This document provides sample templates and examples for design after award appendices for an initial outfitting project. It includes examples of a project room contents list, room placement plans, illustrations of furniture and casework, artwork placement plans, interior mock-up photos, move schedules, training schedules, equipment lists, signage drawings, and orientation plans. While the templates provide guidance on required deliverables, they do not specify products or services for the initial outfitting project.

View the file

Other files for this federal contract opportunity

Other files attached to Hadnot Point Initial Outfitting Project, newest first.
File Type Posted
Appendix 7.6 - REVISED Bid Schedule W9127S20Q6002.xlsx XLSX spreadsheet
W9127S20Q6002 REVISED Solicitation.docx DOCX document
W9127S20Q6002 AMENDMENT 0002.pdf PDF
Appendix 7.12 LVS DWGS and Supplemental Cutshees.pdf PDF
W9127S20Q6002 ProjNet Report.pdf PDF
W9127S20Q6002 AMENDMENT 0001.pdf PDF
Appendix 7.7 Construction Schedule.pdf PDF
Appendix 7.11 DMLSS.pdf PDF
Appendix 7.2 Monthly Risk Report.xlsx XLSX spreadsheet
Appendix 7.10 Equip Plans-List-Cutsheets Compressed.pdf PDF
Appendix 7.5 - Change Tracker.xlsx XLSX spreadsheet
Appendix 7.1 Glossary.pdf PDF
Appendix 7.9 SID.pdf PDF
W9127S20Q6002 Combined Synopsis Solicitation.pdf PDF
Appendix 7.8 CID.pdf PDF
Appendix 7.6 - Price Schedule.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 1 of 48

FY19

DIVISION 01: GENERAL REQUIREMENTS

01 10 13 Design After Award

APPENDICES

DIVISION 01: GENERAL REQUIREMENTS 01 10 13 DESIGN AFTER AWARD: APPENDICES

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 2 of 48

Table of Contents

5 01 10 13 DESIGN AFTER AWARD – EXAMPLE DOCUMENTS

5.1 PROJECT ROOM CONTENTS LIST (PRCL) – EXAMPLE

5.2 RPIE/PP & CES TYPICAL/ROOM PLACEMENT PLAN – EXAMPLE

5.3 ILLUSTRATION FURNITURE, FIXTURES & CASEWORK SHEET - EXAMPLE

5.4 ARTWORK ILLUSTRATION SHEET - EXAMPLE

5.5 ARTWORK PLACEM ENT PLAN - EXAMPLE

5.6 INTERIOR MOCK-UP PHOTOS

5.7 MASTER MOVE SCHEDULE - EXAMPLE

5.8 DEPARTMENTAL ACTIVITY SCHEDULE – EXAMPLE

5.9 RPIE/PP TRAINING SCHEDUL E – EXAMPLE

5.10 DEPARTMENTAL MOVE SPREADSHEET - EXAMPLE

5.11 RPIE/PP TESTING AND CERTIFICATION SCHEDULE – EXAMPLE

5.12 INITIAL OUTFITTING PLAN – EXAMPLE

5.13 TEMPORARY SIGNAGE DRAWING – EXAMPLE

5.14 ORIENTATION PLAN – EXAMPLE

5.15 MOVE GUIDE - EXAMPLE

5.16 FURNITURE, FIXTURES & L OW V OLTAGE CUT SHEET – EXAMPLE

5.17 DMLSS ENTRY NEW EQUIPMENT LIST – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 3 of 48

5 01 10 13 DESIGN AFTER AWARD – EXAMPLE DOCUMENTS

5.1 PROJECT ROOM CONTENTS LIST (PRCL) – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 4 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 5 of 48

5.2 RPIE/PP & CES TYPICAL/ROOM PLACEMENT PLAN – EXAMPLE

A typical example may also be found http://www.wbdg.org/ccb/browse_archive.php?o=64&c=260 http://www.wbdg.org/ccb/browse_archive.php?o=64&c=260

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 6 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 7 of 48

5.3 I LLUSTRATION FURNITURE, FIXTURES & CASEWORK SHEET - EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 8 of 48

5.4 ARTWORK ILLUSTRATION SHEET - EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 9 of 48

5.5 ARTWORK PLACEMENT PLAN - EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 10 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 11 of 48

5.6 INTERIOR MOCK-UP PHOTOS

A. ORTHOPEDIC OR

B. LABOR & DELIVERY

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 12 of 48

C. HYBRID OR CONTROL ROOM

D. HYBRID OR

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 13 of 48

E. ICU

F. MEDICAL-SURGICAL TWO-BED ROOM

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 14 of 48

5.7 MASTER MOVE SCHEDULE - EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 15 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 16 of 48

5.8 DEPARTMENTAL ACTIVITY SCHEDULE – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 17 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 18 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 19 of 48

5.9 RPIE/PP TRAINING SCHEDULE – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 20 of 48

5.10 DEPARTMENTAL MOVE SPREADSHEET - EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 21 of 48

5.11 RPIE/PP TESTING AND CERTIFICATION SCHEDULE – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 22 of 48

5.12 INITIAL OUTFITTING PLAN – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 23 of 48

5.13 TEMPORARY SIGNAGE DRAWING – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 24 of 48

5.14 ORIENTATION PLAN – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 25 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 26 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 27 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 28 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 29 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 30 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 31 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 32 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 33 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 34 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 35 of 48

5.15 MOVE GUIDE - EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 36 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 37 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 38 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 39 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 40 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 41 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 42 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 43 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 44 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 45 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 46 of 48

5.16 FURNITURE, FIXTURES & LOW VOLTAGE CUT SHEET – EXAMPLE

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 47 of 48

FY19 IDBIO MATOC (REVISED: 9 May 19) Page 48 of 48

5.17 DMLSS ENTRY NEW EQUIPMENT LIST – EXAMPLE

--End of Section--

5 01 10 13 DESIGN AFTER AWARD – example documents
5.1 Project Room Contents List (PRCL) – Example
5.2 RPIE/PP & CES Typical/Room Placement Plan – Example
5.3 Illustration Furniture, Fixtures & Casework Sheet - Example
5.4 Artwork Illustration Sheet - Example
5.5 Artwork Placement Plan - Example
5.6 Interior Mock-up Photos
A. Orthopedic OR
B. Labor & Delivery
C. Hybrid OR Control Room
D. Hybrid OR
E. ICU
F. Medical-Surgical Two-Bed Room
5.7 Master Move Schedule - Example
5.8 Departmental Activity Schedule – Example
5.9 RPIE/PP Training Schedule – Example
5.10 Departmental Move Spreadsheet - Example
5.11 RPIE/PP Testing and Certification Schedule – Example
5.12 Initial Outfitting Plan – Example
5.13 Temporary Signage Drawing – Example
5.14 Orientation Plan – Example
5.15 Move Guide - Example
5.16 furniture, fixtures & low voltage cut sheet – example
5.17 DMLSS Entry new equipment list – example