP
" F
.W
8" F
.W
8" F
.W
16" F.W.
" F
.W
16" F.W.
X X
X X
X X
X X
X X
X X
X X
X
Gravel Road
Gate
2' Dia.
Con c.
(Typ ica l)
2' Dia.
Con c.
(Typ ica l)
CP-10
N 1, 8,4
.12
E 1, 0,0
.11
Elev =69
3.3 3'
5/8 " R eb ar with Cap
Set
CP-10
N 1, 8,2
.34
E 1, 1,1
.38
Elev =69
4.9 7'
5/8 " R eb ar with Cap
Set
TMH
Rim
=69 0.9
2'
NE=68
7.5
2'
SW=68
7.5
2'
Sum p=
2.2
1'
SSMH-02
0S
Rim =69
2.4 3'
Safe ty
Cap
Ina cce ssi ble
CB-19
9D
Rim =69
2.4 8'
NE In v=
5.1
4'
NW In v=
5.3
4'
Sum p=
3.8
3'
SSMH-02
0S
Rim =69
4.7 4'
Safe ty
Cap
Ina cce ssi ble
DMH-21
6D
Rim =69
0.7 0'
SE In v=
5.5
9'
NW In v=
5.5
5'
Sum p=
5.6
8'
E x
Ex
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W x
W x
W x
W x
W x
W x
W
X X
E x
E x
E x
E x
E x
E x
E x
E x
LCx LCx
EXISTING WATER VALVE
SEE NOTE 8
16" DIA. WATER LINE
TO REMAINEXISTING ELECTRICAL
MANHOLE - SEE NOTE 9
APRON EDGE LIGHT
TO BE REMOVED (TYP.)
TAXIWAY EDGE LIGHT CIRCUIT
TO BE REMOVED (TYP.)
ADJUST FINISH GRADE OF EXISTING
MANHOLE AS NECESSARY TO MATCH
NEW GRADES
379.34'
4.
207.01'
.4
6'
100'
25'25'
25'25'
25'
40.28' 52.55'
0'
2 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_C D
1.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
R
EM
O
VA
L
PL
AN
CD101
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_C D
1.
D W
G
:4 4:
P
M
/1 2/
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G 6E
D H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
LEGEND
8.5" PCC / 6" ABC / SUBGRADE
AS NECESSARY TO BE REMOVED
1. ALL EXISTING ODD SHAPED SLABS AND SLABS ARE REINFORCED WITH 0.05%
DEFORMED STEEL BARS IN BOTH DIRECTIONS.
2. SEE SHEET CD201 FOR PAVEMENT REMOVAL SECTIONS.
3. EXISTING PAVEMENT MARKINGS NOT WITHIN THE PAVEMENT REMOVAL AREA, OR
INDICATED TO BE REMOVED, THAT ARE MARRED OR REMOVED BY THE CONTRACTOR’S
OPERATIONS SHALL BE ENTIRELY REMOVED AND REPLACED BY THE CONTRACTOR AT
HIS OWN EXPENSE.
4. CARE SHALL BE TAKEN TO PREVENT DAMAGE TO EXISTING PAVEMENT TO REMAIN.
ANY EXISTING SLABS THAT ARE NOT SCHEDULED FOR REMOVAL AND REPLACEMENT
UNDER THIS CONTRACT THAT ARE DAMAGED DUE TO OPERATIONS OF THE
CONTRACTOR SHALL BE REMOVED AND REPLACED AT NO ADDITIONAL IN
ACCORDANCE WITH THE REQUIREMENTS OF THIS PROJECT AT NO ADDITIONAL COST
TO THE GOVERNMENT. PARTIAL SLAB REMOVAL/REPLACEMENT SHALL NOT BE
ALLOWED.
5. ALL PAVEMENT REMOVAL EQUIPMENT AND ANY OTHER EQUIPMENT USED ON
EXISTING PAVEMENT SHALL HAVE INFLATED RUBBER TIRES TO PREVENT DAMAGE
OF PAVEMENTS TO REMAIN.
6. NO BUCKET LOADERS, SKID LOADERS, GRADERS OR OTHER SIMILAR EQUIPMENT
WITH A STEEL BUCKET OR BLADE WILL BE ALLOWED TO OPERATE ON EXISTING
PAVEMENTS.
7. SUBMIT A PAVEMENT REMOVAL PLAN FOR REVIEW. THE PLAN SHALL ADDRESS
PAVEMENT REMOVAL METHODS AND EQUIPMENT; PAVEMENT PROTECTION FOR
EXISTING PAVEMENTS TO REMAIN; DUST CONTROL; AND STORM WATER RUNOFF
MANAGEMENT.
8. ADJUST THE ELEVATION OF THE EXISTING VALVE TO MATCH THE NEW PAVEMENT
ELEVATIONS.
9. ADJUST THE RIM ELEVATION OF THE EXISTING ELECTRICAL MANHOLE TO MATCH
THE NEW PAVEMENT ELEVATIONS.
10. SOUTH RAMP BLUE LED TAXIWAY EDGE LIGHTS CONTROLLED BY TWO 4K
REGULATORS T21 AND T21A IN BUILDING 2067. COORDINATE LOCK-OUT/TAG-OUT
PRIOR TO DEMOLITION WORK ON TAXIWAY EDGE LIGHTING WITH THE AIRFIELD
LIGHTING MANAGER, THROUGH THE CONTRACTING OFFICER.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. INITIATE ALL ASPHALT REMOVALS WITH A SINGLE, FULL DEPTH VERTICAL SAWCUT.
2. INITIATE ALL CONCRETE REMOVALS WITH A DOUBLE OR TRIPLE, FULL DEPTH
VERTICAL SAWCUT. SEE SHEET CD201 FOR DOUBLE AND TRIPLE SAWCUT DETAILS.
3. EXISTING PAVEMENT MARKING TO BE REMOVED.
3" ACC / 6" RDM / GEOTEXTILE
/ SUBGRADE AS NECESSARY
TO BE REMOVED
PORTLAND CEMENT CONCRETEPCC
ASPHALT CEMENT CONCRETEACC
AGGREGATE BASE COURSEABC
3" ACC / 6" ABC / SUBGRADE
AS NECESSARY TO BE REMOVED
RAPID DRAINING MATERIALRDM
PLAN
NORTH
50' 100'0
REMOVAL PLAN
SCALE: NTS
PCC REMOVAL SECTIONA SCALE: NTS
ACC REMOVAL SECTIONB
NOT TO SCALE
DOUBLE SAWCUT DETAIL
PCC
24"
PROVIDE A SECOND FULL
DEPTH 11
2" WIDE SAWCUT,
WITH WHEELSAW, 24" INSIDE
AREA TO BE REMOVED
PRIOR TO REMOVAL
DOWELS MAY BE PRESENT
THICKENED EDGE MAY BE PRESENT
PREVENT UNDERMINING OF
EXISTING PAVEMENT TO REMAIN
EXISTING PAVEMENT
TO BE REMOVED
NOT TO SCALE
TRIPLE SAWCUT DETAIL
PCC
12"
DOWELS MAY BE PRESENT
THICKENED EDGE MAY BE PRESENT
PREVENT UNDERMINING OF
EXISTING PAVEMENT TO REMAIN
EXISTING PAVEMENT
TO BE REMOVED18"
PROVIDE A THIRD FULL
DEPTH,
8" WIDE SAWCUT
18" INSIDE THE SECOND SAWCUT
PAVEMENT REMOVAL AREA
PAVEMENT REMOVAL AREA
INITIAL PAVEMENT
REMOVAL AREA
PAVEMENT WITHIN THIS AREA SHALL BE
BROKEN AND REMOVED WITH CARE TO
PREVENT DAMAGE TO PAVEMENT TO REMAIN.
USE OF HEAVY EQUIPMENT WHICH CAUSES
DAMAGE WILL NOT BE ALLOWED
PROVIDE A FULL DEPTH, 38" WIDE,
DIAMOND BLADE SAWCUT THROUGH
EXISTING JOINT AT LIMITS OF REMOVAL
EXISTING JOINT TYPE VARIES
PAVEMENT WITHIN THIS AREA SHALL BE
BROKEN AND REMOVED WITH CARE TO
PREVENT DAMAGE TO PAVEMENT TO REMAIN.
USE OF HEAVY EQUIPMENT WHICH CAUSES
DAMAGE WILL NOT BE ALLOWED
PROVIDE A FULL DEPTH,
8" WIDE,
DIAMOND BLADE SAWCUT THROUGH
EXISTING JOINT AT LIMITS OF REMOVAL
EXISTING JOINT TYPE VARIES
LEGEND:NOTE:
1. REMOVE EXISTING MATERIALS TO THE DEPTH NECESSARY TO INSTALL THE NEW
PAVEMENT REPLACEMENT SECTION AS SHOWN ON SHEET CP201.
2. SEE SHEET CD101 FOR EXISTING PAVEMENT THICKNESSES AND LOCATIONS.
3. IN AREAS WHERE THE NEW PAVEMENT THICKNESS IS GREATER THAN THE EXISTING
PAVEMENT REMOVED, REMOVE EXISTING BASE COURSE, SUBBASE COURSE AND/OR
SUBGRADE AS NECESSARY TO CONSTRUCT THE THICKER NEW PAVEMENT SECTION.
4. WHERE NEW PAVEMENT IS PLACED OVER EXISTING TURF AREAS, REMOVE A
MINIMUM OF 6" OF THE EXISTING TOPSOIL AND REPLACE WITH SUITABLE FILL.
5. PREVENT UNDERMINING OF EXISTING PAVEMENT TO REMAIN.
6. AT LOCATIONS OF THICKENED EDGE EXPANSION JOINTS, THE CONTRACTOR SHALL
ASSUME THAT THE PAVEMENT AT THAT LOCATION IS 1.3 TIMES THE THICKNESS OF THE
SURROUNDING PAVEMENT. THE CONTRACTOR SHALL ASSUME THAT A THICKENED
EDGE EXPANSION JOINT EXISTS AT THE FOLLOWING LOCATIONS:
- EXISTING PAVEMENT JOINTS ABUTTING EXISTING STRUCTURES.
- THE JOINT BETWEEN SLABS OF DIFFERENT SIZES.
- MISMATCHED JOINT PATTERNS.
PORTLAND CEMENT CONCRETE
ASPHALT CEMENT CONCRETE
PCC
ACC
PROVIDE A SECOND FULL
DEPTH, 38" WIDE SAWCUT
12" INSIDE AREA TO BE REMOVED
PCC
AGGREGATE BASE COURSEABC
INITIAL PAVEMENT
REMOVAL AREA
PCC
DOUBLE/TRIPLE SAWCUT NOTES:
1. WHERE EXISTING CONCRETE PAVEMENT IS TO BE REMOVED AND ADJACENT
CONCRETE IS TO BE LEFT IN PLACE, THE JOINT BETWEEN THE REMOVAL AREA
AND ADJOINING PAVEMENT TO STAY IN PLACE SHALL FIRST BE CUT FULL
DEPTH WITH A STANDARD DIAMOND-TYPE CONCRETE SAW. NEXT, A FULL
DEPTH SAW CUT SHALL BE MADE PARALLEL TO THE JOINT AT LEAST 24 INCHES
FROM THE JOINT AND AT LEAST 6 INCHES FROM THE END OF ANY DOWELS.
THIS SAW CUT SHALL BE MADE WITH A WHEEL SAW (DOUBLE SAWCUT
METHOD) OR TWO FULL DEPTH SAWCUTS WITH A STANDARD DIAMOND-TYPE
CONCRETE SAW SPACED 18 INCHES APART (TRIPLE SAWCUT). WHEEL SAWS
SHALL BE SAWS WITH LARGE DIAMETER TUNGSTEN CARBIDE TIPPED BLADES
MOUNTED ON A HEAVY-DUTY CHASSIS WHICH WILL PRODUCE A SAW KERF AT
LEAST 1-1/2 INCH WIDE. ALL SAWS SHALL BE CAPABLE OF SAWING TO THE
FULL DEPTH REQUIRED. ALL PAVEMENT TO BE REMOVED BEYOND THIS LAST
SAW CUT SHALL BE REMOVED IN ACCORDANCE WITH THE APPROVED
DEMOLITION WORK PLAN. ALL PAVEMENT BETWEEN THIS LAST SAW CUT AND
THE JOINT LINE SHALL BE REMOVED BY CAREFULLY PULLING PIECES AND
BLOCKS AWAY FROM THE JOINT FACE WITH SUITABLE EQUIPMENT AND THEN
PICKING THEM UP FOR REMOVAL. IN LIEU OF THIS METHOD, THIS STRIP OF
CONCRETE MAY BE CAREFULLY BROKEN UP AND REMOVED USING HAND-HELD
JACKHAMMERS, 30 LB OR LESS, OR OTHER APPROVED LIGHT-DUTY
EQUIPMENT WHICH WILL NOT CAUSE STRESS TO PROPAGATE ACROSS THE
JOINT SAW CUT AND CAUSE DISTRESS IN THE PAVEMENT WHICH IS TO REMAIN
IN PLACE. IN LIEU OF THE ABOVE SPECIFIED REMOVAL METHOD, THE SLAB
MAY BE SAWCUT FULL DEPTH TO DIVIDE IT INTO SEVERAL PIECES AND EACH
PIECE LIFTED OUT AND REMOVED. SUITABLE EQUIPMENT SHALL BE USED TO
PROVIDE A TRULY VERTICAL LIFT, AND SAFE LIFTING DEVICES USED FOR
ATTACHMENT TO THE SLAB.
SCALE: NTS
ACC REMOVAL SECTIONC
RAPID DRAINAGE MATERIALRDM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_C D
1.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
PA
VE
M
EN
T R
EM
O
VA
L
SE
C
TI
O
N S
CD201
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_C D
1.
D W
G
:4 4:
P
M
/1 2/
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G 6E
D H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
W
W
D
D
E
W
W CB
E
C
H
Obs erv ati on
Well
Gravel Road
Gravel Road
Trail
Trail
TMH
Rim
=69 3.7
8'
NE=69
0.4
7'
SW=69
0.4
7'
Sum p=
5.3
4'
WMH-02
0H
Rim =69
2.8 4'
Sum p=
6.8
8'
Flus hin g M an ho le
OW
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LCx LCx LCx
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SD
x
SDx
SDx
SDx
SD
S D x
S D x
S D x
S D x
S D x
S D x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
Wx Wx Wx Wx
" P
VC
60" RCP
" F
.W
8" F
.W
8" F
.W
16" F.W.
" F
.W
16" F.W.
X X
X X
X X
X X
X X
X X
X X
X
Gravel Road
Gate
2' Dia.
Con c.
(Typ ica l)
2' Dia.
Con c.
(Typ ica l)
CP-10
N 1, 8,4
.12
E 1, 0,0
.11
Elev =69
3.3 3'
5/8 " R eb ar with Cap
Set
CP-10
N 1, 8,2
.34
E 1, 1,1
.38
Elev =69
4.9 7'
5/8 " R eb ar with Cap
Set
TMH
Rim
=69 0.9
2'
NE=68
7.5
2'
SW=68
7.5
2'
Sum p=
2.2
1'
SSMH-02
0S
Rim =69
2.4 3'
Safe ty
Cap
Ina cce ssi ble
CB-19
9D
Rim =69
2.4 8'
NE In v=
5.1
4'
NW In v=
5.3
4'
Sum p=
3.8
3'
SSMH-02
0S
Rim =69
4.7 4'
Safe ty
Cap
Ina cce ssi ble
DMH-21
6D
Rim =69
0.7 0'
SE In v=
5.5
9'
NW In v=
5.5
5'
Sum p=
5.6
8'
E x
Ex
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W x
W x
W x
W x
W x
W x
W
X X
E x
E x
E x
E x
E x
E x
E x
E x
LCx LCx
S
PA
C
ES
0'
.6
5'
46.57' 42 .1
2'
46.57'
10 SPACES @ 50' = 500'
25'
R = 47' 150'60'27.4' 60' 60' 150' 60' 30' 25'
150' 60' 30'60'
38.38'
0'
R=2 5'
0'
0'
0'
0'
0'
R=2 5'
R=2 5'
R=25'R=2 5'
R=2 5'
R=2 5'
INFILTRATION BASIN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_C S1
.d w g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
SI
TE
P
LA
N
CS101
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_C S1
.D
W G
8:
:0
AM
/1 7/
AE
C
_N C
S_ 4_
M O
N O
.C
TB
G 6E
D H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
LEGEND
AIRCRAFT TIEDOWN-MOORING POINT
1. SEE SHEET CS501 FOR PAVEMENT MARKING DETAILS.
2. SEE SHEET CS502 FOR MOORING POINT AND STATIC GROUND DETAILS.
3. THE FINAL LOCATION OF ALL TIE DOWN AND GROUNDING POINTS SHOWN SHALL
BE ADJUSTED AS NECESSARY SO THAT THE DEVICES ARE A MINIMUM OF 2' FROM
A PLANNED JOINT.
4. ALL NEW PAVEMENT MARKINGS LOCATED ON CONCRETE SHALL BE OUTLINED WITH
A NON-REFLECTIVE 6” BLACK MARKING. THE 6” BLACK MARKING IS NOT SHOWN OR
DIMENSIONED ON THE DRAWINGS FOR CLARITY.
5. EXISTING PAVEMENT MARKINGS NOT WITHIN THE PAVEMENT REMOVAL AREA,
OR INDICATED TO BE REMOVED, THAT ARE MARRED OR REMOVED BY THE
CONTRACTOR’S OPERATIONS SHALL BE ENTIRELY REMOVED AND REPLACED BY
THE CONTRACTOR AT HIS OWN EXPENSE.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. CH-47 PARKING POSITION MARKING.
2. TAXILANE CENTERLINE MARKING.
3. TAXIWAY EDGE MARKING
4. 1.5' X 20' YELLOW DECEPTIVE SURFACE MARKING.
STATIC GROUND POINT
PLAN
NORTH
50' 100'0
SITE PLAN
W
W
D
D
E
W
W CB
E
C
H
Obs erv ati on
Well
Gravel Road
Gravel Road
Trail
Trail
TMH
Rim
=69 3.7
8'
NE=69
0.4
7'
SW=69
0.4
7'
Sum p=
5.3
4'
WMH-02
0H
Rim =69
2.8 4'
Sum p=
6.8
8'
Flus hin g M an ho le
OW
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LC
x
LCx LCx LCx
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U x
C U
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SD
x
SDx
SDx
SDx
SD
S D x
S D x
S D x
S D x
S D x
S D x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
Wx Wx Wx Wx
" P
VC
60" RCP
" F
.W
8" F
.W
8" F
.W
16" F.W.
" F
.W
16" F.W.
X X
X X
X X
X X
X X
X X
X X
X
Gravel Road
Gate
2' Dia.
Con c.
(Typ ica l)
2' Dia.
Con c.
(Typ ica l)
CP-10
N 1, 8,4
.12
E 1, 0,0
.11
Elev =69
3.3 3'
5/8 " R eb ar with Cap
Set
CP-10
N 1, 8,2
.34
E 1, 1,1
.38
Elev =69
4.9 7'
5/8 " R eb ar with Cap
Set
TMH
Rim
=69 0.9
2'
NE=68
7.5
2'
SW=68
7.5
2'
Sum p=
2.2
1'
SSMH-02
0S
Rim =69
2.4 3'
Safe ty
Cap
Ina cce ssi ble
CB-19
9D
Rim =69
2.4 8'
NE In v=
5.1
4'
NW In v=
5.3
4'
Sum p=
3.8
3'
SSMH-02
0S
Rim =69
4.7 4'
Safe ty
Cap
Ina cce ssi ble
DMH-21
6D
Rim =69
0.7 0'
SE In v=
5.5
9'
NW In v=
5.5
5'
Sum p=
5.6
8'
E x
Ex
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W x
W x
W x
W x
W x
W x
W
X X
E x
E x
E x
E x
E x
E x
E x
E x
LCx LCx
25'
SP
AC
ES
0'
46.57' 42 .1
2'
46.57'
10 SPACES @ 50' = 500'
150'60'27.4' 60' 60' 150' 60' 30' 25'
0'
R=2 5'
0'
R=2 5'
R=25'R=2 5'
R=2 5'
SP
AC
ES
0'
.9 3'
1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
FO
_C S1
A.
dw g
M . H
U C
KL
E
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
K.
H
AL
L
SI
TE
P
LA
N
O
PT
IO
N
CS101A
C :\T
EM
P\
N W
O
1\ G
6E D
H
BM
G \D
1\
FO
_C S1
A.
D W
G 8:
:4
AM
/1
7/
AE
C _N
C S_
4_ M
O N
O .C
TB
G
6E D
H
BM
G
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
E
O M
AH
A, N E
M
AY
FI
LE
N U
M
BE
R
FI
LE
N
AM
E:
AN
SI
D
FO
R
T D
R U
M , N
EW
Y
O R
K
PH
O
EN
IX
A
PR
O
N E
XP
AN
SI
O
N
AD
VE
R
TI
SE
M
EN
T
SE
T
LEGEND
AIRCRAFT TIEDOWN-MOORING POINT
1. SEE SHEET CS501 FOR PAVEMENT MARKING DETAILS.
2. SEE SHEET CS502 FOR MOORING POINT AND STATIC GROUND DETAILS.
3. THE FINAL LOCATION OF ALL TIE DOWN AND GROUNDING POINTS SHOWN SHALL
BE ADJUSTED AS NECESSARY SO THAT THE DEVICES ARE A MINIMUM OF 2' FROM
A PLANNED JOINT.
4. ALL NEW PAVEMENT MARKINGS LOCATED ON CONCRETE SHALL BE OUTLINED WITH
A NON-REFLECTIVE 6” BLACK MARKING. THE 6” BLACK MARKING IS NOT SHOWN OR
DIMENSIONED ON THE DRAWINGS FOR CLARITY.
5. EXISTING PAVEMENT MARKINGS NOT WITHIN THE PAVEMENT REMOVAL AREA,
OR INDICATED TO BE REMOVED, THAT ARE MARRED OR REMOVED BY THE
CONTRACTOR’S OPERATIONS SHALL BE ENTIRELY REMOVED AND REPLACED BY
THE CONTRACTOR AT HIS OWN EXPENSE.
GENERAL SHEET NOTES
SHEET KEYNOTES
1. CH-47 PARKING POSITION MARKING.
2. TAXILANE CENTERLINE MARKING.
3. TAXIWAY EDGE MARKING
4. 1.5' X 20' YELLOW DECEPTIVE SURFACE MARKING.
STATIC GROUND POINT
PLAN
NORTH
50' 100'0
SITE PLAN - OPTION #1
NOT TO SCALE
TAXIWAY / TAXILANE / APRON
EDGE MARKING DETAIL
6" 6"
6" 6"
TA
XI
W
AY
P
AV
EM
EN
T
SH
O U
LD
ER
NOT TO SCALE
TAXILANE / TAXIWAY CENTERLINE MARKING DETAIL
6"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .